Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TLO.TO ·

Talon Metals Reports New Assays and Step- Out Drilling Results Drill hole 25TK0563 Intercepted 8.85 Meters of Mineralization Starting at 774.40 meters, Grading 9.60% Ni, 12.65% Cu, 0.09% Co, 11.44g/t Pd+Pt and 11.12 g/t Au (20.96% NiEq or 41.43% CuEq)

Drill Results

Talon Metals Reports New Assays and Step-

Out Drilling Results

Drill hole 25TK0563 Intercepted 8.85 Meters of Mineralization Starting at 774.40 meters, Grading

9.60% Ni, 12.65% Cu, 0.09% Co, 11.44g/t Pd+Pt and 11.12 g/t Au (20.96% NiEq or 41.43% CuEq)

Step-Out Drilling Further Confirms Massive Sulphide Continuity and Intercepts Mixed Massive

Sulphides Approximately 79 Meters Below the Tamarack Resource Area

Tamarack, Minnesota--(Newsfile Corp. - February 4, 2026) - Talon Metals Corp. (TSX: TLO) (OTCID:

TLOFD) (

"Talon"

or the

"Company"

) is pleased to report successful step-out drill holes in the Vault

Zone of the Tamarack Nickel-Copper-Cobalt Project in Minnesota (the "

Tamarack Nickel-Copper

Project

"), as well as new assay results

.

Highlights

Figure 1: Drill hole 25TK0563B, drilled 16 meters to the northwest of drill hole 25TK0563

intercepted 8.85 meters of Massive Sulphide Unit mineralization starting at 774.40 meters

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_001full.jpg

As outlined in the Company's

June 5, 2025

press release, drill hole

25TK0563

intercepted a combined

34.9 meters

of Massive Sulphide Unit ("

MSU

") mineralization grading 28.88% NiEq and 57.76% CuEq

starting at

762.34

meters

. Talon is pleased to report that drill hole

25TK0563B

, drilled 16 meters to the

northwest of drill hole

25TK0563

, intercepted

8.85 meters of MSU

starting at

774.40 meters

, which

assayed

9.60% Ni, 12.65% Cu, 0.09% Co, 11.44g/t Pd+Pt and 11.12 g/t Au (20.96% NiEq or

41.43% CuEq)

with full results as follows in Table 1.

Table 1: Assays for drill hole 25TK0565B

Drill Hole #

From

(m)

To

(m)

Length

(m)

Assay

NiEq

(%)

CuEq

(%)

Ni

(%)

Cu

(%)

Co

(%)

Pd

(g/t)

Pt

(g/t)

Au

(g/t)

Ag

(g/t)

25TK0563B

774.40

783.25

8.85

9.60

12.65

0.09

4.61

6.83

11.12

60.87

20.96

41.43

including

776.49

782.82

6.33

12.91

16.55

0.11

5.99

8.57

13.59

79.36

27.28

54.56

Please refer to Table 3 for further technical information

New drill hole 25TK0563C

, drilled

16 meters

to the

southwest

of drill hole

25TK0563

, intercepted

8.26

meters

of

MSU and Mixed Massive Sulphides ("MMS")

(assays pending) at the same

stratigraphic horizon as the upper part of drill hole

25TK0563

and at a similar depth to drill hole

25TK0563B

, starting at

773.95

meters (see Figure 2).

Figure 2: Drill hole 25TK0563C, drilled 16 meters to the southwest of drill hole 25TK0563

intercepted 8.26 meters of MMS/MSU starting at 773.95 meters

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_002full.jpg

As outlined in the Company's

December 11, 2025

press release, drill hole

25TK0565

, located

103

meters

below drill hole 12TK0153C (see the November 2022 Technical Report for further details on drill

hole 12TK0153C) within the Tamarack Resource Area, intercepted

19.11

meters of MMS

grading

6.39% NiEq (11.67% CuEq)

starting at

670.00

meters, and

3.22

meters

grading

9.90% NiEq

(17.40% CuEq)

starting at

703.65 meters

(see Figure 3).

