Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

TRAC.CN ·

Traction Uranium and UGreenco Energy Commences Phase 1 of Field Geological Program at Key Lake South Property in Saskatchewan’s Athabasca Basin

Exploration Programs

Traction Uranium and UGreenco Energy Commences Phase 1 of

Field Geological Program at Key Lake South Property in

Saskatchewan’s Athabasca Basin

September 13th, 2022

(Calgary,

AB):

Traction

Uranium

Corp.

(CSE:

TRAC)

(OTC:

TRCTF)

(FRA:

Z1K)

(the

Company

or

Traction

”)

and

UGreenco

Energy

Corp.

(UGreenco)

are

pleased

to

announce

commencement

of

their

Phase

1

Field

Geological

Program

with

mobilization

of

their

field

geological

team

to

their

Key

Lake

South

Property

in

Canada’s

world

renowned

Athabasca

Basin,

whereby

Traction

can

acquire

up

to

a

75%

interest

in

the

Key

Lake

South

Property

which

is

located

approximately 6 kilometers to the southwest of Cameco’s Key Lake Uranium Mill.

Objective: Defining Drill Targets for an Unconformity-Type Uranium Deposit at Key Lake South

An area of approximately 4.15 square kilometers is targeted for ground exploration with the objective

of investigating surface uranium anomalies from the quantitative gamma-ray spectrometric survey of

Ford et al. (2006) and the Athabasca Sandstone mapped in 1973 (AR 74H04- 0013).

Figure 1.

The area of proposed exploration 2022, covering

surface uranium anomalies (“B” and “C”), the southwest part of

the Athabasca Sandstone mapped in 1973, fan-shaped faults interpreted from airborne geophysics. The background map

shows uranium content from the airborne gamma-ray spectrometric survey of 2005.

Phase 1: Boulder Prospecting, Mapping and Sampling

Boulder

prospecting

will

focus

on

the

two

surface

anomalies

(“B”

and

“C”)

from

the

quantitative

gamma-ray

spectrometric

survey

of

Ford

et

al.

(2006),

searching

for

uranium-bearing

boulders

for

comparison

with

those

from

the

surface

anomaly

“A”,

the

“Hot

Island”

identified

in

the

early

1970’s.

Boulder

mapping

will

apply

to

the

whole

area

of

the

proposed

exploration

in

2022

in

order

to

better

define

the

outline

of

Athabasca

Sandstone

mapped

in

1973

(AR

74H04-0013).

Representative

sandstone boulders will be sampled for boron assay.

Underexplored Since the Discovery of Key Lake Deposit

An extraordinary surface uranium anomaly was outlined in early 1970’s and believed to be transported

from a source in the northeast, which led to discovery of the Key Lake uranium deposit. Advanced

airborne geophysical surveys from both government and industry during the 2000’s depict a coincidence

between this surface uranium anomaly and underlying structures supporting a thesis that this anomaly is

in-situ

controlled by structures rather than erratically

transported by glacier.

A relic of Athabasca Sandstone was outlined by surficial photogeological studies with follow-up

reconnaissance mappings in 1973. After applying a hypothesis that surface anomaly has an offset of

approximately 400 meters to the north from orebody, supported by phenomenon at the Gaertner orebody

(the insert map on Figure 1), adjusted locations of the highest uranium contents (A’, B’, and C’) perfectly

sit around edge of the Athabasca Sandstone mapped from pebbles in till during 1973 (Figure 1), which

may imply unconformity-type uranium mineralization preserved underlying the Athabasca Sandstone.

Figure 2.

Satellite image showing the 2022 exploration

area, campsite, highway, exploration trails and Cameco’s Key Lake

Mill

Lester

Esteban

,

Chief

Executive

Officer,

stated,

“Unlocking

the

potential

of

our

KLS

(Key

Lake

South)

Project

and

getting

boots

on

the

ground

has

been

Priority

#1

since

inking

the

option

agreement

with

UGreenco.

