Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TMQ.TO ·

Trilogy Metals Reports High Grade Drilling Results at the Bornite Project

Drill Results

1

Trust | Respect | Integrity

News Release

Trilogy Metals Reports High Grade Drilling Results at the Bornite

Project

October 28, 201 9 - Vancouver, British Columbia – Trilogy Metals Inc. (TSX/NYSE

American: TMQ) ("Trilogy Metals” or the “Company”) is pleased to announce the second and

final set of assay results from this summer’s exploration diamond drilling program at the

Bornite Project, which is part of the Company’s Upper Kobuk Mineral Projects (“UKMP”) located

in the Ambler mining district of Northwest Alaska. All amounts are in USD.

The six Bornite drill holes reported below comprise approximately 4,596 meters from the

7,610-meter drill campaign which was completed in September. The results from the first four

holes at Bornite were announced on September 10, 2019. Three of the six drill holes contain

significant copper mineralization and were designed as infill holes to the 300 to 400 -meter

step-out holes completed in 2017 and 2018 . Whereas, the other three holes are step out

exploration holes.

Drilling Highlights – Bornite Project

At a cutoff grade of 0.5% copper the most recent drill results from the Bornite Project are as

follows:

• RC19-0264 intersected 20 mineralized intervals including:

o 78.9 metres averaging 2.35% copper;

o 44.7 metres averaging 1.29% copper;

o 48.1 metres averaging 1.13% copper; and

o 15.5 metres averaging 3.24% copper.

• RC19-0265 intersected 11 mineralized intervals including:

o 16.3 metres averaging 2.93% copper;

o 24.3 metres averaging 1.52% copper; and

o 12. 4 metres averaging 1.95% copper.

• RC19-260 intersected eight mineralized intervals including:

o 8.1 metres averaging 1.75% copper.

• The remaining three holes (RC19 -0262, RC19 -0263 and RC19 -0266), which are

exploration holes, did not encounter any significant mineralization.

TSX, NYSE American

Symbol: TMQ

2

Trust | Respect | Integrity

At a higher cutoff grade of 1.5% copper, the most recent drill results from the Bornite Project

are as follows:

• RC19-0264 intersected 18 mineralized intervals including:

o 22.8 metres averaging 2.86% copper;

o 5.1 metres averaging 11.01% copper;

o 7.2 metres averaging 5.98% copper;

o 13.0 metres averaging 1.92% copper; and

o 6.7 metres averaging 2.14% copper.

• RC19-0265 intersected 10 mineralized intervals including:

o 8.7 metres averaging 4.58% copper;

o 12.4 metres averaging 2.01% copper; and

o 8.9 metres averaging 2.38% copper.

James Gowans, Interim President and CEO of Trilogy Metals commented , “One of the factors

that drew me to become involved with the Company is the fact that the Bornite Project is one

of the highest-grade copper projects in the world. As an engineer, who had constructed high-

quality mines throughout the world , the Bornite Project has many affinities to some of the

world class assets that I have worked on, specifically the size and grade. I look forward to

advancing this project, which nicely complements our other high-grade project at Arctic.”

The 2019 drilling budget of $ 9.2 million for Bornite was funded entirely by South32 Limited

(ASX, LSE, JSE: S32; ADR: SOUHY) (“South32”), which funding represents the third and final

payment under the Company’s option agreement (as amended, the “Option Agreement”) with

South32 and maintains the Option Agreement in good standing.

This year’s program at Bornite was comprised of 1 0 drill holes totaling approximately 7,610

metres through a combination of infill and expansion drill holes in and around the known

resource. The first set of results from four drill holes was released on September 10, 2019

(https://trilogymetals.com/news/2019/trilogy-metals-reports-drilling-results-from-newly-

discovered-zone-at-the-sunshine-prospect-and-drilling-results-at-the-bornite-project).

RC19-0262, RC19-0263 and RC19 -0266 were all exploration holes designed to test targets

identified by various geophysical methods away from the existing resource. RC19-0262 was

designed to test the far east side of the deposit following up on a district-wide Versatile Time

Domain Electromagnetic (“VTEM”) anomaly identified during the spring 2019 VTEM/Z – Axis

Tipper Electromagnetic (“ZTEM”) survey; RC19-0263, on the far west side of the deposit was

testing a gravity anomaly identified during the 2017 field program; and RC19-0266 was testing

the south -end of the South Reef mineralization where copper mineralization (azurite,

malachite) is observed at the surface of Iron Mountain.

