Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TORC.V ·

Tinone Announces Drill Programs at the Aberfoyle and Great Pyramid Projects IN Tasmania, Australia

Exploration Programs

TINONE ANNOUNCES DRILL PROGRAMS AT

THE ABERFOYLE AND GREAT PYRAMID

PROJECTS IN TASMANIA, AUSTRALIA

TSX.V: TORC OTCQB: TORCF

VANCOUVER, BC

,

May 29, 2024

/CNW/ -

TinOne Resources Inc.

(TSXV: TORC) (OTCQB:

TORCF) (

Frankfurt

: 57Z0) ("

TinOne

" or the "

Company

") is pleased to announce plans for upcoming

drill programs at its 100%-owned

Aberfoyle

and Great Pyramid projects, located in the tier-one

mining jurisdiction of

Tasmania, Australia

.

Highlights

Inaugural drill program at the Guinea Pig prospect

: A series of systematic short reverse

circulation ("

RC

") holes designed to test the near-surface lithium-tin mineralization potential of

the broad zones of greisen alteration.

Follow-up RC drilling program planned for Great Pyramid:

A series of short RC holes

designed to test for structurally-controlled high-grade tin mineralization as well as to verify

historical drill data.

"We are very excited to commence drilling at our highly prospective

Aberfoyle

and Great Pyramid

projects,"

commented

Chris Donaldson

, TinOne's Executive Chairman.

"

At

Aberfoyle

, our work to

date has identified numerous occurrences of strong lithium-tin mineralization hosted in highly

altered granite. This style of lithium mineralization has yet to be explored at depth and this

program represents the first drill test for greisen-related lithium mineralization in northeast

Tasmania

. At Great Pyramid, our drilling is aimed at defining the scale potential of near-surface,

high-grade tin mineralization as well as to verify historical data to inform a mineral resource

estimation upgrade."

Drill Program

An RC drill program across two projects (

Aberfoyle

and Great Pyramid) in

Northeast Tasmania

(Figure 1) has been designed to systematically test for near-surface tin ± lithium mineralization.

Details are as follows:

Aberfoyle

The Company plans to drill approximately 500 metres in six RC drill holes to test the lithium-tin

mineralization potential of widespread greisens at the Guinea Pig prospect, Aberfoyle Project

(Figures 2 and 3). Holes will be collared across a 200 metre trend targeting out-cropping zones of

strong lithium-tin mineralization (Figure 3).

Surface sampling to date has defined an area of approximately 12 hectares where numerous rock

samples returned results of >0.20% Li

2

O (Figure 3). Preliminary interpretations indicate that the

higher-grade mineralization occurs in NNW-trending parallel zones of up to 250 metres in strike

length, although the true strike-extent is not presently known. The planned drill program is designed

to investigate the near-surface orientation and scale of the mineralized zones at the Guinea Pig

prospect.

The Guinea Pig prospect is an old working, which along with the Triabunna workings was previously

reported as the Dead Pig prospect.

Great Pyramid

A 350 metre RC drill program (Figure 4) is planned at the Great Pyramid tin project with two primary

objectives:

1

.

Five holes are designed to replace and verify early percussion drilling (Figure 4). These new

data will increase the data confidence from historical drill programs, as recommended by the

mineral resource estimate consultants, Mining Associates (see

October 30

th

, 2023 news

release). The Company believes that an increase in confidence will underpin a re-estimation of a

significant part of the current Inferred Resource to a higher status. No significant track access

or pad preparation work is required as the holes will be drilled on pre-existing sites.

2

.

Five holes are designed to test for the presence of high-grade, fault-related tin mineralization

(Figure 4) associated with the project-scale Pyramid Hill Fault, which transects the project

through at least 400 metres of favourable sandstone. The fault dips steeply to the southwest.

Very few historical holes have drilled through the Pyramid Hill Fault as it trends orthogonal (at

right angles) to the strike of the mineralised joints and veinlets. Most previous drilling at Great

Pyramid was therefore parallel to the fault rather than across it. The Company interprets that

the very high tin grades in 22GPRC012 (

78m

@ 0.51% Sn incl.

23m

@ 1.09% Sn, see

September 22, 2022

news release) are hosted in the Pyramid Hill Fault, which was intersected

at a relatively shallow angle. No past explorers have targeted high-grade tin mineralization at

Great Pyramid.

