Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TLO.TO ·

US EV Battery Supply Chain: Talon Metals Announces Record Grades Drilled at Tamarack Nickel Project in Minnesota 4.44 Meters of 14.08% Nickel Equivalent (37.56% Copper Equivalent)

Drill Results

US EV Battery Supply Chain: Talon Metals

Announces Record Grades Drilled at

Tamarack Nickel Project in Minnesota

4.44 Meters of 14.08% Nickel Equivalent (37.56% Copper

Equivalent)

Tamarack, Minnesota--(Newsfile Corp. - September 13, 2021) - Talon Metals Corp. (TSX:

TLO) ("

Talon

" or the "

Company

") is pleased to provide an update on the Tamarack Nickel-Copper-

Cobalt Project ("

Tamarack Nickel Project

"), located in Minnesota, USA.

Figure 1: 4.44 Meters (14.6 feet) of mixed and massive nickel-copper mineralization in drill hole

21TK0330 assaying 7.97% Ni, 11.25% Cu (14.08% NiEq or 37.56% CuEq) drilled outside of the

Tamarack Nickel Project's resource area in the CGO West area.

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/2443/96269_e0ad4b31a4ea29b9_001full.jpg

HIGHLIGHTS

Assay results from three (3) additional drill holes in the CGO West area (outside of the Tamarack

Nickel Project's resource area):

Drill hole 21TK0330 intersected

4.44 meters (14.6 feet)

of mixed and massive nickel-copper

mineralization

grading 7.97% Ni, 11.25% Cu (14.08% NiEq

1

or 37.56% CuEq

2

)

starting at

only 269.13 meters.

This represents

the highest nickel and copper grades ever assayed at the Tamarack

Nickel Project.

Figure 2: Example of high-grade massive sulphide grading 12.1% Ni, 16.15% Cu (19.35% NiEq

or 51.61% CuEq) (Drill hole 21TK0330).

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/2443/96269_e0ad4b31a4ea29b9_002full.jpg

Table 1: Assays Results from Drill Hole 21TK0330

Drill hole

#

From

(m)

To

(m)

Length

(m)

Ni

(%)

Cu

(%)

Co

(%)

Pd

(g/t)

Pt

(g/t)

Au

(g/t)

NiEq

(%)

CuEq

(%)

21TK0330

269.13

273.57

4.44

7.97

11.25

0.09

2.72

3.21

2.98

14.08

37.56

including

270.20

271.63

1.43

11.29

16.33

0.14

3.23

2.90

1.62

19.08

50.90

including

270.20

270.91

0.71

12.1

16.15

0.16

3.25

1.18

1.21

19.35

51.61

*See Table 2 for further technical and other information

Drill hole 21TK0317 intersected

5.23 meters (17.2 feet)

of mixed and massive nickel-copper

mineralization

grading 5.29% Ni, 2.13% Cu (6.36% NiEq or 16.97% CuEq)

starting at only

247.97 meters.

Drill hole 21TK0323 intersected

13.25 meters (43.5 feet)

of mixed and massive nickel-copper

mineralization

grading 3.97% Ni, 1.48% Cu (4.82% NiEq or 12.85% CuEq)

starting at only

190.75 meters.

Drilling remains ongoing to further expand this enriched high-grade zone of nickel-copper

mineralization within the CGO West area.

"Grade is 'king' in mining, and our recent drill results of 8% to 12% nickel and 11% to 16% copper

could be a king maker,"

said Brian Goldner, Vice President of Exploration.

Goldner continued:

"Not

only are we proving a new dimension of the Tamarack Intrusive Complex with these best-ever drill

results at the newly discovered CGO West location, but we are also showing that the mineralization is

shallow and large scale.

The more we drill, the more we understand how the Tamarack Nickel Project

can be a vital source of strength for the US EV battery supply chain."

SUMMARY

The CGO West area lies approximately 100 meters north-north-east of the Tamarack Nickel Project's

resource area and extends for an additional 400 meters where drilling shows the presence of shallow,

high-grade nickel-copper mineralization.

Talon has previously reported 18 drill holes within the CGO

West area, all of which have intersected nickel-copper mineralization. The thick intersections of mixed

and massive sulphides are found at the base of the overlying Fine-grained Orthocumulate (

"FGO"

) and

Coarse-grained Orthocumulate (

"CGO"

) intrusions where they appear to form 'pools' of nickel and

copper rich sulphides (see Figures 4 and 5).

