January 20, 20 22 - Vancouver, British Columbia – Trilogy Metals Inc. (TSX/NYSE

American: TMQ) (" Trilogy” or the “Company”) is pleased to announce the release of an

updated mineral resource estimate for the Bornite Project located in the highly prospective

Ambler Mining District of Northwest Alaska. The Bornite Project forms part of the Upper Kobuk

Mineral Projects (“UKMP”), owned by Ambler Metals LLC (“Ambler Metals”), the joint venture

operating company equally owned by Trilogy and a wholly owned subsidiary of South32 Limited

(ASX, LSE, JSE: S32; ADR: SOUHY) (“South32”).

Highlights of the Updated Bornite Resource Estimate

• At a base case 0.50% copper cut -off grade and constrained within a limiting pit shell,

the Bornite Project is estimated to contain in -pit indicated mineral resources of 41.7

million tonnes grading 1.04% copper for 955 million pounds of contained copper

and in-pit inferred mineral resources of 93.9 million tonnes grading 0.98% copper

for 2.0 billion pounds of contained copper (see Table 1 for details).

• Below the resource limiting pit shell, and at a base case cut-off grade of 1.5% copper,

the combined South Reef and Ruby Zone is estimated to contain additional inferred

mineral r esources of 50.3 million tonnes grading 2.97% copper for 3.3 billion

pounds of contained copper (see Table 1 for details).

• The South Reef area, which represents the bulk of the resources located below the pit

shell, has inferred mineral r esources estimated at 35.3 million tonnes grading

3.39% copper for 2.6 billion pounds of contained copper (see Table 1 for details).

• Below the resource pit shell, t he Ruby Zone has inferred mineral resources estimated

to be 15 million tonnes grading 1.98% copper for 653 million pounds of contained

copper (see Table 1 for details).

• The total cobalt inferred mineral resource (in-pit and below pit) , based on a cut -off

grade of 0.5% copper, is 185.8 million tonnes grading 0.021% cobalt for 88 million

pounds of contained cobalt (see Table 2 for details).

The sensitivity of mineral resources located below the pit shell to the cut-off grade is shown in

Table 3 for the South Reef area and in Table 4 for the Ruby Zone.

This mineral resource estimate was prepared for Trilogy Metals Inc. by Robert Sim, P.Geo.,

SIM Geological Inc. (“SGI”) and Bruce M. Davis, FAusIMM, (“BMD”), who are both independent

Qualified Persons as set forth by National Instrument 43 -101. A National Instrument 43-101

(NI 43-101) technical report detailing the mineral resource estimate for the Bornite Project will

TSX, NYSE American

Symbol: TMQ

2 Trust | Respect | Integrity

be completed and filed on SEDAR (www.sedar.com) within 45 days of this news release.

Table 1. Estimate of Copper Mineral Resources for the Bornite Project

Notes:

(1) Resources stated as contained within a pit shell developed using a metal price of US$3.50/lb

copper, mining costs of US$3.00/tonne, milling costs of US$11.00/tonne, underground mining

cost of US$65.00/tonne, G&A cost of US$5.00/tonne, 87% metallurgical recoveries and an

average pit slope of 43 degrees.

(2) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

There is no certainty that all or any part of the Mineral Resources will be converted into Mineral

Reserves.

(3) It is reasonably expected that the majority of Inferred mineral resources could be upgraded to

Indicated mineral resources with additional exploration.

Table 2. Estimate of Cobalt Mineral Resources for the Bornite Project

Notes:

(1) Mineral Resources stated as contained within a pit shell developed using a metal price of

US$3.50/lb copper, mining costs of US$3.00/tonne, milling costs of US$11.00/tonne,

underground mining cost of US$65.00/tonne, G&A cost of US$5.00/tonne, 87% metallurgical

recoveries and an average pit slope of 43 degrees.

(2) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

There is no certainty that all or any part of the Mineral Resources will be converted into Mineral

Reserves.

(3) It is reasonably expected that the majority of Inferred mineral resources could be upgraded to

Indicated mineral resources with additional exploration.

(4) Due to limited sample data, none of the cobalt mineral resource meets the confidence level for

Indicated-class mineral resources. All cobalt mineral resources are considered to be in the

Inferred category.

Tonnes Average Grade Contained Metal

(million) Cu (%) Cu (Mlbs)

Indicated In-Pit 0.5 41.7 1.04 955

Total Indicated 41.7 1.04 955

Inferred In-Pit 0.5 93.9 0.98 2,034

Inferred Below-Pit South Reef 1.5 35.3 3.39 2,639

Inferred Below-Pit Ruby Zone 1.5 15.0 1.98 653

Total Inferred 144.1 1.68 5,326

Class Type Cut-off (Cu%)

Tonnes Average Grade Contained Metal

(million) Co (%) Co (Mlbs)

Inferred In-Pit 0.5 135.6 0.017 51

Inferred Below-Pit South Reef 1.5 35.3 0.039 30

Inferred Below-Pit Ruby Zone 1.5 15.0 0.021 7

Total Inferred 185.8 0.021 88

Class Type Cut-off (Cu%)

3 Trust | Respect | Integrity

Table 3. Sensitivity to Cut-Off Grade of Inferred Mineral Resources Below the Base Case Pit

Shell in the South Reef Area

Notes:

(1) Base case cut-off grade of 1.50% copper is shown in bold in the table.