On September 1, 2019, Trilogy Metals completed its summer exploration drilling program at

Bornite and Sunshine and geotechnical activities at its Arctic Project. Additional drill results

from the Arctic Project and the Sunshine prospect are anticipated to be released over the next

few weeks as they become available.

Results for Bornite are presented in Table 1 at a cutoff grade of 0.5% copper to be comparable

with previous drill results released by the Company. All but hole RC19 -0264 were drilled

normal to stratigraphy and therefore the intercepts can be considered to be true widths. Hole

RC19-0264 was drilled at a northeast azimuth to intersect a moderately southwest dipping

3

Trust | Respect | Integrity

mineralized carbonate vein set identified in previous oriented drill holes and is oblique to the

main stratigraphically controlled mineralization. Results at a more selective higher-grade cutoff

of 1.5% copper are also presented in Table 2 to show locally higher-grade intervals. Table 3

shows drill hole locations. Figure 1 shows the location of the drill holes on a plan map and

Figure 2 shows a cross -section through drill hole RC19-0264 and Figure 3 shows a cross -

section through drill hole RC19-0265.

Table 1 - 0.5% Cu cut-off with maximum 3 m internal waste – Minimum 1.5 m interval

Hole From (m) To (m) Length (m) Cu (%) Co (%)

RC19-0260

652.05 655.77 3.72 0.62 0.010

664.59 672.69 8.1 1.75 0.010

814.12 815.69 1.57 0.82 0.001

856.66 858.62 1.96 0.55 0.014

864.29 865.93 1.64 0.69 0.013

869.3 871.54 2.24 0.72 0.019

899.23 900.85 1.62 0.62 0.004

907.59 911.83 4.24 1.37 0.015

RC19-0262 No Significant Mineralization

RC19-0263 No Significant Mineralization

RC19-0264

228.98 231.35 2.37 0.75 0.001

383.4 391.68 8.28 0.73 0.020

394.92 410.83 15.91 0.53 0.015

420.02 468.13 48.11 1.13 0.020

471.88 516.61 44.73 1.29 0.015

522.41 530.35 7.94 0.81 0.011

533.4 543.71 10.31 0.89 0.008

549.16 595.1 45.94 0.81 0.008

600.04 603.5 3.46 0.54 0.029

610.88 629.61 18.73 0.59 0.008

640.25 643.81 3.56 0.70 0.010

648 653.64 5.64 0.46 0.013

660.04 676.3 16.26 0.93 0.010

680.95 694.18 13.23 1.06 0.016

718.73 797.66 78.93 2.35 0.017

801.32 816.82 15.5 3.24 0.028

827.4 835.37 7.97 0.73 0.007

841.56 845.82 4.26 0.63 0.015

864.41 865.93 1.52 0.76 0.009

923.54 927.21 3.67 0.73 0.012

4

Trust | Respect | Integrity

Table 1. Continued

Hole From (m) To (m) Length (m) Cu (%) Co (%)

RC19-0265

520.6 523.34 2.74 2.82 0.030

534.51 542.37 7.86 1.59 0.004

560.53 572.92 12.39 1.95 0.015

576.8 580.83 4.03 2.54 0.014

594.8 611.09 16.29 2.93 0.078

628.19 629.88 1.69 0.72 0.005

633.68 657.93 24.25 1.52 0.010

667.67 678.14 10.47 0.99 0.007

682.14 687.45 5.31 1.85 0.007

696.83 698.69 1.86 2.44 0.002

RC19-0266 No Significant Mineralization

Table 2 - 1.5% Cu cut-off with maximum 3 m internal waste – Minimum 1.5 m interval

Hole From (m) To (m) Length (m) Cu (%) Co (%)