Drill hole 21TK0313 (which represents the initial 'discovery hole' in the CGO West area) was drilled to

test a Bore Hole Electromagnetic (geophysical) anomaly and successfully intersected

13.92 meters

(45.7 feet)

of mixed and massive nickel-copper sulphide mineralization at 225.44 meters depth

assaying

5.54% Ni, 2.14% Cu, 0.16% Co, 0.21 g/t Pd, 0.26 g/t Pt and 0.08 g/t Au (6.70% NiEq or

17.86% CuEq)

(see the Company's press release dated July 6, 2021).

Following drill hole 21TK0313, Talon's normal practice of utilizing Bore Hole Electromagnetic surveying

continued to identify new electromagnetic anomalies in the CGO West area, which resulted in the mixed

and massive nickel-copper mineralization to be further expanded.

Results of that follow-up drilling have

been reported in the Company's press releases dated July 6, 2021 and August 5, 2021.

Today, the Company is pleased to announce the following new drill hole assays within the CGO West

area:

Drill hole 21TK0330 intersected

4.44 meters (14.6 feet)

of mixed and massive nickel-copper

mineralization

grading 7.97% Ni, 11.25% Cu, 0.09% Co, 2.72 g/t Pd, 3.21 g/t Pt and 2.98 g/t

Au (14.08% NiEq or 37.56% CuEq)

starting at only 269.13 meters.

Drill hole 21TK0317 intersected

5.23 meters (17.2 feet)

of mixed and massive nickel-copper

mineralization

grading 5.29% Ni, 2.13% Cu, 0.13% Co, 0.17g/t Pd, 0.17 g/t Pt and 0.08 g/t Au

(6.36% NiEq or 16.97% CuEq)

starting at only 247.97 meters.

In addition, drill hole 21TK0317 also intersected 9.74 meters (32.0 feet) grading 0.71% Ni,

0.46% Cu, 0.02% Co, 0.09 g/t Pd, 0.13 g/t Pt and 0.08 g/t Au (0.96% NiEq or 2.57 % CuEq)

starting at 212.21 meters.

Drill hole 21TK0323 intersected

13.25 meters (43.5 feet)

of mixed and massive nickel-copper

mineralization

grading 3.97% Ni, 1.48% Cu, 0.12% Co, 0.22 g/t Pd, 0.28 g/t Pt and 0.10 g/t Au

(4.82% NiEq or 12.85% CuEq)

starting at only 190.75 meters.

The mineralization in drill hole 21TK0330 is deeper than the large 'pool' of massive sulphide

mineralization previously reported in the CGO West area (although still considered shallow), a fact that

may be related to its very high metal grades.

Upon first inspection of the drill core from drill hole 21TK0330, Talon's geologists immediately

recognized that it contained an unusually large amount of nickel and copper sulphide minerals, but very

little iron sulphide minerals. The extremely high grades assayed in the mixed and massive sulphide

mineralization are thought to be the result of the nickel and copper sulphides separating from the iron

sulphides.

This natural process of enrichment can occur where the molten sulphide minerals cool slowly

over time, which allows the nickel and copper sulphides to drain away from the main pool before finally

solidifying.

In this case, the enriched liquid sulphides appear to have flowed downward at a steep angle

similar to the way water falls from the edge of a pool.

Multiple new Borehole Electromagnetic (geophysical) anomalies suggest that the enriched sulphides at

depth in drill hole 21TK0330 may extend laterally (see Figure 3) and potentially to greater depths. Drill

testing of these anomalies to expand the high-grade enriched sulphide zone is planned.

The results reported today, combined with those from past press releases show that the CGO West area

has the following exciting characteristics:

High Grades

- The new assays from drill hole 21TK0330 have the highest interval of nickel and

copper grades ever found anywhere within the 18 km Tamarack Intrusive Complex.

Combined with

the assays reported for drill holes 21TK0313, 21TK0317, and 21TK0323, the Company is seeing

widespread high grades of nickel and copper over long sections of core that demonstrate the large

volume of nickel and copper within the CGO West area.