(2) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

There is no certainty that all or any part of the Mineral Resources will be converted into Mineral

Reserves.

(3) It is reasonably expected that the majority of Inferred mineral resources could be upgraded to

Indicated mineral resources with additional exploration.

Table 4. Sensitivity to Cut-Off Grade of Inferred Mineral Resources Below the Base Case Pit

Shell in the Ruby Zone

Notes:

(1) Base case cut-off grade of 1.50% copper is shown in bold in the table.

(2) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

There is no certainty that all or any part of the Mineral Resources will be converted into Mineral

Reserves.

(3) It is reasonably expected that the majority of Inferred mineral resources could be upgraded to

Indicated mineral resources with additional exploration.

Tony Giardini, President and CEO of Trilogy, commented, ”As seen in Figure 1, the Bornite and

Arctic projects not only have a significant amount of copper but both assets also have some of

the highest grades in the world and easily stand apart from our copper peers . I want to also

note that the rationale of this u pdated resource estimate is to highlight the South Reef area

which, based on drilling, appears to be amenable to underground bulk mining methods due to

its exceptional mineralized widths and continuity. While our Ambler Metals Joint Venture team

has been focused on the Arctic Project, which is located 24 kilometers from Bornite, we want

to remind investors that Bornite is also a very compelling copper-cobalt project and is one of

the highest -grade undeveloped copper assets in the world. We will now pass alo ng this

resource estimate to the Ambler Metals Joint Venture team which will look at ways at

integrating this asset with our other assets within the UKMP.”

Cu (%) Co (%) Cu (Mlbs) Co (Mlbs)

1.00 60.3 2.51 0.028 3,339 37

1.25 42.2 3.07 0.035 2,861 32

1.50 Base Case 35.3 3.39 0.039 2,639 30

1.75 31.8 3.57 0.041 2,499 29

2.00 29.8 3.67 0.043 2,413 28

Average Grade Contained Metal

Inferred

Cut-off (Cu %) Tonnes

(million)

Cu (%) Co (%) Cu (Mlbs) Co (Mlbs)

1.00 48.7 1.5 0.019 1,604 21

1.25 26.8 1.75 0.02 1,033 12

1.50 Base Case 15.0 1.98 0.021 653 7

1.75 7.8 2.2 0.022 378 4

2.00 3.1 2.41 0.022 165 2

Inferred

Cut-off (Cu %) Tonnes

(million)

Average Grade Contained Metal

4 Trust | Respect | Integrity

Richard Gosse, Vice -President Exploration for Trilogy, commented, “The current resource

update confirms the significant size and copper grades at the Bornite project and puts the

spotlight on the high-grade resource in the South Reef area, which is being separately reported

in the below-pit inferred resource category in this update. Besides its exceptional grade, South

Reef is characterized by good thickness and continuity, and its discovery in 2011, more than

60 years after copper was first discovered at B ornite, points to the excellent exploration

potential for other Bornite-type deposits nearby in the Cosmos Hills and the Ambler Lowlands.”

Figure 1. Comparison of Trilogy’s Mineral Resources Compared to its Peers

Notes:

(1) Peer group data as per latest company documents and public filings.

(2) Assumes all assets on a 100% basis. Trilogy has a 50% interest in the UKMP which includes the

Arctic and Bornite Projects.

Comparison of 2018 and 2021 Resource Estimates

Table 5 shows a comparison between the 2018 resource estimate and the current estimate of

mineral resources. As can be seen below, the Indicated and Inferred in-pit resource tonnage

estimates increased by 3 % and 1 2%, respectively. While the below -pit resource tonnage

decreased by 13%, the average copper grade increased from 2.89% to 2.97%. Total inferred

resource tonnage (in-pit and below-pit) decreased by about 2%.

5 Trust | Respect | Integrity

Table 5. Comparison of Current and Previous Resource Estimates for the Bornite Deposit

Factors that contribute to the changes in mineral resources are summarized as follows:

• The current mineral resource estimate includes the results of drilling that was conducted

in 2017, 2018, and 2019, but the 2017 drill holes were too widely spaced to support

updated mineral resources on the northern (down-dip) part of the deposit at that time.

The additional drilling had no impact on the distribution of mineral resources in the

Indicated category located inside the resource pit shell. Most of the new drilling was

located along the northern, down-dip side of the deposit, or in the vicinity of the South

Reef area. These additional drill holes generally resulted in a slight reduction in the

volume (tonnage) of mineral resources , but with a corresponding increase in both

copper and cobalt grades.

• The interpretations of geologic domains and trend planes were updated based on all

available drilling information. The differences in these interpretations compared to the

previous resource estimate are relatively minor.

