Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TORC.V ·

Tinone Commences Drilling to Panama GOLD Project

Exploration Programs

TINONE COMMENCES DRILLING TO PANAMA

GOLD PROJECT

(TSX-V: TORC)

VANCOUVER, BC

,

Feb. 28, 2022

/CNW/ -

TinOne Resources Inc.

(TSXV: TORC) ("

TinOne

" or

the "

Company

") is pleased to announce that it has commenced drilling on its Panama Gold Project

in northeastern

Tasmania, Australia

.

Highlights

A program of 1,860 metres of Reverse Circulation (RC) drilling has commenced at the

Company's Panama Gold Project

Drilling to target previously undrilled prospects defined by surface geology, geophysics,

historical exploration and small-scale historical mining activity

Ranking and Prioritizing Great Pyramid and

Aberfoyle

tin targets

"

We are pleased to have started drilling on our Panama Gold Project which acted as the qualifying

property through our transaction with Lamaska,"

commented

Chris Donaldson

, TinOne's Executive

Chairman.

"

Panama

is a target-rich environment with impressive historical gold intercepts and with

our technical team now in place and drilling commencing, it will be a very exciting year for TinOne.

While we are currently drilling

Panama

, we are evaluating and prioritizing targets on our key Tin

projects. It is expected that at the completion of this current drill campaign the drill will be

mobilized without delay to explore for tin, which of course has seen a tremendous increase in price

as a result of heightened demand due to the electrification movement and supply issues

worldwide."

Figure 1: Location of the Panama project in the mining-friendly jurisdiction of Tasmania (CNW

Group/TinOne Resources Corp.)

Figure 2: Panama project simplified geology, historical mines and prospects. (CNW Group/TinOne

Resources Corp.)

Figure 3: Magnetic image of the northern Panama project area showing the extensive historic mining

activity, and location of historical drill holes (from the Mineral Resources Tasmania (MRT)

database). The Panama Valley prospect contains more extensive workings, and is larger in area

than the previously drilled Potoroo prospect, but remains undrilled. (CNW Group/TinOne Resources

Corp.)

Figure 4: Gradient array IP chargeability image, surface rock sample results and proposed drill hole

locations for the Bessell Reward prospect at the Panama Project. (CNW Group/TinOne Resources

Corp.)

Drilling Details

Panama Valley Prospect

: The primary target in this prospect is a granodiorite intrusion at the

south-western end of Panama Valley. Numerous historic alluvial workings are recorded above the

weathered intrusion and prospector diggings occur in the Mathinna Supergroup rocks in the contact

aureole, but the granodiorite intrusion has never been drilled or subjected to any modern exploration.

The prospectivity of this target is based on its similarities, in terms of magnetic signature and

structural/geomorphic setting, to a smaller granodiorite intrusion, known as the Potoroo prospect,

further downslope in the north-east of Panama Valley. Modern exploration at Potoroo by previous

companies demonstrated a small but coherent body of low grade, near surface gold mineralisation

disseminated through the sericite-clay-sulphide altered granodiorite host rock. The magnetic

anomaly source rocks are enriched in accessory pyrrhotite rather than magnetite and the

mineralisation at Potoroo correlates with the modelled source of the anomaly.

TinOne has planned a program of 7 holes for 420 metres to systematically test the area of historical

workings and coherent magnetic signature.

Bessell Reward Prospect

: The undrilled Bessell Reward prospect contains gold mineralisation in

sandstone-hosted bedding-parallel veinlets and disseminations within the sandstone interbeds. The

target is interpreted to be a zone of structural deformation marked by a significant break in IP

chargeability and aeromagnetic signature. The location of the historic alluvial diggings either side of

the ridge and rock chip results, indicate that the sandstone ridge is a source of gold. Historical and

recent surface rock samples have returned values up to 7.9 g/t Au.

TinOne has planned a program of 17 holes for 1,440 metres to systematically test the area of

historical workings, interpreted structural discontinuities and surface geochemistry.

About the Panama Project

The underling geology at

Panama

is Ordovician-Silurian Mathinna Supergroup sediments that have

been intruded by Devonian granodiorite. Both the intrusions and the sediments are considered to be

prospective for intrusion related gold systems (IRGS), sediment hosted disseminated gold and

mesothermal gold deposits.

