Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TRAN.V ·

Rogue Announces Initial High Purity Analytical Results from Snow White Diamond Drill Program, Receives Hauling Permit for 2018

Exploration Programs Permits & Approvals

July 3, 2018 TSX-V: RRS

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE SERVICES

Rogue Announces Initial High Purity Analytical Results from Snow White

Diamond Drill Program, Receives Hauling Permit for 2018

 2018 drilling campaign totalled 1910 metres, focussed on the Snow White Main Zone

 Metallurgical analysis underway with ANZAPLAN (Germany)

 Initial analytical results from 7 drillholes confirms high purity silica mineralization through the Main Zone

 Preliminary identification of an additional quartz zone to the South, requiring more review

 Agreement signed with the Township of Sables-Spanish Rivers, for 2018 Hauling Permit

TORONTO, ON – Rogue Resources Inc. (TSX-V: RRS) (“Rogue” or the “Company”) is pleased to announce initial analytical

results from the 2018 drilling campaign on the Snow White quartz project, located near Massey, Ontario, Canada (“Snow

White” or the “Project”). Analytical results from the first 7 holes of the 36 hole diamond drill hole program submitted to

ALS Global are reported and have confirmed the high purity silica mineralization previously identified in surface sampling

and historic diamond drill holes . A total of 1910 metres of diamond drilling were completed (vs. the 1800 metres

originally planned) on the Main Zone of the Snow White Property in May and June of 2018. Drilling was designed to test

the Main Zone on 20 metre sections with a 10 metre hole separation.

The drill results reported in this release are from the Snow White Main Zone and are testing the continuity of the silica

grade, the distr ibution of impurities within the quartz vein and t he overall dimensions of the silica mineralization.

Significant widths of high purity silica were encountered during the drill program that meet or exceed the specifications

required for silicon metal production. The drill hole locations for the reported analytical results are summarized in Table

1 and the analytical results have been summarized in Table 2.

“These initial high purity drill results received for the first 7 holes on the Snow White Project from the 2018 drill program

were highly successful in confirming the presence of high purity silica from the Main Zone ,” states Paul Davis, Vice

President Technical. “ Some drill intercepts reported meet or exceed the specifications required for s ilicon metal

Hole ID UTM

Zone

UTM

Datum

UTM

Easting

UTM

Northing

Elevation

(m)

Azimuth

(deg)

Dip

(deg)

Length

(m)

Core

Size

RR-18-01 17 NAD 83 395822 5134820 324 255 -55 25 NQ

RR-18-04 17 NAD 83 395850 5134826 325 255 -55 63 NQ

RR-18-07 17 NAD 83 395831 5134801 327 255 -55 48 NQ

RR-18-08 17 NAD 83 395821 5134798 327 255 -55 36 NQ

RR-18-09 17 NAD 83 395811 5134796 328 255 -55 21 NQ

RR-18-13 17 NAD 83 395837 5134719 327 255 -55 75 NQ

RR-18-14 17 NAD 83 395827 5134717 328 255 -55 63 NQ

Table 1: Snow White Diamond Drill Hole Locations and Summary Information

44 Victoria Street, Suite 1612

Toronto, ON M5C 1Y2 CANADA

Toll Free: 1-888-764-1981,

Direct: +1-647-243-6581

[email protected]

production without any additional sorting and based upon our examination of the drill core and the distribution of

granitic inclusions and trace m inerals and when combined with the positive optical sorting tests, I am certain that a

majority of silica mineralization will meet or exceed these specifications after sorting, using Direct -Ship. In addition to

the commodity market, the physical characteristics of the quartz , including colour , make it a potentially attractive

product for specialized markets with some further processing and upgrading.”

