Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TRU.V ·

TRU Precious Metals Reports Additional Drill Results at Twilite Gold Project and Prepares for Drilling at Golden Rose Project

Drill Results Exploration Programs

TRU Precious Metals Reports Additional Drill Results at Twilite Gold Project

and Prepares for Drilling at Golden Rose Project

Fredericton, New Brunswick – September 15, 2021 –TRU Precious Metals Corp. (TSXV:TRU;

OTCQB:TRUIF; FSE:706) (“TRU” or the “Company”) is pleased to announce additional assays from its 12-

hole, Phase 1 diamond drilling program at its 100% -owned Twilite Gold Project in the Central Newfoundland

Gold Belt (“Twilite Gold’’). The Company is also providing an update on drilling preparations at its flagship

Golden Rose Pro ject (“Golden Rose”), also in the Central Newfoundland Gold Belt located along the deposit -

bearing Cape Ray – Valentine Lake Shear Zone.

Highlights from the latest batch of Twilite Gold drill results (Tables 1 and 2) include:

• 6.00 metres (m) grading 1.06 grams per ton (g/t) gold (Au) in drill hole TL-21-18.

• 3.00m grading 0.85 g/t Au in drill hole TL-21-20.

• Robust shear zone hosted quartz breccia system remains open along strike in all directions.

Barry Greene, VP of Property Development and Director of TRU, commented : “The strength of the alteration,

brecciation and mineralization remains intact as the gold system is continuing to the southeast. As is common,

structural complexities play a part in the distribution of gold as the gold zone is deeper than expected. We are

working to determine if this is an offset or part of a separate zone.”

Table 1. Uncut Assay Highlights

Hole No. From (m) To (m) Interval (m) Au (g/t) Zone

TL21-18* 191.00 197.00 6.00 1.06

Fort Knox TL21-20 97.32 98.00 0.68 0.33

And 225.00 228.00 3.00 0.85

And 299.00 301.00 2.00 0.53

* Results based on partial recovery from a fault zone.

Figure 1. Plan Map of Twilite Gold Drilling

Figure 2. Cross Section of Twilite Gold Drilling

Table 2. Collar Details for TL-21-18 to TL-21-21

Hole No. Azimuth (°) Dip (°) Length (m) UTM E UTM N

TL21-18 239.9 -65.9 224 589850 5408773

TL21-19* 241.0 -46.8 47 589914 5408700

TL21-20 238.4 -66.0 362 589936 5408680

TL21-21* 237.6 -46.4 122 589936 5408680

* Abandoned prematurely due to bad ground

conditions.

TRU Co -Founder and CEO Joel Freudman added: “We are pleased that we continue to encounter gold

mineralization in the results from our recently-completed inaugural drill program, and we look forward to the

remaining results, which will guide future drilling at Twilite Gold. I am even more excited about our imminent

5,000-metre diamond drill program at our flagship Golden Rose Project - with permitting now in hand, drilling

will soon be a reality. Over the past 4 months, our team has worked ardently in preparation. Golden Rose

represents a unique opportunity for TRU for numerous reasons, with the key drivers being that it is well-situated

both geologically and geographically , sandwiched between two neighbours with significant known gold

deposits.”

Golden Rose Drilling Preparations

At Golden Rose, drill permitting is now in place and a drill contract has been awarded to Logan Drilling Limited

for a planned 5 ,000m diamond drilling campaign, scheduled to begin in early to mid-October. The Company is

working closely with GoldSpot Discoveries Corp. in laying out and targeting its drill program.

TRU’s main objectives for this drill program are (1) infill drilling at the South Woods Lake Gold Zone, to better

delineate the known mineralization there, and (2) exploratory drilling at the recently-optioned King George IV

claims in hopes of making a new discovery there , following the Company’s discovery of visible gold grains on

such claims this summer, as previously announced on July 14, 2021.

As additional preparatory steps, the Company recently completed a 1 ,568 line -kilometer airborne magnetic

gradiometer survey over select portions of Golden Rose, including the King George IV claims. The Company is

also preparing for an IP/Resistivity survey at the King George IV claims.

