TNR Gold NSR Royalty Update on McEwen Los Azules Copper, Gold & Silver Project – Initial Exploration and Solid Delineation Results
NEWS RELEASE
TNR Gold NSR Royalty Update on McEwen Los Azules Copper,
Gold & Silver Project – Initial Exploration and Solid Delineation
Results
Vancouver, British Columbia – March 9, 2023: TNR Gold Corp. (TSX-V: TNR) (“TNR”, “TNR Gold”
or the “ Company”) is pleased to announce that McEwen Mining Inc. (“ McEwen Mining”) provided an
exploration update on the Los Azules copper, gold and silver project in San Juan, Argentina. TNR holds
a 0.4% net smelter returns royalty (“NSR Royalty”) (of which 0.04% of the 0.4% NSR Royalty is held on
behalf of a shareholder) on the Los Azules Copper Project. The Los Azules Copper Project is held by
McEwen Copper Inc., a subsidiary of McEwen Mining.
The news release issued by McEwen Mining on March 6, 2023, stated:
“McEwen Copper Inc., 52%-owned by McEwen Mining Inc. (NYSE: MUX) (TSX: MUX), today reports new
copper values over extensive widths resulting from infill and step-out exploration drilling at its Los Azules
Project. Los Azules is a large porphyry copper -gold-silver deposit with considerable growth potential,
where its ultimate depth and lateral extent remain to be determined.
The Los Azules project, located in the San Juan province, Argentina, has many attributes comparable to
world-class copper-gold deposits in South America. Table 1 provides a summary of the assay results for
the two drill holes for copper (Cu), gold (Au) and silver (Ag).
Highlights
• Exploration: 1,052 meters (m) of 0.29% Cu including 480.0 m grading 0.42% Cu(AZ22174),
which is coincident with a prominent deep geophysical anomaly and showcases the potential to
meaningfully expand Los Azules through exploration.
• Delineation: 236 m of 1.39% Cu and 0.19 g/t Au, including 42 m of 2.78%
Cu (AZ22191) demonstrates strong internal continuity of the high grade mineralization from the
current infill program and further de-risks our geological model.
‘Strong team performance is accelerating our Los Azules program in 2023,’ commented Michael Meding,
Vice President and General Manager of McEwen Copper. ‘Exciting results in hole AZ22174 highlight the
potential of exploration to create additional value for McEwen Copper, and continuity of mineralization in
the infill program is de-risking our mineral resource.’
#1120, 789 West Pender Street,
Vancouver, B.C.
V6C 1H2 , Canada
T: +1 (604) 229-8129
E-mail: [email protected]
Website: http://www.tnrgoldcorp.com
2
Drilling
Over 13,500 m of drilling were completed between January and May in 2022. Activity at Los Azules
restarted in October, focused on completing a drill program covering over 25,000 m in 75 new holes,
designed to:
• Increase infill drilling to upgrade the Cu, Au and Ag resource classification to measured and
indicated, leading to improved geological and economic estimates in a planned 2024 Feasibility
Study (FS).
• Provide metallurgical, hydrological and geotechnical data to facilitate mine design.
• Demonstrate extensions of Los Azules to the North, South and at depth.
From October to the 3 rd week of February, a further 16,900 m in 66 holes have been completed for the
current program, making this the most extensive annual drill campaign in the history of the project. A more
comprehensive update of results from the current campaign will be released soon.
Table 1 –Los Azules Drilling Results for AZ22174 and AZ23191
Hole-ID Section Predominant
Mineral Zone
From
(m)
To
(m)
Length
(m)
Cu
%
Au
(g/t)
Ag
(g/t)
Comment
AZ22174 63 Total 76.0 1128.0 1052.0 0.29 0.06 1.00 Incl. 480.0m of 0.42%
Cu Enriched 76.0 224.0 148.0 0.15 0.01 0.65
Primary 224.0 1128.0 904.0 0.31 0.06 1.05 Incl. 26.0m of 1.46% Cu
AZ23191 37 Enriched 70.0 306.0 236.0 1.39 0.19 2.58 Incl. 42.0m of 2.78% Cu
306.0 336.9 30.9 - - - Assays Pending
Link to location, lengths and geochemical results at Los Azules:
https://www.mcewenmining.com/files/doc_news/archive/2023/2023_03_LA/2023_03_LA_Assays_Comp
osites_Collar_Locations.xls
Exploration Drilling
Figure 1 - AZ22174 Assay Results versus 2017 PEA 3D Pit Shell
2
Our initial exploration hole of the program, AZ22174, was drilled to a depth of 1,128 m with copper
mineralization observed along its entire length including a 1,052 m intercept averaging 0.29% Cu.