The

Panama

project contains multiple underexplored gold targets with TinOne's focus being bulk

mineable, gold in sandstone (Bessell Reward) or granodiorite (Potoroo,

Panama

) within the historic

Lisle-Golconda Goldfield. Alluvial gold was discovered in the Golconda-Lisle area in 1872 and hard-

rock mining followed in 1876. The main Lisle alluvial field was discovered by

Charles Bessell

in 1878,

following the discovery of the Tobacco Creek Goldfield (Bessell Reward area) in 1877 and official

records (Reid, 1926) indicate production of approximately 88,000 oz although other government

sources estimate a total production of approximately 250,000 oz (Twelvetrees, 1909).

Modern exploration commenced in the 1970s and comprised of broad-scale stream sediment, soil,

and rock chip sampling. Historical drill intersections within the project area include:

66m

@ 0.6 g/t

Au,

2m

@ 7.4 g/t Au,

1.5m

@ 9.0 g/t Au,

4m

@ 12.9 g/t Au.

About the TinOne

TinOne is a TSX Venture listed Canadian public company with a high-quality portfolio of tin and gold

projects in the Tier 1 mining jurisdictions of

Tasmania

and

New South Wales, Australia

. The

Company is focussed on advancing its highly prospective portfolio through aggressive exploration

programs.

Qualified Person

The Company's disclosure of technical or scientific information in this press release has been

reviewed and approved by Dr

Stuart Smith

., Technical Adviser for TinOne. Dr. Smith is a Qualified

Person as defined under the terms of National Instrument 43-101. For additional information

regarding the Company's Panama Project, please see the Technical Report entitled "Panama

Project" dated effective

March 29, 2021

, on the Company's profile at

www.sedar.com

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward

Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward

looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward

looking statements or information. These forward

looking statements or information relate to, among other things: the development of the Company's

projects, including drilling programs and mobilization of drill rigs; future mineral exploration,

development and production; and completion of a maiden drilling program.

Forward

looking statements and forward

looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of TinOne, future growth potential

for TinOne and its business, and future exploration plans are based on management's reasonable

assumptions, estimates, expectations, analyses and opinions, which are based on management's

experience and perception of trends, current conditions and expected developments, and other

factors that management believes are relevant and reasonable in the circumstances, but which

may prove to be incorrect. Assumptions have been made regarding, among other things, the price

of gold and other metals; no escalation in the severity of the COVID-19 pandemic; costs of

exploration and development; the estimated costs of development of exploration projects; TinOne's

ability to operate in a safe and effective manner and its ability to obtain financing on reasonable

terms.

These statements reflect TinOne's respective current views with respect to future events and are

necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward

looking

statements or forward-looking information and TinOne has made assumptions and estimates

based on or related to many of these factors. Such factors include, without limitation: the

Company's dependence on early stage mineral projects; metal price volatility; risks associated with

the conduct of the Company's mining activities in

Australia

; regulatory, consent or permitting

delays; risks relating to reliance on the Company's management team and outside contractors;

risks regarding mineral resources and reserves; the Company's inability to obtain insurance to

cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding

the failure to generate sufficient cash flow from operations; risks relating to project financing and

equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of

reserves and resources, metallurgical recoveries and capital and operating costs of such projects;

contests over title to properties, particularly title to undeveloped properties; laws and regulations

governing the environment, health and safety; the ability of the communities in which the Company

operates to manage and cope with the implications of COVID-19; the economic and financial

implications of COVID-19 to the Company; operating or technical difficulties in connection with

mining or development activities; employee relations, labour unrest or unavailability; the

Company's interactions with surrounding communities and artisanal miners; the Company's ability

to successfully integrate acquired assets; the speculative nature of exploration and development,

including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts

of interest among certain directors and officers; lack of liquidity for shareholders of the Company;

litigation risk; and the factors identified under the caption "Risk Factors" in TinOne's management

discussion and analysis. Readers are cautioned against attributing undue certainty to forward

looking statements or forward-looking information. Although TinOne has attempted to identify

important factors that could cause actual results to differ materially, there may be other factors that

cause results not to be anticipated, estimated or intended. TinOne does not intend, and does not

assume any obligation, to update these forward

looking statements or forward-looking information

to reflect changes in assumptions or changes in circumstances or any other events affecting such

statements or information, other than as required by applicable law.

SOURCE

TinOne Resources Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/February2022/28/c3742.html

%SEDAR: 00048559E

For further information:

and to sign-up to the mailing list, please contact: Chris Donaldson,

Executive Chairman, Tel: +1.604.813.3931, Email: [email protected]

CO: TinOne Resources Corp.

CNW 07:30e 28-FEB-22