Rogue’s technical team continues to validate the drill hole data, analytical results and interpretations of the silica

mineralization and is working closely with M.Plan International Limited (“M.Plan”) in this analysis . M.Plan continues

their preparation of an initial mineral resource estimate for the Main Zone at the Snow White Silica Project and a

technical report (the “Resource Report”) that complies with the requirements of National Instrument 43-101 - Standards

of Disclosure for Mineral Projects (“NI 43-101”) will be filed by Rogue in compliance with NI 43 -101. M.Plan is a joint

venture between Dorfner ANZAPLAN GmbH (“ANZAPLAN”) and Micon International Limited formed specifically to

provide consulting services in the specialty minerals sector. The Company expects the Resource Report to be completed

and announced in late July (see press release dated June 18, 2018).

Potential new South Zone

An examination of surface outcrops exposed due to recent forestry activity on the property indicates that the quartz

mineralization may extend further along the trend and the Company plans to map and sample these new zones as well

as the already stripped South Zone during the summer/fall field season. This mineralization is on the Company’s current

claims and would be included in the existing operations permit for the Project.

Hauling Permit with the local township

Rogue is also pleased to announce it has signed an agreement with The Corporation of the Township of Sables -Spanish

Rivers, a Municipal Corporation under the laws of the Province of Ontario, for truck hauling. The Township has adjusted

an existing load restriction in order to facilitate the Snow White hauling process. The agreement outlines the covenants

of the hauling of legally licensed loads from August 1 , 2018 to November 30, 2018. The Company will be required to re -

apply for a hauling permit in successive years.

Hole ID From

(m)

To

(m)

Width

(m)

SiO2

(%)1

Al

(%)2

Ca

(%)2

Fe

(%)2

P

(%)2

Ti

(%)2

RR-18-01 0.80 5.15 4.35 98.76 0.26 0.01 0.092 0.002 0.010

incl. 0.80 4.00 3.20 99.23 0.15 0.01 0.059 0.001 0.007

RR-18-04 1.25 31.50 30.25 98.60 0.23 0.02 0.107 0.006 0.013

incl. 1.25 9.00 7.75 99.09 0.13 0.01 0.056 0.001 0.006

incl. 9.50 12.25 2.75 99.03 0.13 0.01 0.046 0.001 0.006

incl. 13.50 31.50 18.00 99.03 0.11 0.01 0.049 0.001 0.007

RR-18-07 0.65 10.00 9.35 99.22 0.15 0.01 0.054 0.002 0.007

RR-18-07

RR-18-07 12.00 13.40 1.40 98.98 0.07 0.01 0.039 0.001 0.004

RR-18-07

RR-18-07 15.00 17.10 2.10 98.85 0.18 0.01 0.058 0.002 0.005

RR-18-08 1.15 7.15 6.00 99.33 0.09 0.01 0.021 0.001 0.005

RR-18-09 1.10 12.00 10.90 98.96 0.20 0.01 0.066 0.002 0.008

RR-18-13 28.00 46.50 18.50 98.69 0.20 0.02 0.072 0.002 0.005

incl. 33.00 46.50 13.50 99.03 0.09 0.02 0.056 0.001 0.003

RR-18-14 17.70 33.20 15.50 99.04 0.13 0.01 0.044 0.002 0.003

Lost Core

Lost Core

1 - ALS Global Whole Rock by Fusion/XRF

2 - ALS Global Super Trace Lowest DL 4A by ICP-MS

Table 2: Summary of Snow White Drill Hole Intercepts - High Purity Silica Analytical Results

“I’m pleased with these initial results, as they confirm our view on Snow White- that it could be a Direct-Ship project with

minimal capex to sell to the commodity market and good potential into the specialized markets. We drilled more metres

than planned, and the full analytics delayed us a month, but t his was the right work to do - methodically de-risking the

Project and moving towards a Resource and a potential Advancement D ecision. The potential new South Zone is also

exciting for us and we appreciate the continued cooperation of the local township , they remain supportive as we

continue with our work on Snow White”, said Sean Samson, President and CEO of Rogue Resources.

About Rogue Resources Inc.

Rogue is a mining company focused on generating positive cash flow. Not tied to any commodity, it looks at rock value

and good grade deposits that can withstand all stages of the commodity pr ice cycle. The Company remains focused on

advancing its silica/quartz business with the Snow White Project in Ontario and the Silicon Ridge Project in Québec,

exploring its other assets, including the gold potential at Radio Hill, and identifying additiona l projects or mines that

meet its criteria.