Mineralization along the drillhole is more prevalent below 500 m, where more than 66% of the overall
contained copper ( 480 m grading 0.42% Cu) resides. The hole was planned based on the center of a
geophysical anomaly sitting at about 800 m depth, near the termination of a historic hole. The results from
hole AZ22174 reinforce our belief that the deposit continues to be open at depth and to the North and
represents a sizeable opportunity. The sub -interval of 26 m grading 1.46% Cu includes early mineral
porphyry and quartz veinlets that also typify the core of Los Azules.
Delineation Drilling
Figure 2 - Section 37 - AZ23191 shown with mineral zones and 30-year PEA pit (looking north)
Delineation drilling continues at Los Azules with a focus on upgrading to Measured mineral resources the
Enriched zone as shown on Section 37 in Figure 2. Hole AZ23191 lies 50 m north of Section 36 ( See
Figure 2 in the January 26th, 2023 press release) and graded 1.39% Cu over 236m including 2.78%
Cu over 42 m. There remain assays pending along the final 31 metres of the hole. The interpretation of
the enriched mineralization was drafted prior to the results from AZ23191 being available, but overall, the
shape still conforms well. What is most striking is the grade of the intercept versus nearby
hole AZ22180 as shown by the histogram lengths and colours. This reflects the structurally controlled
nature of mineralization, particularly in the core of the deposit where grades are highest.
Technical Information
The technical content of this press release has been reviewed and approved by Stephen McGibbon, P.
Geo., McEwen Mining's Senior Consulting Geologist, and a qualified person as defined by NI 43 -101.
All samples were collected in accordance with generally accepted industry standards. Drill core samples
usually taken at 2 m intervals were split and submitted to the Alex Stewart International laboratory located
in the Province of Mendoza, Argentina, for the following assays: gold determination using fire fusion assay
and an atomic absorption spectroscopy finish (Au4-30); a 39 multi-element suite using ICP-OES analysis
(ICP-AR 39); copper content determination using a sequential copper analysis (Cu -Sequential). An
additional 19 element analysis (ICP-ORE) was performed for samples with high sulfide content.
2
The company conducts a Quality Assurance/Quality Control program in accordance with NI 43 -101 and
industry best practices using a combination of standards and blanks on approximately one out of every
25 samples. Results are monitored as final certificates are received and any re -assay requests are sent
back immediately. Pulp and preparation sample analyses are also performed as part of the QAQC
process. Approximately 5% of the sample pulps are sent to a secondary laboratory for control purposes.
In addition, the laboratory performs its own internal QAQC checks, with results made available on
certificates for Company review.
Table 2 - Hole Locations and Lengths for AZ22174 and AZ23191
HOLE-ID Azimuth Dip Length Loc X Loc Y Loc Z
AZ22174 0 -90 1128 2382932 6560459 3644
AZ23191 250 -79 336.8 2383341 6559233 3637
Coordinates listed in Table 2 based on Gauss Kruger - POSGAR 94 Zone 2
Link to location, lengths and geochemical results of the different drill holes, for January to February
2023 at Los Azules:
https://www.mcewenmining.com/files/doc_news/archive/2023/2023_02_Los_Azules/2023_02_Los_Azul
es_Assays_Composites_CollarLocations.xls
ABOUT MCEWEN MINING
McEwen Mining is a gold and silver producer with operations in Nevada, Canada, Mexico and Argentina.