Figure 3: Drill hole 25TK0565, located 103 meters below drill hole 12TK0153C within the

Tamarack Resource Area intercepted 19.11 meters of MMS grading 6.39% NiEq (11.67% CuEq)

starting at 670.00 meters, and 3.22 meters grading 9.90% NiEq (17.40% CuEq) starting at

703.65 meters

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_003full.jpg

Talon is pleased to announce that new drill hole

25TK0567

, located

79

meters

below drill hole

12TK0153C within the

Tamarack Resource Area

intercepted a total of

35 meters of MMS

starting at

645.26 meters

(assays pending) (see Figure 4), located

27 meters

above the MMS intercepted in drill

hole

25TK0565.

Figure 4: Drill hole 25TK0567 intercepted a total of 35 meters of MMS starting at 645.26 meters,

located 27 meters above the MMS intercepted in drill hole 25TK0565

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_004full.jpg

Borehole Electromagnetic (

"BHEM"

) data continues to indicate high conductivity at multiple levels

where MSU and MMS mineralization has been intercepted. Talon's three in-house drill rigs are actively

drilling the Vault Zone with the goal of continuing to expand mineralization.

"W

ith the transaction with Lundin Mining now complete, our combined team is positioned to advance

our four strategic priorities in parallel working to materially extend the Eagle Mine life, accelerating

exploration in Michigan and Minnesota, advancing permitting at the Tamarack Nickel-Copper Project

and the Beulah Battery Minerals Processing Facility, and progressing engineering toward feasibility

study and construction-at a time when it is vitally important to drive decisively toward U.S. critical

minerals self-sufficiency

," said Darby Stacey, Talon's new CEO.

"Our methodical approach of focusing on Borehole Electromagnetic anomalies coupled with precision

drilling has continued to deliver success within the Vault Zone since the Talon drill rigs returned to the

Tamarack Nickel-Copper Project. The new assay results continue to demonstrate the consistency and

continuity of massive sulphide mineralization at the Vault Zone,"

said Brian Goldner, Talon's Chief

Exploration Officer.

New Successful MSU Step-out: Drill Hole 25TK0563C

New drill hole

25TK0563C

(see Figure 2) intercepted

8.26 meters

of

MMS and MSU

mineralization

starting at

773.95 meters

. This intercept, located

15 meters south

of drill hole

25TK0563B

, represents

a

16-meter step-out

to the southwest of the upper part of discovery drill hole

25TK0563.

Mineralization remains open in all directions

, and additional drill holes are planned

to the north

and to the east of drill hole 25TK0563

(see Figure 5).

Figure 5: Plan view and cross section of drill holes 25TK0563, 25TK0563B and 25TK0563C

with step out drill holes planned to the north and the east

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_005full.jpg

New MMS Intercepted in the Stringer Part of the Vault Zone Starting 79 Meters Below the

Tamarack Resource Area: Drill Hole 25TK0567

Following the MMS intercepts in drill hole 25TK0565 that intercepted 19.11 meters of MMS grading

6.39% NiEq (11.67% CuEq) starting at 670.00 meters, and 3.22 meters grading 9.90% NiEq (17.40%

CuEq) starting at 703.65 meters, located 103 meters below drill hole 12TK0153C within the Tamarack

Resource Area (see Figure 3), new drill hole 25TK0567 intercepted 35 meters of MMS starting at

645.26 meters. The MMS mineralization in drill hole 25TK0567 located in the Stringer part of the Vault

Zone starts approximately 79 meters below drill hole 12TK0153C and ends approximately 27 meters

above the start of the MMS intercepted in drill hole 25TK0565.

MMS Stringers are defined by massive

sulphide veinlets occurring in discontinuous, usually short, narrow and irregular veins within the host rock

indicating fluid (sulphides) pathways.

The MMS intercepted in drill holes 25TK0565 and 25TK0567 are consistent with a near-vertical

mineralized structure hosted within meta-sedimentary rocks adjacent to the Tamarack Intrusive Complex.

Combined, drill holes 25TK0565 and 25TK0567, which are approximately 5 meters apart, demonstrate

vertical continuity of MMS over approximately 43 meters (see Figure 6).

Figure 6: Drill holes 25TK0565 and 25TK0567 with MMS mineralization starting at 79 meters

below the Tamarack Resource Area and continuing for approximately 43 meters (combined)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_006full.jpg

Figure 7: Conceptual cross-section of the Vault Zone, showing new drill hole 25TK0567

relative to drill hole 25TK0565 within the MMS Stringer part of the Vault Zone, and new drill hole

25TK0563C relative to discovery drill hole 25TK0563 and drill hole 25TK0563B.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/282633_9468c00014578a4e_007full.jpg

Next Steps: Continuation of Vault Zone Expansion and Delineation

Talon's in-house exploration team continues to rapidly advance step-out drilling, guided by BHEM data,

to expand the Vault Zone mineralization both laterally and at depth. With mineralization remaining open

in all directions, Talon is also planning additional geological drill holes beyond the current reach of

BHEM to test for further extensions of the system.