RC19-0260 665.78 668.73 2.95 3.08 0.019

RC19-0262 No Significant Mineralization

RC19-0263 No Significant Mineralization

RC19-0264

436.79 449.76 12.97 1.92 0.036

475.29 477.29 2.00 1.75 0.018

480.43 485.87 5.44 1.97 0.008

488.9 495.58 6.68 2.14 0.007

528.61 530.35 1.74 1.55 0.009

537 538.83 1.83 1.66 0.007

559.76 561.82 2.06 2.22 0.010

661.77 663.58 1.81 1.59 0.014

685.95 687.63 1.68 1.83 0.018

722.58 727.99 5.41 2.44 0.021

731.52 733.45 1.93 2.23 0.008

740.7 745.24 4.54 2.29 0.015

752.86 775.68 22.82 2.86 0.032

781.87 786.99 5.12 11.01 0.006

5

Trust | Respect | Integrity

Table 2. Continued

Hole From (m) To (m) Length (m) Cu (%) Co (%)

RC19-0264 801.32 802.95 1.63 1.62 0.005

809.63 816.82 7.19 5.98 0.055

RC19-0265

520.6 522.27 1.67 3.71 0.041

536.06 537.07 1.01 9.06 0.004

564.03 572.92 8.89 2.38 0.018

578.51 580.83 2.32 3.61 0.021

598.6 607.32 8.72 4.58 0.139

635.51 637.49 1.98 2.51 0.020

645.57 657.93 12.36 2.01 0.013

671.82 673 1.18 2.68 0.001

684.03 687.45 3.42 2.41 0.005

696.83 698.69 1.86 2.44 0.002

RC19-0266 No Significant Mineralization

Table 3 – Bornite Drill Hole Locations

Hole East (m) North (m) Elevation (m) Azimuth Dip Length

RC19-0260 590464 7440760 319 206 -77 947

RC19-0262 591218 7439500 435 206 -77 915

RC19-0263 588910 7440860 211 206 -80 738

RC19-0264 589837 7440408 246 34 -65 960

RC19-0265 590631 7440377 292 206 -75 748

RC19-0266 589256 7438650 508 220 -70 288

Mineralization within the Bornite deposit occurs as a series of “Reefs” hosted by both the Upper

and Lower Bornite Carbonate sequences separated by generally unmineralized phyllite unit s.

The Cu-Co mineralization at Bornite occurs in three distinct carbonate zones, the Upper Reef,

the Lower Reef and the South Reef. All three zones were drill tested this year.

Mineralization is typically observed as breccia matrix replacement and is generally dominated

by chalcopyrite and sometimes by bornite with chalcocite – particularly in the higher -grade

zones. Mineralization can also be observed as vein and replacement zo nes containing

chalcopyrite and calcite/dolomite gangue. These styles of mineralization were observed in all

holes mentioned in this press release.

6

Trust | Respect | Integrity

Figure 1- Map Showing Location of 2019 Drilling Program at Bornite

QA/QC Program Bornite

The drill program, sampling protocol, and data verification were managed by qualified persons

employed by the Company. Diamond drill holes were typically collared at PQ (internal diameter

of 85 millimeters) and reduced to HQ (internal diameter of 63.5 millimeters) during the drilling

process. Samples were collected using a 0.2 -metre minimum length, a 2.5 -metre maximum

length and a 1.9-metre average sample length. Drill core recovery averaged 93% for Bornite

drill core. Three quality control samples (one blank, one certified standard and one duplicate)

were inserted into each batch of 20 samples. The drill core was sawn, with half sent to ALS

Minerals in Fairbanks for sample preparation and the sample pulps forwarded to ALS's North

Vancouver facility for analysis. ALS Minerals is an independent company certified as ISO

9001:2008 and accredited to ISO / IEC 17025:2005 from the Standards Council of Canada.

The assay results for the primary and quality control samples were reviewed by an independent

database manager and passed with good inferred quality. The Company will submit 5% of the

assay intervals from prospective lithologies to an independent check assay lab.

7

Trust | Respect | Integrity

Figure 2 – Cross Section of Bornite Drilling Showing RC19-0264 Results

8

Trust | Respect | Integrity

Figure 3 – Cross Section of Bornite Drilling Showing RC19-0265 Results

Qualified Persons

Andrew W. West, Certified Professional Geologist, Exploration Manager for Trilogy Metals Inc.,

is a Qualified Person as defined by National Instrument 43 -101. Mr. West has reviewed the

scientific and technical information in this news release and approves the disclosure contained

herein.