In addition, it owns approximately 52% of McEwen Copper which owns the large, advanced stage Los
Azules copper project in Argentina. The Company’s goal is to improve the productivity and life of its assets
with the objective of increasing its share price and providing a yield. Its Chairman and Chief Owner has
personally provided the company with $220 million and takes an annual salary of $1. ”
The McEwen Mining press release appears to be prepared by Qualified Persons (as that term is defined
by National Instrument 43 -101 – Standards of Disclosure for Mineral Projects ) and the procedures,
methodology and key assumptions disclosed therein are those adopted and consistently applied in the
mining industry, but no Qualified Person engaged by TNR has done sufficient work to analyze, interpret,
classify or verify McEwen Mining’s information to determine the current mineral resource or other
information referred to in its press releases. Accordingly, the reader is cautioned in placing any reliance
on the disclosures therein.
“We are pleased that significant developments on the advancement of the Los Azules Project towards
feasibility have brought Stellantis as a strategic partner in the future development of this giant copper,
gold and silver project. An additional US $30 million stake in McEwen Copper has been invested by Rio
Tinto's Venture Nuton,” stated Kirill Klip, TNR’s Chief Executive Officer. “TNR Gold's vision is aligned
with the leaders of innovation among automakers like Stellantis, with the aim of decarbonizing mobility,
and our mining industry leaders like Rob McEwen, with a vision ‘to build a mine for the future, based on
regenerative principles that can achieve net zero carbon emissions by 2038.’
Green energy rEVolution relies on the supply of critical metals like copper; delivering "green copper" to
Argentina and the world will contribute to the clean energy transition and electrification of transportation
and energy industries.
2
Strong team performance is accelerating McEwen Copper Los Azules program in 2023. These new
exploration results highlight the potential to create additional value for the Los Azules Project, and
continuity of mineralization in the infill program is de-risking the project.
It’s very encouraging to see the opportunity to expand the deposit, and the involvement of Rio Tinto,
which may accelerate realizing the enormous potential of the Los Azules Project with Rio Tinto’s
innovative technology. Together with Nuton, McEwen Copper is exploring new technologies that save
energy, water, time and capital, advancing Los Azules towards the goal of the leading environmental
performance.
Los Azules was ranked in the top 10 largest undeveloped copper deposits in the world by Mining
Intelligence (2022).
TNR Gold does not have to contribute any capital for the development of the Los Azules Project. The
essence of our business model is to have industry leaders like McEwen Mining as operators on the
projects that will potentially generate royalty cashflows to contribute significant value for our
shareholders.”
ABOUT TNR GOLD CORP.
TNR Gold Corp. is working to become the green energy metals royalty and gold company.
Our business model provides a unique entry point in the creation of supply chains for critical materials
like energy metals that are powering the energy rEVolution, and t he gold industry that is providing a
hedge for this stage of the economic cycle.
Our portfolio provides a unique combination of assets with exposure to multiple aspects of the mining
cycle: the power of blue-sky discovery and important partnerships with industry leaders as operators on
the projects that have the potential to generate royalty cashflows that will contribute significant value for
our shareholders.
Over the past twenty-seven years, TNR, through its lead generator business model, has been successful
in generating high -quality global exploration projects. With the Company’s expertise, resources and
industry network, the potential of the Mariana Lithium Project and Los Azules Copper Project in Argentina
among many others have been recognized.
TNR holds a 1.5% NSR Royalty on the Mariana Lithium Project in Argentina, of which 0.15% NSR royalty
is held on behalf of a shareholder. Ganfeng Lithium’s subsidiary, Litio Minera Argentina (“LMA”), has the
right to repurchase 1.0% of the NSR royalty on the Mariana Project, of which 0.9% is the Company’s
NSR Royalty interest. The Company would receive CAN$900,000 and its shareholder would receive
CAN$100,000 on the repurchase by LMA, resultin g in TNR holding a 0.45% NSR royalty and its
shareholder holding a 0.05% NSR royalty.