Our

team

of

specialized

and

experienced

geologists

and

researchers

have

been

looking

forward

to

heading

up

and

getting

to

work

on

KLS

to

complete

Phase

1.

Immediately

after,

our

team

will

execute

Phase

2

-

a

Ground

Gravity

Survey

to

really

zero

in

on

high

priority

targets

ahead

of

our

highly anticipated KLS 2023 Drill Program.”

About Traction Uranium Corp.

Traction

Uranium

Corp.

is

in

the

business

of

mineral

exploration

and

the

development

of

discovery

prospects

in

Canada,

including

its

three

flagship

uranium

projects

in

the

world

renowned

Athabasca

Region.

We

invite

you

to

find

out

more

about

our

exploration-stage

activities

across

Canada’s

Western

region

at

www.tractionuranium.com

.

About the Property

The

Key

Lake

South

Uranium

Project

is

located

approximately

6

kilometers

to

the

southwest

of

the

Key

Lake

uranium

mill

and

in

close

vicinity

to

modern

uranium

mining

facilities

and

highway

transportation

in

northern

Saskatchewan.

Geologically,

it

sits

at

the

southeastern

edge

of

the

Proterozoic

Athabasca

Basin

home

of

the

world’s

largest

and

highest

grade

uranium

deposits

and

operations.

Recent

discovery

of

Triple

R

and

Arrow

deposits

has

demonstrated

further

potential

of

high-grade

uranium at the edge of the basin.

Qualified Person

The

technical

content

of

this

news

release

has

been

reviewed

and

approved

by

Linglin

Chu,

M.Sc.,

P.

Geo.,

who

is

a

Qualified

Person

as

defined

by

National

Instrument

43-101,

Standards

of

Disclosure

for

Mineral

Projects.

The

information

provides

an

indication

of

the

exploration

potential

of

the

Property

but

may not be representative of expected results.

On Behalf of The Board of Directors

Lester Esteban

Chief Executive Officer

+1 (604) 561 2687

[email protected]

Forward-Looking Statements

This

news

release

includes

forward-looking

statements

that

are

subject

to

risks

and

uncertainties,

including

with

respect

to

the

Company

completing

phase

1

and

phase

2,

the

Company

acquiring

any

interest

in

the

Property,

timing

of

cash

payments,

share

issuances

and

expenditure

requirements,

and

development

of

the

Property.

The

Company

provides

forward-looking

statements

for

the

purpose

of

conveying

information

about

current

expectations

and

plans

relating

to

the

future

and

readers

are

cautioned

that

such

statements

may

not

be

appropriate

for

other

purposes.

By

its

nature,

this

information

is

subject

to

inherent

risks

and

uncertainties

that

may

be

general

or

specific

and

which

give

rise

to

the

possibility

that

expectations,

forecasts,

predictions,

projections,

or

conclusions

will

not

prove

to

be

accurate,

that

assumptions

may

not

be

correct,

and

that

objectives,

strategic

goals

and

priorities

will

not

be

achieved.

These

risks

and

uncertainties

include

but

are

not

limited

those

identified

and

reported

in

the

Company’s

public

filings

under

the

Company’s

SEDAR

profile

at

www.sedar.com.

Although

the

Company

has

attempted

to

identify

important

factors

that

could

cause

actual

actions,

events,

or

results

to

differ

materially

from

those

described

in

forward-looking

information,

there

may

be

other

factors

that

cause

actions,

events

or

results

not

to

be

as

anticipated,

estimated

or

intended.

There

can

be

no

assurance

that

such

information

will

prove

to

be

accurate

as

actual

results

and

future

events

could

differ

materially

from

those

anticipated

in

such

statements.

The

Company

disclaims

any

intention

or

obligation

to

update

or

revise

any

forward-looking

information,

whether

as

a

result

of

new

information, future events or otherwise unless required by law.

The CSE has neither approved nor disapproved the information contained herein.