Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TMQ.TO ·

Trilogy Metals Reports Third Quarter Fiscal 2019 Financial Results

Financials

1

Trust | Respect | Integrity

News Release

Trilogy Metals Reports Third Quarter Fiscal 2019 Financial Results

October 9, 201 9 - Vancouver, British Columbia – Trilogy Metals Inc. (TSX / NYSE

American: TMQ) ("Trilogy Metals” or "the Company”) announces its financial results for the

third quarter ended August 31, 2019. Details of the Company's financial results are contained

in the interim unaudited consolidated financial statements and Management's Discussion and

Analysis which will be available on the C ompany's website at www.trilogymetals.com, on

SEDAR at www.sedar.com and on EDGAR at www.sec. gov. All amounts are in United States

dollars unless otherwise stated.

Highlights

• Strong working capital position of $23.2 million and cash on hand of $26.9 million.

• Public release of the Ambler Mining District Industrial Access Project or Ambler Road

(“AMDIAP”) draft Environmental Impact Statement (“ EIS”) by the United States

Bureau of Land Management (“BLM”).

• Geotechnical drilling completed at Arctic for feasbility level studies with the goal of

completing the feasibility study in the first half of 2020.

• Exploration drilling substantially completed during the quarter at Bornite.

• Regional exploration completed at the Sunshine prospect.

Outlook and Project Activities

Ambler Mining District Industrial Access Project

In a press release dated August 23, 2019, the Company announced the public release of the

draft EIS for the Ambler access road by the BLM. This is a critical milestone for the permitting

of the AMDIAP in relation to further exploration and development of t he Ambler Mining

District. The BLM, which is the lead agency for the permitting of the AMDIAP, has now

completed the draft EIS which has been posted on the BLM website. The next step is a public

comment period. Comments on the draft EIS will be accepted through October 29, 2019.

Arctic Project

During the third quarter ended August 31, 2019, we drilled 11 holes at the Arctic Project

resulting in approximately 2,411 meters drilled, utilizing two rigs from Tuuq Drilling LLC

(“Tuuq”). Tuuq is owned by NANA Development Corporation. The Company anti cipates

announcing drill results from the 2019 Arctic drill program during the fourth quarter of 2019.

Work at the Arctic deposit commenced in late June with a view of completing feasibility level

geotechnical and hydrology work. The main goal of this year’s work program was to complete

TSX / NYSE American

Symbol: TMQ

2

Trust | Respect | Integrity

engineering and environmental studies to prepare a National Instrument 43 -101 compliant

feasibility study which results are anticipated to be released in the first half of 2020. Work is

also being done to prepare the Arctic Project for permitting, which we expect to commence in

2020. The permitting preparation work being carried out will support Federal, State and

Borough permitting requirements.

Bornite Project

The main goal of the 2019 drill program was to drill approximately 8,000 meters within 12

holes, including both infill and expansion drilling. Exploration activities commenced at the

beginning of June with 7,598 meters within 10 holes of drilling completed through to August

31, 2019. In a press release dated September 10, 2019, the Company announced assay

results on 4 holes comprising approximately 3,014 meters from the recently completed 7,610-

meter drill campaign. The Company anticipates announcing further drill results from the 2019

Bornite drill program during the fourth quarter of 2019.

Regional Exploration Project

District-wide Versatile Time Domain Electromagnetic (“VTEM”) and Z – Axis Tipper

Electromagnetic (“ZTEM”) helicopter airborne geophysical surveys were completed this spring

along the entire 100 -kilometer long belt of the favorable stratigraphy hosting known

polymetallic volcanogenic-massive sulphide (“VMS”) deposits, as well as the areas around the

Bornite deposit and the surrounding Cosmos Hills area. The surveys were flown by G eotech

Ltd. and the data is currently being re -processed by Resource Potential PTY Ltd. The new

VTEM and ZTEM surveys have been integrated into our dataset of historical drilling

accumulated over a 40-year period of exploration, all of which has been geo -referenced into

an integrated GIS database.

The exploration drilling completed during the field season targeted the Sunshine prospect,

which is approximately eight miles (13 kilometers) from the Arctic Project. In a press release

dated September 10, 2019, the Company announced assay results for one drill hole from the

Sunshine prospect comprising 161 meters of the 1,357 meter, six -hole drill campaign at this

prospect. The Company anticipates announcing further drill results from the 2019 regional

exploration program during the fourth quarter of 2019.

3

Trust | Respect | Integrity

Selected Results

The following selected financial information is prepared in accordance with U.S. GAAP.

in thousands of dollars,

except for per share amounts

Three months ended Nine months ended

Selected expenses August 31,

2019

$

August 31,

2018

$

August 31,

2019

$

August 31,

2018

$

General and administrative 435 376 1,363 1,175

Mineral properties expense 10,951 9,051 15,392 12,657

Professional fees 414 13 658 286

Salaries 272 286 835 738

Salaries – stock-based compensation 402 204 3,005 1,277

Investor relations 164 59 456 261

Loss and comprehensive loss for the

period

12,535 9,920 21,380 16,530

Basic and diluted loss per common

share

$0.09 $0.08 $0.16 $0.14

For the three - month period ended August 31, 2019, Trilogy reported a net loss of $12.5

million (or $0.09 basic and diluted loss per common share) which was higher than the net

loss of $9.9 million for the comparative period in 2018 (or $0.08 basic and d iluted loss per

common share). This variance was primarily due to an increase in mineral properties expense

due to the size, scope and timing of the field program versus the comparative three – month

period.