The Mariana Lithium Project is 100% owned by Ganfeng Lithium. The Mariana Lithium Project has been
approved by the Argentina provincial government of Salta for an enviro nmental impact report, and the
construction of a 20,000 tons-per-annum lithium chloride plant has commenced.
2
TNR Gold also holds a 0.4% NSR Royalty on the Los Azules Copper Project, of which 0.04% of the 0.4%
NSR royalty is held on behalf of a shareholde r. The Los Azules Copper Project is being developed by
McEwen Mining.
TNR also holds a 7% net profits royalty holding on the Batidero I and II properties of the Josemaria Project
that is being developed by Lundin Mining. Lundin Mining is part of the Lundin Group, a portfolio of
companies producing a variety of commodities in several countries worldwide.
TNR provides significant exposure to gold through its 90% holding in the Shotgun Gold porphyry project
in Alaska. The project is located in Southwestern Alaska near the Donlin Gold project, which is being
developed by Barrick Gold and Novagold Resources. The Company’s strategy with the Shotgun Gold
Project is to attract a joint venture partnership with a major gold mining company. The Company is
actively introducing the project to interested parties.
At its core, TNR provides a wide scope of exposure to gold, copper, silver and lithium through its holdings
in Alaska (the Sh otgun Gold porphyry project) and royalty holdings in Argentina (the Mariana Lithium
project, the Los Azules Copper Project and the Batidero I & II properties of the Josemaria Project), and
is committed to the continued generation of in -demand projects, whi le diversifying its markets and
building shareholder value.
On behalf of the Board of Directors,
Kirill Klip
Executive Chairman
www.tnrgoldcorp.com
For further information concerning this news release please contact Kirill Klip +1 604-229-8129
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Cautionary Statement Regarding Forward-Looking Information
Except for statements of historical fact, this news release contains certain “forward -looking information”
within the meaning of applicable securities law. Forward-looking information is frequently characterized
by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “will”, “could” and
other similar words, or statements that certain events or conditions “may” or “could” occur, although not
all forward-looking statements contain these identifying words. Specifically, forward -looking statements
in this news release include, but are not limited to, statements made in relation to: TNR’s corporate
objectives, ch anges in share capital, market conditions for energy commodities, the successful
completion of sales of portions of the NSR royalties and decisions of the government agencies and other
regulators in Argentina . Such forward -looking information is based on a number of assumptions and
subject to a variety of risks and uncertainties, including but not limited to those discussed in the sections
entitled “Risks” and “Forward-Looking Statements” in the Company’s interim and annual Management’s
Discussion and Analy sis which are available under the Company’s profile on www.sedar.com. While
management believes that the assumptions made and reflected in this news release are reasonable,
should one or more of the risks, uncertainties or other factors materialize, or sho uld underlying
2
assumptions prove incorrect, actual results may vary materially from those described in forward-looking
information. In particular, there can be no assurance that: TNR will be able to repay its loans or complete
any further royalty acquisiti ons or sales; debt or other financings will be available to TNR; or that TNR
will be able to achieve any of its corporate objectives. TNR relies on the confirmation of its ownership for
mining claims from the appropriate government agencies when paying rental payments for such mining
claims requested by these agencies. There could be a risk in the future of the changing internal policies
of such government agencies or risk related to the third parties challenging in the future the ownership of
such mining c laims. Given these uncertainties, readers are cautioned that forward -looking statements
included herein are not guarantees of future performance, and such forward -looking statements should
not be unduly relied on.
In formulating the forward-looking statements contained herein, management has assumed that business
and economic conditions affecting TNR and its royalty partners, McEwen Mining Inc., Ganfeng Lithium ,
and Lundin Mining will continue substantially in the ordinary course, including without limitat ion with
respect to general industry conditions, general levels of economic activity and regulations. These
assumptions, although considered reasonable by management at the time of preparation, may prove to
be incorrect.
Forward-looking information herein and all subsequent written and oral forward -looking information are
based on estimates and opinions of management on the dates they are made and are expressly qualified
in their entirety by this cautionary statement. Except as required by law, the Company assumes no
obligation to update forward -looking information should circumstances or management’s estimates or
opinions change.