Size

- The size of the CGO West area's 'pool' of sulphides continues to increase as new holes are

drilled. There is 125 meters of distance between drill holes 21TK0316 and 21TK0323 (see Figure

3).

Between these two holes are 5 additional drill holes that have also intersected thick massive

and mixed massive sulphides and demonstrate the potential for continuity of the large pool of high-

grade sulphides over a large area.

Favorable Location

- The high-grade sulphide 'pool' is at shallow depths and lies up slope from

the Tamarack Nickel Project's resource area. Consequently, it is expected to be mined near the

beginning of the mine life, resulting in early cash flows.

Potential to Grow

- Talon has not yet found the edges of this 'pool' of massive sulphide.

New

Borehole Electromagnetic (geophysical) anomalies have been recorded, which suggest additional

nickel-copper mineralization within the CGO West area. These anomalies will be tested with

drilling soon.

Figure 3: Plan view geological map showing in green the 3 new drill holes within in the CGO

West area.

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/2443/96269_e0ad4b31a4ea29b9_003full.jpg

Figure 4: Section A represents a portion of the CGO West area looking east showing the thick

intersections of nickel-copper mineralization found in drill holes 21TK0313 and 21TK0317.

To view an enhanced version of Figure 4, please visit:

https://orders.newsfilecorp.com/files/2443/96269_e0ad4b31a4ea29b9_004full.jpg

Figure 5: Section B represents a portion of the CGO West area looking east showing the thick

intersections of nickel-copper mineralization found in drill holes 21TK0326, 21TK0328 and

21TK0330.

To view an enhanced version of Figure 5, please visit:

https://orders.newsfilecorp.com/files/2443/96269_e0ad4b31a4ea29b9_005full.jpg

Table 2: Assay Results of Drill Holes 21TK0317, 21TK0323 and 21TK0330

Drill hole

#

From

(m)

To

(m)

Length

(m)

Ni

(%)

Cu

(%)

Co

(%)

Pd

(g/t)

Pt

(g/t)

Au

(g/t)

NiEq

(%)

CuEq

(%)

21TK0317

212.21

221.95

9.74

0.71

0.46

0.02

0.09

0.13

0.08

0.96

2.57

and

247.97

253.20

5.23

5.29

2.13

0.13

0.17

0.17

0.08

6.36

16.97

21TK0323

190.75

204.00

13.25

3.97

1.48

0.12

0.22

0.28

0.10

4.82

12.85

including

195.00

198.36

3.36

5.84

2.22

0.18

0.39

0.45

0.14

7.13

19.01

including

200.50

202.77

2.27

4.80

1.77

0.15

0.16

0.21

0.15

5.79

15.45

21TK0330

269.13

273.57

4.44

7.97

11.25

0.09

2.72

3.21

2.98

14.08

37.56

including

270.20

271.63

1.43

11.29

16.33

0.14

3.23

2.90

1.62

19.08

50.90

including

270.20

270.91

0.71

12.1

16.15

0.16

3.25

1.18

1.21

19.35

51.61

Length refers to drill hole length and not True Width.

True Width is unknown at the time of publication.

All samples were analysed by ALS Minerals.

Nickel, copper, and cobalt grades were first analysed by a 4-acid digestion and ICP AES (ME-MS61).

Grades reporting greater than 0.25% Ni and/or 0.1% Cu, using ME-MS61, trigger a sodium peroxide fusion with ICP-AES finish (ICP81).

Platinum,

palladium and gold are initially analyzed by a 50g fire assay with an ICP-MS finish (PGM-MS24).

Any samples reporting >1g/t Pt or Pd trigger an over-

limit analysis by ICP-AES finish (PGM-ICP27) and any samples reporting >1g/t Au trigger an over-limit analysis by AAS (Au-AA26).

NiEq% = Ni%+ Cu% x $3.00/$8.00 + Co% x $12.00/$8.00 + Pt [g/t]/31.103 x $1,300/$8.00/22.04 + Pd [g/t]/31.103 x $700/$8.00/22.04 + Au [g/t]/31.103

x $1,200/$8.00/22.04

CuEq% = Cu%+ Ni% x $8.00/$3.00 + Co% x $12.00/$3.00 + Pt [g/t]/31.103 x $1,300/$3.00/22.04 + Pd [g/t]/31.103 x $700/$3.00/22.04 + Au

[g/t]/31.103 x $1,200/$3.00/22.04

No adjustments were made for recovery or payability.