For more information visit www.rogueresources.ca.

Qualified Person

The Company’s Projects are under the direct technical supervision of Paul Davis, P.Geo., and Vice -President of the

Company. Paul is a Qualified Person (“QP”) as defined by NI 43 -101. He has reviewed and approved the technica l

information in this press release.

For additional information regarding this news release please contact:

Sean Samson

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Ven ture

Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Statements:

This news release contains certain statements or disclosures relating to the Company that are based on the expectations

of its management as well as assumptions made by and information currently available to the Company which may

constitute forward-looking statements or information (“forward -looking statements”) under applicable securities laws.

Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by

the words “expects”, “plans”, “anticipates” , “believes”, “intends”, “estimates”, “projects”, “continue”, “potential” and

similar expressions, or are events or conditions that “will”, “would”, “may”, “could” or “should” occur or be achieved. In

particular, but without limiting the foregoing, this ne ws release contains forward -looking statements pertaining to the

following: the Private Placement; the Units, FT Units, Warrants and FT Warrants; the expected date of closing of the

Private Placement; the expected use of proceeds from each of the Unit Offe ring and the FT Unit Offering; jurisdictions

where the Unit Offering and FT Unit Offering will be made; Finder’s Fees and Finder’s Warrants; the statutory hold

periods applicable to the securities underlying the Units and FT Units; and the applicability of exemptions from

prospectus and registration requirements of applicable securities laws. The forward -looking statements contained in this

news release reflect several material factors and expectations and assumptions of the Company including, without

limitation: business strategies and the environment in which the Company will operate in the future; commodity prices;

exploration and development costs; mining operations, drilling plans and access to available goods and services and

development parameters; regulatory restrictions; the ability of the Company to obtain applicable permits and regulatory

approvals; activities of governmental authorities (including changes in taxation); currency fluctuations; the global

economic climate; and competition.

The Compa ny believes that the material factors, expectations and assumptions reflected in the forward -looking

statements are reasonable at this time but no assurance can be given that these factors, expectations and assumptions

will prove to be correct. The forward -looking statements included in this news release are not guarantees of future

performance and should not be unduly relied upon. Such forward -looking statements involve known and unknown risks,

uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such

forward-looking statements including, without limitation: general economic, market and business conditions; the Private

Placement may not be completed in the timelines anticipated, in the manner anticipated or at all; the required regulatory

approval for the Private Placement, including the approval of the TSXV, may not be obtained; the Company’s properties

may not have the results currently anticipated by the Company; the Company may be unable t o resolve geological,

mechanical, regulatory or operational issues in the timelines anticipated, in the manner anticipated or at all; increased

costs and expenses; reliance on industry partners; risks related to operations, government and environmental regulation,

conclusions of economic evaluations and changes in project parameters as plans continue to be refined; risks in the

marketability of minerals; fluctuations in the commodity prices; fluctuation in foreign exchange rates and interest rates;

stock market volatility; and certain other risks detailed from time to time in the Company’s public disclosure documents

including, without limitation, those risks identified in this news release, and in the Company’s most recent annual and

interim management’s di scussion and analysis, copies of which are available on the Company’s SEDAR profile at

www.sedar.com. Readers are cautioned that the foregoing list of factors is not exhaustive and are cautioned not to place

undue reliance on these forward-looking statements.

The forward -looking statements contained in this news release are made as of the date hereof and the Company

undertakes no obligations to update publicly or revise any forward -looking statements, whether as a result of new

information, future events or otherwise, unless so required by applicable securities laws.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any securities in the United Stat es

of America. The securities have not been and will not be registe red under the United States Securities Act of 1933 (the

“U.S. Securities Act”) or any state securities laws and may not be offered or sold within the United States or to U.S.

Persons (as defined in the U.S. Securities Act) unless registered under the U.S. Securities Act and applicable state

securities laws, or an exemption from such registration is available.