Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TRO.V ·

Taranis Update on Exploration Permitting Delays at Thor

Exploration Programs Permits & Approvals

FOR IMMEDIATE RELEASE

Taranis Resources Inc.

681 Conifer Lane

Estes Park, Colorado

80517

www.taranisresources.com

Taranis Update on Exploration Permitting Delays at Thor

Estes Park, Colorado, January 18, 2024 – Taranis Resources Inc. (“Taranis” or the “Company”) [TSX.V:

TRO, OTCQB: TNREF] is providing an informational update on permitting work at Thor. The Province

of British Columbia’s Ministry of Energy, Mines and Low Carbon Innovation (“EMLI”) is managing the

Notice of Work Permit (“NoW”) that was filed one and one-half years ago.

In the wake of delays, T aranis filed a petition for Judicial Review with the Supreme Court of British

Columbia, seeking:

• An order to the Chief Permitting Officer to: Make a decision on the Company’s NoW

application filed August 30, 2022; and

• Declare that Minister Osbourne’s public statement that First Nations are “the rightful owners of

the land”, and her written reference to a First Nation imposed “moratorium”, are contrary to law

and must not guide the Chief Permitting Officer’s decision.

As of the date of this News Release, the Province of British Columbia has not f iled a response to the

Company’s petition, though the deadline for doing so has passed. Taranis’s counsel is working to schedule

the hearing of the Petition, as soon as a court date becomes available.

Over the past several months, Taranis ha s continued to engage in discussions with EMLI in an effort to

press for the Notice of Work approval , and has provided comment on various draft permit conditions

provided by EMLI for review.

Taranis was also asked by EMLI to post a $54,000 reclamation bond and it did so in November, 2023, even

though the Notice of Work permit has not yet been issued.

On December 5, 2023, EMLI notified Taranis that on November 27, 2023 it received a request from the

U.S. based Lakes Tribe of the Colville Confederated Tribes (the Sinixt) to engage with EMLI on Taranis’

NoW permit application. EMLI indicated it initiated consultation on November 30, 2023, requesting a

response by December 18, 2023, and acknowledged Taranis’s concerns about delays.

On December 15, 2023, EMLI provided Taranis with a letter (dated December 7, 2023) from the

Confederated Tribes of the Colville Reservation and the Sinixt Confederacy , noting the Sinixt wish to

engage EMLI “early in the new year [2024] to discuss engagement and consultation”, and they would not

be able to meet EMLI’s December 18, 2023 deadline.

Taranis has written EMLI seeking clarification as to its position as to whether and on what basis

consultations with the Confederated Tribes / Sinixt are required under Canadian law. Taranis has also asked

EMLI to clarify why, if it feels consultation is required, it did not engage earlier with the Sinixt /

2

Confederated Tribes, and in this regard has noted a January 2023 media rel ease from the Office of the

Premier which includes a quote from the Chairman of the Colville Reservation and the Sinixt Confederacy

regarding their interest in the Incomappleux Conservancy established near the Taranis Thor project. See

New conservancy protects rare ecosystems in Incomappleux Valley | BC Gov News

About Taranis and Thor

Taranis Resources is a Canadian mineral exploration company. Taranis’ Thor Project is located in southeast

British Columbia. Thor is comprised of 3,807 hectares of Mineral Tenures and 27 Crown Grant titles to

precious and base minerals. Thor is a brownfield mine site, having been mined on a small scale since as

early as 189 6. Taranis has demonstrated via extensive diamond drilling that the historical mines are

connected as part of a much larger mineralized system, and the NoW permit application discussed herein is

meant to allow for deep drilling which aims to prove or dispr ove the presence of a large intrusion-related

deposit connected to the known epithermal veins. Such deposits are often world -class sources of copper,

molybdenum and gold.

For additional information on Taranis or its 100% -owned Thor project in Brit ish Columbia, visit

www.taranisresources.com

Taranis currently has 94,587,027 shares issued and outstanding (109,262,027 shares on a fully -diluted

basis).

TARANIS RESOURCES INC.

Per: John J. Gardiner (P. Geo.),

President and CEO

For further information contact:

John J. Gardiner

681 Conifer Lane

Estes Park, Colorado 80517

Phone: (303) 716-5922 Cell:

(720) 209-3049

[email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS

DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE

ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.

This News Release may contain forwa rd looking statements based on assumptions and judgments of management regarding

future events or results that may prove to be inaccurate as a result of factors beyond its control, and actual results may di ffer

materially from expected results.