• The projected operating costs and metal prices used to generate the resource

constraining pit shell were updated to reflect the current mining environment. The

mining cost was increased, by 50% from US$2.00/tonne to US$3.00/tonne and the

copper price was increased from US$3.00/lb to US$3.50/lb. These changes have

resulted in a slightly larger resource constraining pit shell, which generally increased

the volume of open -pit mineral resources and decreased the amount of underground

mineral resources.

• The new mineral resource estimate was subjected to a critical review of the continuity

of grade and thickness of mineralization below the pit shell; this was completed to

ensure that the mineral resource exhibits reasonable prospect s for eventual economic

extraction using underground mining methods. This process has eliminated some of the

more isolated mineralized areas that were present in the previous mineral resource

estimate.

2017-2019 Drilling Campaigns

During the summer of 2017, seven drill holes were completed, totaling 8,437 meters, that

tested the down-dip continuity of the northern part of the Bornite deposit. As stated previously,

the spacing of these holes was considered too far apart to support the generation of additional

mineral resource estimates at that time, and as a result, the estimate of copper mineral

resources remained unchanged in the June 2018 report from those reported in the previous

technical report dated April 2016. However, the June 2018 technical report did include, for the

first time, an estimate of cobalt mineral resources for the Bornite Project.

In the summer of 2018, Trilogy Metals conducted a drilling progr am on the Bornite property

Tonnes

(million)

Average

Grade Cu (%)

Contained

Metal Cu

(Mlbs)

Tonnes

(million)

Average

Grade Cu (%)

Contained

Metal Cu

(Mlbs)

Indicated In-Pit 0.5 41.7 1.04 955 40.5 1.02 913

Inferred In-Pit 0.5 93.9 0.98 2,034 84.1 0.95 1,768

Inferred Below-Pit 1.5 50.3 2.97 3,292 57.8 2.89 3,683

Inferred 144.1 1.68 5,326 141.9 1.74 5,450Total Inferred

Cut-off

(Cu %)TypeClass

December 2021 June 2018

6 Trust | Respect | Integrity

that included the completion of 12 holes totaling 10,123 meters that, in part, filled the gaps in

previous drilling in the northern, down-dip part of the deposit.

In the summer of 2019, another drilling program , totaling 7,610 metres, was conducted on

the property comprising eight holes that tested the continuity of the mineralization within the

Bornite deposit and two holes that tested exploration targets located about 1 km south and

southeast of the deposit.

Database and Methodology

The project database comprises a total of 273 diamond drill (core) holes totaling 106,406

meters, including 203 holes that targeted the Ruby Zone to the west and 58 holes that targeted

the South Reef area to the east. The remaining 12 holes in the database were exploratory in

nature and tested for satellite mineralization proximal to the Bornite deposit or represent holes

that encountered problems and were therefore abandoned. The database contains a total of

39,740 samples that were analyzed for copper content and 34,177 samples that were analyzed

for cobalt content. Most holes were drilled by Trilogy Metals, plus a few select historical holes

drilled by Kennecott Mines Company, containing additional analyses for elements such as zinc,

lead, gold, silver, and cobalt . At this time, only copper and cobalt show any significant

economic potential, and the others were excluded from the estimation of mineral resources.

Grade estimates are made into model blocks measuring 5m x 5m x 5m, using ordinary kriging

with sample data composited to 2-meter intervals. The copper and cobalt resource models

were validated using a combination of a visual review and statistical comparisons with models

generated using other estimation methods. The effects of potentially anomalous high grade

sample data were controlled using a combination of traditional top cutting as well as restricting

the distance of influence during block grade interpolation. Copper and cobalt resources in the

Inferred category occur within a maximum distance of 100 meters from a drill hole and exhibit

reasonable confidence in the grade and continuity of mineralization. Copper resources included

in the Indicated category are considered am enable to open -pit extraction methods and are

delineated with holes spaced at a maximum distance of 75 meters. Note that there is less

available cobalt sample data and, as a result, none of the cobalt mineral resource is included

in the Indicated category. A portion of the mineral resource has been constrained within a pit

shell generated based on the copper content in the model using a copper price of US$3.50/lb,

mining operating costs of US$3.00/tonne, processing costs of US$11.00/tonne and G&A costs

of US$5.00/tonne, copper process recovery of 87% and a pit slope of 45 degrees. Mineral

resources located below the pit shell are based on an assumed mining cost of US$65.00/tonne

and exhibit the continuity and thickness to be considered amenable to underground extraction

methods such as longhole stoping and cut-and-fill mining. It is assumed that extraction from

the Bornite deposit is based on the copper content in the rocks and t hat cobalt would be a

secondary contributor to the potential economic viability of the deposit. As a result, both copper

and cobalt mineral resource estimates are defined based on a copper cut-off grade threshold.

Location and Distribution of Mineral Resources

The location of the Bornite Project is shown in Figure 2. The distribution of open pit and

underground mineral resources at the South Reef and Ruby Zone are shown in Figures 3 and

4.

7 Trust | Respect | Integrity

Figure 2. Location of the Arctic and Bornite Projects within the UKMP

8 Trust | Respect | Integrity

Figure 3. Perspective View Looking Northwest of Mineral Resources at Bornite

Figure 4. Perspective View Looking Southwest of Mineral Resources at Bornite