For further discussion on the Vault Zone, please see

www.talonmetals.com/media

.

QUALITY ASSURANCE, QUALITY CONTROL AND QUALIFIED PERSONS

The Talon sample preparation, security, and Quality Assurance ("

QA

") / Quality Control ("

QC

") protocols

for the Tamarack Nickel-Copper Project are consistent with industry best practices and Canadian

Institute of Mining, Metallurgy and Petroleum Mineral Exploration Best Practice Guidelines (November

2018).

Talon has implemented documented QA programs that incorporate written procedures, acceptable

industry software, database organization, and standardized data presentation, all of which contribute to

confidence in the integrity of the dataset. The QC protocol has been documented (see also the

November 2022 Technical Report) and consistently applied since Talon's involvement with the Tamarack

Nickel-Copper Project.

The QA/QC program is based on the systematic insertion of certified reference materials ("CRM"),

including a variety of standards, blanks (materials containing no economic minerals), and duplicate

samples, which are used to monitor contamination, precision, and analytical accuracy at the primary

assay laboratory and to prevent inaccurate data from being accepted into the assay database. Samples

are submitted in batches of approximately 250 samples. Within each batch, QA/QC materials are

inserted at a rate of approximately one QA/QC sample for every ten core samples, including CRM

standards inserted at the front end of massive sulphide mineralization, blanks inserted immediately

following massive sulphide mineralization, and duplicate samples inserted approximately every 10

samples.

Sample security and chain-of-custody procedures are maintained throughout the sampling and analytical

process. Core samples are prepared and stored in a secure facility prior to shipment. Samples are

placed into plastic bins or sealed totes, which are secured using tamper-evident security tags. Before

sealing, a chain-of-custody form is placed inside each container. The containers are transported from

the core facility to the ALS laboratory in Thunder Bay, Ontario for preparation, and are subsequently

shipped to ALS Laboratories in Vancouver, British Columbia for analysis, where the chain-of-custody

documentation is signed by laboratory personnel and returned to Talon upon receipt, confirming sample

integrity.

Please see the technical report entitled "November 2022 National Instrument 43-101 Technical Report of

the Tamarack North Project - Tamarack, Minnesota" with an effective date of November 2, 2022

("

November 2022 Technical Report

") prepared by independent "Qualified Persons" (as that term is

defined in National Instrument 43-101 ("

NI 43-101

")) Brian Thomas (P. Geo), Roger Jackson (P. Geo),

Oliver Peters (P. Eng) and Christine Pint (P.G) for further information on the QA/QC, data verification,

analytical and testing procedures at the Tamarack Nickel Copper Project. Copies are available on the

Company's website (

www.talonmetals.com

) or on SEDAR+ at (

www.sedarplus.ca

). The laboratory used

is ALS Minerals who is independent of the Company.

Lengths are drill intersections and not necessarily true widths. True widths cannot be consistently

calculated for comparison purposes between holes because of the irregular shapes of the mineralized

zones. Drill intersections have been independently selected by Talon. Drill composites have been

independently calculated by Talon. The geological interpretations in this news release are solely those of

the Company. The locations and distances highlighted on all maps in this news release are approximate.

Dr. Etienne Dinel, Vice President, Geology of Talon, is a Qualified Person within the meaning of NI 43-

101. Dr. Dinel is satisfied that the analytical and testing procedures used are standard industry operating

procedures and methodologies, and he has reviewed, approved and verified the technical information

disclosed in this news release, including sampling, analytical and test data underlying the technical

information.