Table 3: Collar Locations of CGO West Area Drill Holes 21TK0317, 21TK0323 and 21TK0330

Drill Hole (#)

Easting (m)

Northing

(m)

Elevation

(masl)

Azimuth

Dip

End Depth

(m)

21TK0317

491077.0

5169038.0

388.0

305.6

-59.7

292.6

21TK0323

491077.7

5169039.1

388.5

358.8

-72.0

249.3

21TK0330

491009.0

5168962.0

388.0

16.4

-60.0

301.8

Collar coordinates are UTM Zone 15N, NAD83.

Azimuths and dips are taken from survey record at collar unless otherwise noted.

QUALITY ASSURANCE, QUALITY CONTROL AND QUALIFIED PERSONS

Please see the technical report entitled "NI 43-101 Technical Report Updated Preliminary Economic

Assessment (PEA) #3 of the Tamarack North Project - Tamarack, Minnesota" with an effective date of

January 8, 2021 prepared by independent "Qualified Persons" (as that term is defined in National

Instrument 43-101 (

"NI 43-101"

) Leslie Correia (Pr. Eng),

Andre-Francois Gravel (P. Eng.), Tim Fletcher

(P. Eng.), Daniel Gagnon (P. Eng.), David Ritchie (P. Eng.), Oliver Peters (P. Eng.), Volodymyr

Liskovych (P.Eng.), Andrea Martin (P. E.) and Brian Thomas (P. Geo.) for information on the QA/QC,

analytical and testing procedures at the Tamarack Project. Copies are available on the Company's

website (

www.talonmetals.com

) or on SEDAR at (

www.sedar.com

). The laboratory used is ALS

Minerals who is independent of the Company.

Lengths are drill intersections and not necessarily true widths. True widths cannot be consistently

calculated for comparison purposes between holes because of the irregular shapes of the mineralized

zones. Drill intersections have been independently selected by Talon. Drill composites have been

independently calculated by Talon. The geological interpretations in this news release are solely those of

the Company.

The locations and distances highlighted on all maps in this news release are approximate.

Dr. Etienne Dinel, Vice President, Geology of Talon, is a Qualified Person within the meaning of NI 43-

101. Dr. Dinel is satisfied that the analytical and testing procedures used are standard industry operating

procedures and methodologies, and he has reviewed, approved and verified the technical information

disclosed in this news release, including sampling, analytical and test data underlying the technical

information.

ABOUT TALON

Talon is a TSX-listed base metals company in a joint venture with

Rio Tinto

on the high-grade

Tamarack

Nickel-Copper-Cobalt Project

located in Minnesota, USA, comprised of the Tamarack North Project and

the Tamarack South Project. Talon has an earn-in to acquire up to 60% of the Tamarack Project. The

Tamarack Project comprises a large land position (18km of strike length) with numerous high-grade

intercepts

outside the current resource area

. Talon is focused on expanding its current high-grade nickel

mineralization resource prepared in accordance with NI 43-101; identifying additional high-grade nickel

mineralization; and developing a process to potentially produce nickel sulphates responsibly for

batteries for the electric vehicles industry. Talon has a well-qualified exploration and mine management

team with extensive experience in project management.

For additional information on Talon, please visit the Company's website at

www.talonmetals.com

or

contact:

Sean Werger

President

Talon Metals Corp.

Tel: (416) 361-9636 x102

Email:

[email protected]

FORWARD-LOOKING STATEMENTS

This news release contains certain "forward-looking statements". All statements, other than statements

of historical fact that address activities, events or developments that the Company believes, expects or

anticipates will or may occur in the future are forward-looking statements. These forward-looking

statements reflect the current expectations or beliefs of the Company based on information currently

available to the Company. Such forward-looking statements include statements relating to the timing and

results of the exploration program, including assay results, grades, geophysical results and drilling plans;

the potential for pools of sulphides in the CGO West area; the timing of mining and cash flows.

Forward-

looking statements are subject to significant risks and uncertainties and other factors that could cause

the actual results to differ materially from those discussed in the forward-looking statements, and even if

such actual results are realized or substantially realized, there can be no assurance that they will have the

expected consequences to, or effects on the Company.