The $1.9 million difference in mineral properti es expense consists of the following changes.

During the three months ended August 31, 2019, we completed 2,411 meters (2018 – 593

meters) of drilling at the Arctic project, 7, 598 meters (2018 – 7,707 meters) at the Bornite

project and executed a new regio nal exploration drilling program of approximately 1,357

meters. As a result, we incurred increased drilling costs of $1.1 million and increased project

supporting costs of $0.6 million (including camp operation, logistics and personnel). The

remaining variance in mineral properties expense consists of an increase of $0.4 million in

engineering costs related to the feasibility study and the geotechnical study for the Arctic

project, an increase of $0.1 million in geochemistry costs associated with drill ass ay testing,

all offset by a $0.3 million decrease in geophysics and environment related costs.

Other differences noted for the comparable periods were: i) a slight increase in general and

administrative expenses in the current period; ii) an increase of $ 0.4 million in professional

fees due to increased legal fees; iii) an increase of $0.2 million in stock -based compensation

due to a higher share price contributing to a higher fair value vesting for previously granted

stock options, RSUs and DSUs; and iv) an increase of $0.1 million in investor relations

expenses due to the Company’s increased level of marketing activity including attendance at

more investor conferences and meetings in the current period.

For the nine - month period ended August 31, 2019, Trilogy reported a net loss of $21.4

million (or $0.16 basic and diluted loss per common share) compared to a net loss of $16.5

million for the corresponding period in 2018 (or $0.14 basic and diluted loss per common

share).

The $2.7 million increase in mineral properties expense in relation to the c omparative nine -

month period ended August 31, 2018 consist of the following changes. Due to the increased

4

Trust | Respect | Integrity

size and scope of the 2019 field program, we drilled 3,066 more meters for the nine - months

ended August 31, 2019 in contrast to the comparative period, resulting in an increase of $1.1

million in drilling costs. Project support and personnel costs increased by $1.1 million and

includes $0.5 million in VTEM and ZTEM airborne survey costs, for which there are no prior

year comparatives. The remaining variance in mineral properties expense consists of an

increase of $0.5 million in engineering costs and an increase of $0.3 million in geochemistry

costs, all offset by a decrease of $0.3 million in geophysics costs.

Other differences noted for the compar able periods were: i) an increase of $0.2 million in

general and administration costs primarily due to increased stock exchange fees, office

computer hardware and software, and travel costs; ii) a slight increase in salaries; iii) an

increase of $0.2 million in investor relations expenses due to the Company’s increased level

of marketing activity including attendance at more investor conferences and meetings during

the nine - month period ended August 31, 2019; iv) an increase of $0.4 million in professional

fees due to increased legal fees; and v) an increase of $1.7 million in stock -based

compensation due to a higher share price contributing to a greater fair value amortization of

stock options, RSUs and DSUs granted during the nine - month period ended August 31, 2019.

Liquidity and Capital Resources

At August 31, 2019, we had $26.9 million in cash and cash equivalents and working capital

of $23.2 million. During the three -month period ended August 31, 2019, the Company

received proceeds of approximatel y $9.9 million as a result of an exercise of 6,521,740

warrants.

The increase in cash was a result of fully receiving the $9.2 million Year 3 funding from

South32, an additional $1.0 million for the regional exploration program and an injection of

$9.9 million upon exercise of all warrants. These cash inflows were offset by $15.4 million in

mineral properties expense, $3.3 million in cumulative general and administrative expenses,

investor relations, professional fees, salaries and $2.5 million in cash sa vings from changes

in net non-cash working capital. The increase in working capital for the period was a result of

higher accounts payable and prepaid balances, offset by a higher accounts receivable balance

as at August 31, 2019.

We expended $15.8 million on operating activities during the nine months ended August 31,

2019 compared with $14.6 million for operating activities for the same period in 2018. Most

cash spent on operating activities during all periods was expended on mineral property

expenses, general and administrative, salaries and professional fees.

The Company continues to fund its cash expenditures through its working capital. As the

Company is not currently in production, the Company will need to raise additional funds to

support its operations and administration expenses in the future. Future sources of liquidity

may include debt financing, equity financing, convertible debt, exercise of options, or other

means. The continued operations of the Company are dependent on its ability to obta in

additional financing or to generate future cash flows.