Timing

The multi-project drill program is set to commence in mid-June with the drill to mobilize first to

Aberfoyle. The Company anticipates the program to be completed within a month and results to be

reported once assays have been returned from the lab and have been compiled and interpreted.

Figure 1:

Location of the Company’s projects in the mining friendly jurisdiction of Tasmania (CNW

Group/TinOne Resources Corp.)

Figure 2:

Location plan showing lithium prospect and anomalies on tenement EL27/2004 (CNW

Group/TinOne Resources Corp.)

Figure 3:

Location of proposed drilling in the Dead Pig – Guinea Pig area, also showing old

prospecting workings identified by field mapping and from LiDAR. The zone of surface lithium

mineralization is defined by rock samples with >0.20% Li2O. (CNW Group/TinOne Resources Corp.)

Figure 4:

Location of proposed drilling at Great Pyramid. (CNW Group/TinOne Resources Corp.)

About the Aberfoyle Project

The

Aberfoyle

project area straddles the boundary between the Silurian to Devonian Mathinna

Supergroup sedimentary rocks and the Devonian Ben Lomond Granite. The historic

Aberfoyle

(tin)

and Storeys Creek (tin-tungsten) mines as well as other vein systems are hosted in the sedimentary

rocks and occur as strike extensive systems of sheeted and stockwork veining. Elevated lithium has

not previously been reported from the project area.

Historic records and drilling indicate the mineralized vein system at

Aberfoyle

is up to 60 metres

wide, 800 metres in length and extends approximately 400 metres in the down dip direction. The

Lutwyche prospect occurs approximately 1 kilometre northeast of

Aberfoyle

and is comprised of two

sets of mineralized veins which can be traced along strike for approximately 750 metres.

An additional sediment-hosted vein system, the Kookaburra, is located 200 metres southwest of the

main Lutwyche vein system and is known to be approximately 40 metres wide with an along strike

extent of at least several hundred metres.

Mineralization at Storeys Creek is hosted within a 30 to 50 metre wide, north-northwest striking

sheeted vein array which dips to the southwest. The system can be traced along strike for 300

metres and extends 400 metres in the down dip direction. The Ben Lomond Granite crops out

approximately 1km west of the mine and has been identified at depth at 180 metres below the

surface.

Additional poorly known sediment-hosted vein systems occur at Brocks, Eastern Hill and elsewhere

in the tenement.

Granite-hosted occurrences are developed throughout the exposed areas of granitoid outcrop and

consist of vein, disseminated and breccia style occurrences with associated greisen style alteration.

These have given rise to historic small scale hard rock and more extensive alluvial production in the

Gipps Creek,

Rex Hill

,

Ben Lomond

,

Royal George

and other areas.

The Company interprets that both sediment- and granite-hosted systems have developed in

structural corridors of multi-kilometre extent and that historic exploration has not systematically

explored these corridors. TinOne believes systematic exploration of these prospective corridors will

result in the definition of high-quality drill targets.

About the Great Pyramid Project

The Great Pyramid deposit is located around a topographical feature known as Pyramid Hill and is

hosted by Silurian to Devonian Mathinna Supergroup sandstones. The mineralization is formed by

closely spaced sheeted northeast trending, cassiterite (SnO

) bearing veins associated with

silicification and sericite-pyrite alteration. The deposit style and regional comparisons suggest that a

tin-fertile granite exists at depth below the deposit, however this has not been encountered in drilling

and the deposit is open at depth. Geological interpretation indicates that certain sedimentary units

within the folded Mathinna Supergroup sediments are more favourable hosts and diamond drilling

being undertaken by the Company during the current campaign, combined with numerical modelling,

will assist in developing a deeper understanding of controls on grade for follow-up drilling.

In 2023, a mineral resource estimate (MRE) was prepared in accordance with Canadian Institute of

Mining, Metallurgy and Petroleum Definition Standards For Mineral Resources and Mineral Reserves

adopted

May 19, 2014

, and in accordance with National Instrument 43-101 Standards of Disclosure

for Mineral Projects.

