Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

TRAC.CN ·

Traction Uranium Completes Diamond Drill Program at Key Lake South Project

Exploration Programs

Traction Uranium Completes Diamond Drill Program at Key Lake

South Project

April 11th, 2023

(Calgary, AB): Traction Uranium Corp. (CSE: TRAC) (OTC: TRCTF) (FRA: Z1K) (the

“Company” or “ Traction”) is pleased to announce that it has completed its diamond drill program at

the Company’s Key Lake South Property (the “KLS Property”) in northern Saskatchewan’s Athabasca

Basin, and has completed demobilization of the drill crew, the Aurora Geological team , and the

takedown/demobilization of the temporary work camp.

The first phase diamond drill program comprised 12 diamond drill holes (DDH) for a total of 1,838

metres (see Table 1). Core logging and sampling has been completed by the Aurora Geosciences Team,

and 419 samples have been delivered to the Saskatchewan Res earch Council (SRC) for geochemical

analysis.

The program identified several zones of strong chlorite-epidote alteration, including within DDH KLS23-

005, 008 and 010, and strongly developed alteration assemblages in KLS23 -007 typical of Athabasca -

style basement-hosted uranium mineralization. Anomalous radioactivity was intersected in overburden

in DDH KLS23-002 and 009, in bedrock in 005, , and 008, and in both overburden and bedrock in 007.

Notably, 007 intersected 2 zones of anomalous radioactivity: Zone 1; 6 metres (1.6 m to 7.6m) within

overburden, with values up to 1,254 cps; and Zone 2; 52 metres (31 m to 83 m) within basement rocks,

returning values up to 474 cps. DDH KLS23 -009 also returned a 69 -centimetre interval of anomalous

radioactivity within overburden, extending from 0.023 metres to 0.716 metres, with values ranging from

121 to 236 cps. Sheeted graphitic fractures in metasandstones was intersected towards the base of DDH

KLS23-008 (see Traction news releases dated March 29th, 2023 and April 5th, 2023).

Lester Esteban, Chief Executive Officer of the Company, stated, “I would like to thank the teams from

Full Force Diamond Drilling Ltd., JP Enterprises Inc., Aurora Geosciences Ltd. and UGreenco Energy

Corp. for carrying out a safe and efficient diamond drill program at KLS which returned impressive

results. The shallow, near surface Zone 1 overburden intersect of significant radioactivity (1,254 cps

measured by downhole probe) in DDH KLS23 -007 is a compelling target for follow -up and our team

will be hard at work planning a summer program in order to sample and assay the 007 overburden to

determine its mineralization.”

Carl Schulze, Senior Project manager with Aurora Geosciences Ltd. of Whitehorse, Yukon, states: “The

identification of overburden-hosted zones of elevated radioactivity in DDH 009 and strongly anomalous

radiation in DDH 007 provide a second major target setting for follow -up exploration at the KLS

property. These holes are spaced more than 1.0 km apart, indicating multiple sources of overburden-

hosted radioactivity are likely. This setting, combined with zones of anomalous radiation within bedrock,

enhances the exploration potential at Traction’s KLS South property.”

Table 1: Drill collar data, KLS 2023 Program

Hole ID Easting Northing Azimuth Dip EOH (m)

KLS23-001 456672 6333542 270 60 197

KLS23-002 456640 6333973 Vertical 90 63

KLS23-002A 456640 6333973 270 60 183

KLS23-003 456541 6334206 270 60 180

KLS23-004 456579 6334472 270 70 153

KLS23-005 456429 6334793 90 70 159

KLS23-006 455846 6334912 270 60 150

KLS23-007 455527 6334887 250 70 150

KLS23-008 455421 6334664 270 70 162

KLS23-009 455727 6333852 Vertical 90 150

KLS23-010 456001 6334119 90 70 141

KLS23-011 455629 6333484 200 70 150

Total 1838 m

NOTES:

Cps* = “counts-per-second”, as measured with a downhole probe or handheld Radiation Solutions RS-

125 scintillometer. The reader is cautioned that the Company uses downhole probe readings and handheld

Radiation Solutions RS-125 scintillometer as a preliminary indication of the presence of radioactive

materials (uranium, thorium and/or potassium), and that downhole probe results may not be used directly

to quantify or qualify uranium concentrations of the rock samples measured.

The Company considers all downhole probe readings greater than 100 cps to be considered “elevated

radioactivity”, with background radioactivity measuring between 50 to 100 cps.

All reported drill hole intervals are drill core lengths and do not represent thickness which have yet to be

determined.

About the Property

The KLS Property is located approximately 6 kilometers to the southwest of the Key Lake uranium mill

and in close vicinity to modern uranium mining facilities and highway tran sportation in northern

Saskatchewan. Geologically, it is located along southeastern edge of the Proterozoic Athabasca Basin.

About Traction Uranium Corp.

Traction Uranium Corp. is in the business of mineral exploration and the development of uranium discovery

prospects in Canada, including its three uranium projects in the world-renowned Athabasca Region.

We invite you to find out more about our exploration -stage activities across Canada’s Western region at

www.tractionuranium.com.

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Carl Schulze,

P. Geo., who is a “Qualified Person” as defined by National Instrument 43-101, Standards of Disclosure

for Mineral Projects and is a Professional Geoscientist in good standing with APEGBC, APGO and

NAPEG, and who is a Senior Project Manager at Aurora Geosciences Ltd.. Mr. Schulze verified the data

disclosed in this news release, including the sampling, analytical, and test data underlying such data. Mr.

Schulze was physically present during data collection and examined a significant portion of direct data

obtained via hand-held probes, and was able to verify the data accordingly. No limitations were imposed

upon the data verification process. The quality assurance / quality control program in relation to data

collection and analysis consisted of viewing the data from the “down” and “up” result and employing

quality control measures comprised of careful geotechnical logging of all holes, including layout of 1.0-

metre intervals, photographing the core and obtaining duplicate samples at a rate of 1 per 25 total samples

in the sample stream. It is noted that the information herein provides an indication of the exploration

potential of the KLS Property but may not be representative of actual results.

On Behalf of The Board of Directors

Lester Esteban

Chief Executive Officer

+1 (604) 561 2687

[email protected]

Forward-Looking Statements

This news release includes forward -looking statements that are subject to risks and uncertainties,

including with respect to potential uranium mineralization and potential future project economics. The

Company provides forward-looking statements for the purpose of conveying information about current

expectations and plans relating to the future and readers are cautioned that such statements may not be

appropriate for other purposes. By its nature, this information is subject to inherent risks and

uncertainties that may be general or specific and which give rise to the possibility that expectations,

forecasts, predictions, projections, or conclusions will not prove to be accurate, that assumptions may

not be correct, and that objectives, strate gic goals and priorities will not be achieved. These risks and

uncertainties include risks that potential uranium mineralization or future project economics will be less

than believed, or none at all and those risks identified and reported in the Company’s public filings under

the Company’s SEDAR profile at www.sedar.com. Although the Company has attempted to identify

important factors that could cause actual actions, events, or results to differ materially from those

described in forward-looking information, there may be other factors that cause actions, events or results

not to be as anticipated, estimated or intended. There can be no assurance that such information will

prove to be accurate as actual results and future events could differ materially from those anticipated in

such statements. The Company disclaims any intention or obligation to update or revise any forward-

looking information, whether as a result of new information, future events or otherwise unless required

by law.

The CSE has neither approved nor disapproved the information contained herein.