Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TNR.V ·

TNR Gold NSR Royalty Update – McEwen’s Los Azules Copper Definitive Feasibility Study Expected in July 2025

Economic Studies

NEWS RELEASE

TNR Gold NSR Royalty Update – McEwen’s Los Azules Copper

Definitive Feasibility Study Expected in July 2025

Vancouver, British Columbia – May 12, 2025: TNR Gold Corp. (TSX-V: TNR) (“TNR”, “TNR Gold” or

the “Company”) is pleased to announce that in its quarterly earnings announcemen t, McEwen Mining

Inc. (“McEwen Mining”) provided an update on the Los Azules copper, gold and silver project in San

Juan, Argentina. TNR holds a 0.4% net smelter returns royalty (“ NSR Royalty”) (of which 0.04% of the

0.4% NSR Royalty is held on behalf of a shareholder) on the Los Azules Copper Project. The Los Azules

project is held by McEwen Copper Inc. (“McEwen Copper”), a subsidiary of McEwen Mining.

An excerpt from a news release issued by McEwen Mining on May 8, 2025, is below. For additional

details, please refer to the McEwen Mining website.

“McEwen Copper (46.4% owned)

McEwen Copper invested $21.3 million (100% basis) in Q1 to advance its feasibility study on Los

Azules. Including amounts spent by Minera Andes Inc. prior to 2012, and McEwen Mining prior to 2021,

we have invested over $400 million to develop Los Azules as a world-class copper development project.

Los Azules

Located in the province of San Juan, Argentina, the Los Azules project is one of the world’s largest

undeveloped copper deposits.

Following the successful conclusion of the 2023 -2024 drilling program, the Los Azules team finalized

the resource model supporting our planned feasibility study. During 2025, Los Azules spent $21.3

million to support remaining activities required for our feasibility study.

Drilling Program

The 2024 -2025 campaign commenced on November 5, 2024, and by March 31, 2025, we have

completed 36,000 feet (11,000 meters) of drilling, covering geotechnical, exploration, hydrological, and

condemnation work. As of March 31, 2025, the Los Azules drilling d atabase totals approximately

685,600 feet (209,000 meters).

The objectives of the 2024 -2025 campaign include conducting hydrogeological testing to assess and

model the site's water resources, carrying out condemnation drilling to evaluate areas designated for

future permanent mine infrastructure, and completing geotechnical and geophysical studies.

Additionally, drilling has progressed at targets of interest near our deposit, such as the Tango Area,

located east of the future Los Azules open pit. Regional exploration efforts are also ongoing, supported

#1120, 789 West Pender Street,

Vancouver, B.C.

V6C 1H2, Canada

T: +1 (604) 229-8129

E-mail: [email protected]

Website: http://www.tnrgoldcorp.com

2

by recent helicopter -assisted magnetotelluric surveys, to identify other areas with mineralization

potential across our 100% owned mining property.

Feasibility Study and Construction

With the Environmental Impact Assessment (EIA) approval in place since December 2024, Los Azules

is advancing towards the release of a definitive feasibility study, expected in July 2025.

Regime of Incentives for Investment (RIGI)

The Regime of Incentives for Investment aims to attract domestic and foreign investment to a number

of sectors in Argentina, including mining, enhancing resource exploration and production while creating

job opportunities and increasing energy security. On February 11, 2025, McEwen Copper submitted an

application for admission to the Los Azules copper project into the RIGI. If approved, the Los Azules

project would become eligible for a range of fiscal and regulatory benefits, including a reduction in the

corporate income tax rate from 35% to 25%, acceleration of sales tax recovery, reduced tax of dividends

from 7% to 3.5%, elimination of export duties currently 4.5%, and relief from the requirement to repatriate

export proceeds. Additionally, the project wo uld benefit from a 30 -year stability guarantee and access

to international arbitration for dispute resolution.”

The McEwen Mining press release appears to be reviewed and verified by a Qualified Person (as that

term is defined by National Instrument 43 -101 – Standards of Disclosure for Mineral Projects ) and the

procedures, methodology and key assumptions disclosed therein are those adopted and consistently

applied in the mining industry, but no Qualified Person engaged by TNR has done sufficient work to

analyze, interpret, classify or verify McEwen Mini ng’s information to determine the current mineral

resource or other information referred to in its press releases. Accordingly, the reader is cautioned in

placing any reliance on the disclosures therein.