Drilling Quality Assurance/Quality Control (“QA/QC”)

All NQ core is sampled, cut by core saw, and split by Company personnel, and put into bags with unique sample

tags for identification. The bags are sealed with a security tag and are then transported directly to the lab by TRU

staff. All rock samples are analyzed at Eastern Analytical Ltd. (“Eastern Analytical”) of 403 Little Bay Road,

Springdale, NL, a commercial laboratory that is ISO/IEC 17025 accredited and independent of TRU. Eastern

Analytical pulverized 1000 grams of each sample to 95% < 89 μm. Samples are analyzed using fire assay (30g)

with AA finish and an ICP-34, four acid digestion followed by ICP-OES analysis. All samples with visible gold

or assaying above 1.00 g/t Au are further assayed using metallic scr een to mitigate the presence of the nugget

effect of coarse gold. Standards and blanks are inserted at defined intervals for QA/QC purposes by the Company

as well as Eastern Analytical. The TRU exploration program design is consistent with industry best practices and

the program is carried out by qualified persons employing a QA/QC program consistent with National Instrument

43-101.

Qualified Person

Barry Greene, P.Geo. (NL) is a qualified person as defined by National Instrument 43-101 and has reviewed and

approved the contents and technical disclosures in this press release. Mr. Greene is a director and officer of the

Company and owns securities of the Company.

About TRU Precious Metals Corp.

TRU has assembled a portfolio of gold exploration p roperties in the highly prospective Central Newfoundland

Gold Belt. The Company has an option with a subsidiary of TSX-listed Altius Minerals Corporation to purchase

100% of the Golden Rose Project, located along the deposit-bearing Cape Ray – Valentine Lake Shear Zone. TRU

also owns 100% of the Twilite Gold Project, located along the same Shear Zone, and 3 early-stage properties

including 2 near New Found Gold Corp.’s high -grade Queensway Project. TRU’s common shares trade on the

TSX Venture Exchange under the symbol “TRU”, on the OTCQB Venture Market under the symbol “TRUIF”,

and on the Frankfurt exchange under the symbol “706”.

TRU is a portfolio company of Resurgent Capital Corp. (“Resurgent”), a merchant bank providing venture capital

markets advisory services and proprietary financing. Resurgent works with promising public and pre -public

micro-capitalization companies listing on Canadian stock exchanges. For more information on Resurgent and its

portfolio companies, please visit Resurgent’s website at https://www.resurgentcapital.ca/

For further information about TRU, please contact:

Joel Freudman

Co-Founder, President & CEO

TRU Precious Metals Corp.

Phone: 1-855-760-2TRU (2878)

Email: [email protected]

Website: www.trupreciousmetals.com

To connect with TRU via social media, below are links:

Twitter

https://twitter.com/corp_tru

LinkedIn

https://www.linkedin.com/company/tru-precious-metals-corp

YouTube

https://www.youtube.com/channel/UCHghHMDQaYgS1rDHiZIeLUg/

Facebook

https://www.facebook.com/TRU-Precious-Metals-Corp-100919195193616

Acknowledgement

TRU would like to thank the Government of Newfoundland and Labrador for financial support of the Twilite

Gold Project through the Junior Exploration Assistance Program. TRU has been approved for funding for a portion

of its 2021 exploration activities at the Twilite Gold Project.

Cautionary Statements Regarding Forward-Looking Information

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release contains certain forward-looking statements, including those relating to exploration and the drill

program at Twilite Gold and Golden Rose. These statements are based on numerous assumptions regarding Twilite

Gold and Golden Rose, and the Company’s exploration and drilling plans, that are believed by management to be

reasonable in the circumstances, and are subject to a number of risks and uncertainties, including without

limitation: mineralization hosted on a djacent and/or nearby properties is not necessarily indicative of

mineralization hosted on Twilite Gold and/or Golden Rose; the exploration potential of Twilite Gold and/or

Golden Rose and the nature and style of mineralization at such properties; risks inherent in mineral exploration

activities and operational problems relating to drilling; volatility in precious metals prices; and those other risks

described in the Company’s continuous disclosure documents. Actual results may differ materially from result s

contemplated by the forward -looking statements herein. Investors and others should carefully consider the

foregoing factors and should not place undue reliance on such forward-looking statements. The Company does

not undertake to update any forward-looking statements herein except as required by applicable securities laws.