Table 1. Great Pyramid tin deposit inferred Mineral Resource

1,2,3,4,5

Cut Off (Sn %)

Tonnes (Mt)

Grade (Sn %)

Metal (Sn kt)

Classification

> 0.10

8.39

0.17

14.40

Inferred

1.

Near surface mineral resources are reported at a Sn cut-off grade of 0.10% inside a domain based on geology and grade and considering a ) Sn price of US$24,978t and

80% recovery for tin.

2.

Mineral resources are reported within a conceptual pit shell.

3.

Mineral resources are not mineral reserves and do not have demonstrated economic viability

.

4.

All numbers have been rounded to reflect the relative accuracy of the estimate.

5.

Discrepancies may occur due to rounding of values.

About TinOne

TinOne is a TSX Venture Exchange listed Canadian public company with a high-quality portfolio of

tin, tin/tungsten and lithium projects in the Tier 1 mining jurisdictions of

Tasmania

and

New South

Wales, Australia

. The Company controls some of the most important tin districts in

Tasmania

,

including

Aberfoyle

, Rattler Range and Great Pyramid and is focussed on advancing its highly

prospective portfolio. TinOne is supported by Inventa Capital Corp.

Qualified Person

The Company's disclosure of technical or scientific information in this press release has been

reviewed and approved by

Russell Fulton

, VP Exploration for TinOne. Mr. Fulton is a Qualified

Person as defined under the terms of National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward

Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward

looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward

looking statements or information. These forward

looking statements or information relate to, among other things: the development of the Company's

projects; future mineral exploration, development and production; and the release of exploration

results.

Forward

looking statements and forward

looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of TinOne, future growth potential

for TinOne and its business, and future exploration plans are based on management's reasonable

assumptions, estimates, expectations, analyses and opinions, which are based on management's

experience and perception of trends, current conditions and expected developments, and other

factors that management believes are relevant and reasonable in the circumstances, but which

may prove to be incorrect. Assumptions have been made regarding, among other things, the price

of gold and other metals; no escalation in the severity of the COVID-19 pandemic; costs of

exploration and development; the estimated costs of development of exploration projects; TinOne's

ability to operate in a safe and effective manner and its ability to obtain financing on reasonable

terms.

These statements reflect TinOne's respective current views with respect to future events and are

necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward

looking

statements or forward-looking information and TinOne has made assumptions and estimates

based on or related to many of these factors. Such factors include, without limitation: the

Company's dependence on early stage mineral projects; metal price volatility; risks associated with

the conduct of the Company's mining activities in

Australia

; regulatory, consent or permitting

delays; risks relating to reliance on the Company's management team and outside contractors;

risks regarding mineral resources and reserves; the Company's inability to obtain insurance to

cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding

the failure to generate sufficient cash flow from operations; risks relating to project financing and

equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of

reserves and resources, metallurgical recoveries and capital and operating costs of such projects;

contests over title to properties, particularly title to undeveloped properties; laws and regulations

governing the environment, health and safety; the ability of the communities in which the Company

operates to manage and cope with the implications of COVID-19; the economic and financial

implications of COVID-19 to the Company; operating or technical difficulties in connection with

mining or development activities; employee relations, labour unrest or unavailability; the

Company's interactions with surrounding communities and artisanal miners; the Company's ability

to successfully integrate acquired assets; the speculative nature of exploration and development,

including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts

of interest among certain directors and officers; lack of liquidity for shareholders of the Company;

litigation risk; and the factors identified under the caption "Risk Factors" in TinOne's management

discussion and analysis. Readers are cautioned against attributing undue certainty to forward

looking statements or forward-looking information. Although TinOne has attempted to identify

important factors that could cause actual results to differ materially, there may be other factors that

cause results not to be anticipated, estimated or intended. TinOne does not intend, and does not

assume any obligation, to update these forward

looking statements or forward-looking information

to reflect changes in assumptions or changes in circumstances or any other events affecting such

statements or information, other than as required by applicable law.

SOURCE

TinOne Resources Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/May2024/29/c6114.html

%SEDAR: 00048559E

For further information:

And to sign-up to the mailing list, please contact: Chris Donaldson,

Executive Chairman, Tel: (604) 813-3931, Email: [email protected]

CO: TinOne Resources Corp.

CNW 08:00e 29-MAY-24