Stated Kirill Klip, TNR Gold’s Chief Executive Officer, “We are pleased that McEwen Copper has reached

this major milestone after it secured the environmental permit for the construction and operation of the

Los Azules copper project. Our Company have repaid our investment loan in full, and we believe that the

recent market prices of our shares do not properly reflect the underlying value of the shares. Our

transformation from a project generation junior mining company into a cashflow -generating royalty

company may bring the necessary catalyst for improved market valuation of our assets. The potential

admission to Regime of Incentives for Investment (RIGI) could move the Los Azules copper project

development closer to a construction decision.

“Significant developments on the advancement of the Los Azules project towards the feasibility stage

have led to increased Rio Tinto and Stellantis holdings in McEwen Copper, strategic partners of this large

copper, gold and silver project. In 2023, Stellantis invested an aggregate ARS $72 billion. An additional

US $100 million in total was invested by Rio Tinto’s Venture Nuton in McEwen Copper. TNR Gold’s vision

is aligned with the leaders of innovation among automakers like Stellantis, whose aim is to decarbonize

mobility, and mining industry leaders such as Rob McEwen, whose vision is ‘to build a mine for the future,

based on regenerative principles that can achieve net zero carbon emissions by 2038’.

“Together with Nuton, McEwen Copper is exploring new technologies that save energy, water, time and

capital, advancing Los Azules towards the goal of leading environmental performance. The involvement

of Rio Tinto, with its innovative technology, may also accelerate realizing the potential of the Los Azules

project.

3

“The green energy rEVolution relies on the supply of critical metals like copper; delivering ‘green copper’

to Argentina and the world will contribute to the clean energy transition and electrification of transportation

and energy industries.

“The new president of Argentina has introduced important government policies aimed at supporting

business and unlocking the country’s economic potential. Mining in Argentina is being recognized by the

government as an integral part of its economic development plan, providing jobs and enriching local

communities.

“The strong team performance of McEwen Copper is advancing the Los Azules Project towards a

feasibility study. The Los Azules Project preliminary economic assessment ( PEA) results highlight the

potential to create a robust leach project while reducing the environmental footprint, and greater

environmental and social stewardship sets the project apart from other potential mine developments.

“It’s also encouraging to see an updated independent mineral resource estimate that has increased the

resource significantly. Infill drilling during the 2023 -24 season upgraded the resource categories,

validated the geological model and confirmed the high-grade zone. Resource drilling for the Los Azules

feasibility study is now complete, and the study appears to be on track for delivery in 2025.

“Los Azules was ranked in the top ten largest undeveloped copper deposits in the world by Mining

Intelligence (2022). TNR Gold does not have to contribute any capital for the development of the Los

Azules Project. The essence of our business model is to ha ve industry leaders like McEwen Mining as

operators on the projects that will potentially generate royalty cashflows to contribute significant value for

our shareholders.”

ABOUT TNR GOLD CORP.

TNR Gold Corp. is working to become the green energy metals royalty and gold company.

Our business model provides a unique entry point in the creation of supply chains for critical materials

like energy metals that are powering the energy rEVolution, and the gold industry that is providing a

hedge for this stage of the economic cycle.

Our portfolio provides a unique combination of assets with exposure to multiple aspects of the mining

cycle: the power of blue-sky discovery and important partnerships with industry leaders as operators on

the projects that have the potential to generate royalty cashflows that will contribute significant value for

our shareholders.

Over the past twenty-nine years, TNR, through its lead generator business model, has been successful

in generating high -quality global exploration projects. With the Company’s expertise, resources and

industry network, the potential of the Mariana Lithium Project and Los Azules Copper Project in Argentina

among many others have been recognized.

TNR holds a 1.5% NSR Royalty on the Mariana Lithium Project in Argentina, of which 0.15% NSR royalty

is held on behalf of a shareholder. Ganfeng Lithium’s subsidiary, Litio Minera Argentina (“LMA”), has the

right to repurchase 1.0% of the NSR royalty on the Mariana Project, of which 0.9% is the Company’s

NSR Royalty interest. The Company would receive CAN$900,000 and its shareholder would receive

CAN$100,000 on the repurchase by LMA, resulting in TNR holding a 0.45% NSR royalty and its

shareholder holding a 0.05% NSR royalty.