All cash generated from investing activities during the nine months ended August 31, 2019

were from the South 32 Option Agreement funding of $10.2 million (2018 - $10.4 million)

and there were no p roceeds from the sale of investments (2018 - $2.3 million) as all Gold

Mining Inc. shares were full disposed during fiscal 2018. During the nine months ended

August 31, 2019, $9.9 million in cash was generated from financing activities (2018 - $26.9

5

Trust | Respect | Integrity

million).

Qualified Persons

Andrew W. West, Certified Professional Geologist, Exploration Manager for Trilogy Metals Inc.,

is a Qualified Person as defined by National Instrument 43 -101. Mr. West has reviewed the

technical information in this news release and approves the disclosure contained herein.

About Trilogy Metals

Trilogy Metals Inc. is a metals exploration company focused on exploring and developing the

Ambler mining district located in northwestern Alaska. It is one of the richest and most -

prospective known copper -dominant districts located in one of the safest geopolitical

jurisdictions in the world. It hosts world-class polymetallic VMS deposits that contain copper,

zinc, lead, gold and silver, and carbonate replacement deposits which have been found to

host high grade copper mineralization. Exploration efforts have been focused on two deposits

in the Ambler mining district - the Arctic VMS deposit and the Bornite carbonate replacement

deposit. Both deposits are located within the Company 's land package that spans

approximately 143,000 hectares. The Company has an agreement wit h NANA Regional

Corporation, Inc., a Regional Alaska Native Corporation , that provides a framework for the

exploration and potential development of the Ambler mining district in cooperation with local

communities. Our vision is to develop the Ambler mining district into a premier Nort h

American copper producer.

Company Contacts

Elaine Sanders Patrick Donnelly

Vice President & Chief Financial Officer Vice President Corporate Communications

& Development

604-638-8088 or 1-855-638-8088

# # #

Cautionary Note Regarding Forward-Looking Statements

This press release includes certain "forward-looking information” and "forward-looking statements”

(collectively "forward-looking statements”) within the meaning of applicable Canadian and United

States securities legislation including the United States Private Securities Litigation Reform Act of

1995. All statements, other than statements of historical fact, included herein, including, without

limitation, statement under O utlook and Project Activities , anticipated timing and results of a

feasibility study on the Arctic Project , the future operating or financial performance of the

Company, planned expenditures and the anticipated activity at the Upper Kobuk Mineral Projects,

including permitting and drill results, are forward-looking statements. Forward-looking statements

are frequently, but not always, identified by words such as "expects”, "anticipates”, "believes”,

"intends”, "estimates”, "potential”, "possible”, and similar expressions, or statements that events,

conditions, or results "will”, "may”, "could”, or "should” occur or be achieved. Forward -looking

statements involve various risks and uncertainties. There can be no assurance that such

statements will prove to be accura te, and actual results and future events could differ materially

from those anticipated in such statements. Important factors that could cause actual results to

differ materially from the Company's expectations include uncertainties involved in the

interpretation of drilling results and geological tests and the estimation of reserves and resources;

the need for cooperation of government agencies and native groups in the development and

operation of properties as well as the construction of the access road; the need to obtain permits

and governmental approvals; risks of construction and mining projects such as accidents,

equipment breakdowns, bad weather, non -compliance with environmental and permit

6

Trust | Respect | Integrity

requirements, unanticipated variation in geological structur es, metal grades or recovery rates;

unexpected cost increases, which could include significant increases in estimated capital and

operating costs; fluctuations in metal prices and currency exchange rates; and other risks and

uncertainties disclosed in the Company’s Annual Report on Form 10 -K for the year ended

November 30, 2018 filed with Canadian securities regulatory authorities and with the United States

Securities and Exchange Commission and in other Company reports and documents filed with

applicable s ecurities regulatory authorities from time to time. The Company's forward -looking

statements reflect the beliefs, opinions and projections on the date the statements are made. The

Company assumes no obligation to update the forward -looking statements or be liefs, opinions,

projections, or other factors, should they change, except as required by law.

Cautionary Note to United States Investors

Estimates of mineralization and other technical information have been prepared in accordance

with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43 -101”).

Canadian standards, including NI 43 -101, differ significantly from the current requirements

of the SEC, and information on mineral deposits contained herein may not be comparable to

similar information disclosed by U.S. companies. In particular, and without limiting the

generality of the foregoing, the term "resource” does not equate to the term "reserves”, and

the requirements for “reserves” under NI 43 -101 are also not the same as those under SEC

rules. Under U.S. standards, mineralization may not be classified as a "reserve” unless the

determination has been made that the mineralization could be economically and legally

produced or extracted at the time the reserve determination is made. The SEC's disclosure

standards normally do not permit the inclusion of information concerning "measured mineral

resources”, "indicated mineral resources” or "inferred mineral resources” or other descriptions

of the amount of mineralization in mineral deposits that do not constitute "reserves” by U.S.

standards in documents filed with the SEC. Investors are cautioned not to assume that any

part or all of mineral deposits in these categories will ever be converted into reserves.

Accordingly, information concerning mineral deposits set forth in this press release may not

be comparable with information made public by companies that report in accordance with

U.S. standards.