4

The Mariana Lithium Project is 100% owned by Ganfeng Lithium. The Mariana Lithium Project has been

approved by the Argentina provincial government of Salta for an environmental impact report . Ganfeng

officially inaugurated Mariana Lithium’s start of production at a 20,000 tons -per-annum lithium chloride

plant on February 12, 2025.

TNR Gold also holds a 0.4% NSR Royalty on the Los Azules Copper Project, of which 0.04% of the 0.4%

NSR royalty is held on behalf of a shareholder . The Los Azules Copper Project is being developed by

McEwen Mining.

TNR also holds a 7% net profits royalty holding on the Batidero I and II properties of the Josemaria Project

that is being developed by the joint-venture between Lundin Mining and BHP.

TNR provides significant exposure to gold through its 90% holding in the Shotgun Gold porphyry project

in Alaska. The project is located in Southwestern Alaska near the Donlin Gold project, which is being

developed by Barrick Gold and Novagold Resources. T he Company’s strategy with the Shotgun Gold

Project is to attract a joint venture partnership with a major gold mining company. The Company is

actively introducing the project to interested parties.

At its core, TNR provides a wide scope of exposure to gold, copper, silver and lithium through its holdings

in Alaska (the Shotgun Gold porphyry project) and royalty holdings in Argentina (the Mariana Lithium

project, the Los Azules Copper Project and the Batidero I & II properties of the Josemaria Project), and

is committed to the continued generation of in -demand projects, while diversifying its markets and

building shareholder value.

On behalf of the Board of Directors,

Kirill Klip

Executive Chairman

www.tnrgoldcorp.com

For further information concerning this news release please contact Kirill Klip +1 604-229-8129

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

Except for statements of historical fact, this news release contains certain “forward -looking information”

within the meaning of applicable securities law. Forward -looking information is frequently characterized

by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “will”, “could” and

other similar words, or statements that certain events or conditions “may” or “could” occur, although not

all forward-looking statements contain these identifying words. Specifically, for ward-looking statements

in this news release include, but are not limited to, statements made in relation to: TNR’s corporate

objectives, and future potential transactions being considered by the Special Committee and the Board.

Such forward-looking information is based on a number of assumptions and subject to a variety of risks

and uncertainties, including but not limited to those discussed in the sections entitled “Risks” and

“Forward-Looking Statements” in the Company’s inte rim and annual Management’s D iscussion and

5

Analysis which are available under the Company’s SEDAR+ profile on www.sedarplus.ca. While

management believes that the assumptions made and reflected in this news release are reasonable,

should one or more of the risks, uncertainties or other factors materialize, or should underlying

assumptions prove incorrect, actual results may vary materially from those described in forward-looking

information. In particular, there can be no assurance that: TNR will enter into one or more strategic

transactions, partnership or a spin-out, or be able to complete any further royalty acquisitions or sales of

royalty interests, or portions thereof; debt or equity financings will be available to TNR; or that TNR will

be able to achieve any of its corporate objectives. TNR relies on the confirmation of its ownership for

mining claims from the appropriate government agencies when paying rental payments for such mining

claims requested by these agencies. There could be a risk in the future of the changing internal policies

of such government agencies or risk related to the third parties , in future, challenging the ownership of

such mining claims. Given these uncertainties, readers are cautioned that forward -looking statements

included herein are not guarantees of future performance, and such forward-looking statements should

not be unduly relied on.

In formulating the forward-looking statements contained herein, management has assumed that business

and economic conditions affecting TNR and its royalty partners, McEwen Mining Inc. , Ganfeng Lithium

and Lundin Mining will continue substantially in the ordinary course, including without limitation with

respect to general industry conditions, general levels of economic activity and regulations. These

assumptions, although considered reasonable by management at the time of preparation, may prove to

be incorrect.

Forward-looking information herein and all subsequent written and oral forward -looking information are

based on estimates and opinions of management on the dates they are made and are expressly qualified

in their entirety by this cautionary statement. Exce pt as required by law, the Company assumes no

obligation to update forward -looking information should circumstances or management’s estimates or

opinions change.