Where used in this news release:

NiEq% = Ni% + Cu% x $4.00/$8.00 x Cu Recovery/Ni Recovery + Co% x $20.00/$8.00 x Co

Recovery/Ni Recovery + Pt [g/t]/31.103 x $1,000/$8.00/22.04 x Pt Recovery/Ni Recovery + Pd

[g/t]/31.103 x $1,000/$8.00/22.04 x Pd Recovery/Ni Recovery + Au [g/t]/31.103 x $2,000/$8.00/22.04 x

Au Recovery/Ni Recovery + Ag [g/t]/31.103 x $20.00/$8.00/22.04 x Ag Recovery/Ni Recovery

CuEq% = Cu%+ Ni% x $8.00/$4.00 x Ni Recovery/Cu Recovery + Co% x $20.00/$4.00 x Co

Recovery/Cu Recovery + Pt [g/t]/31.103 x $1,000/$4.00/22.04 x Pt Recovery/Cu Recovery + Pd

[g/t]/31.103 x $1,000/$4.00/22.04 Pd Recovery/Cu Recovery + Au [g/t]/31.103 x $2,000/$4.00/22.04 Au

Recovery/Cu Recovery + Ag [g/t]/31.103 x $20.00/$4.00/22.04 x Ag Recovery/Cu Recovery

For Ni and Cu recoveries, please refer to the formulae in the November 2022 Technical Report.

Recovery of Ni to the Cu concentrate was excluded from the NiEq calculation. The following recoveries

were used for the other metals: 64.1% for Co, 82.5% for Pt, 69.3% for Pd and 72.6% for Au and Ag.

ABOUT TALON

Talon is a TSX-listed base metals company advancing and operating high-grade nickel-copper assets

in the United States, including 100% ownership of the Eagle Mine and Humboldt Mill in Michigan, the

only primary nickel mine currently operating in the United States, and the

Tamarack Nickel-Copper-

Cobalt Project

in Minnesota. Talon is in a joint venture with

Rio Tinto

on the high-grade Tamarack Nickel-

Copper-Cobalt Project located in central Minnesota. Talon's shares are also traded in the US over the

OTC market under the symbol TLOFD. The Tamarack Nickel-Copper-Cobalt Project comprises a large

land position (18km of strike length) with additional high-grade intercepts

outside the current resource

area

. Talon has an earn-in right to acquire up to 60% of the Tamarack Nickel-Copper-Cobalt Project and

currently owns 51%. Talon has a

neutrality and workforce development agreement

in place with the

United Steelworkers union. Talon's Beulah Mineral Processing Facility in Mercer County was

selected by

the US Department of Energy

for US$114.8 million funding grant from the Bipartisan Infrastructure Law

and the

US Department of War awarded Talon a grant of US$20.6 million

to support and accelerate

Talon's exploration efforts in both Minnesota and Michigan. Talon has well-qualified and experienced

exploration, mine permitting, mine development, operations and community relations teams.

For additional information on Talon, please visit the Company's website at

www.talonmetals.com

or

contact:

Media Contact:

Jessica Johnson

(218) 460-9345

[email protected]

Investor Contact:

Mike Kicis

1 (647) 968-0060

[email protected]

FORWARD-LOOKING STATEMENTS

This news release contains certain "forward-looking statements". All statements, other than statements

of historical fact that address activities, events or developments that the Company believes, expects or

anticipates will or may occur in the future are forward-looking statements. These forward-looking

statements reflect the current expectations or beliefs of the Company based on information currently

available to the Company. Such forward-looking statements include statements relating to future

exploration work, including future drill holes, drill results, assays, geophysics and geological

interpretations and the potential for a deposit in the Vault Zone. Forward-looking statements are subject

to significant risks and uncertainties and other factors that could cause the actual results to differ

materially from those discussed in the forward-looking statements, and even if such actual results are

realized or substantially realized, there can be no assurance that they will have the expected

consequences to, or effects on the Company.

Any forward-looking statement speaks only as of the date on which it is made and, except as may be

required by applicable securities laws, the Company disclaims any intent or obligation to update any

forward-looking statement, whether as a result of new information, future events or results or otherwise.

Although the Company believes that the assumptions inherent in the forward-looking statements are

reasonable, forward-looking statements are not guarantees of future performance and accordingly undue

reliance should not be put on such statements due to the inherent uncertainty therein.

Table 2: Collar Locations of Drill Holes

Drill Hole #

Easting

(m)

Northing

(m)

Elevation

(masl)

Azm

Dip

End

Depth (m)

25TK0563B

491049.3

5168348.9

388.0

170.4

-85.4

896.7

25TK0563C

491049.3

5168348.9

388.0

170.4

-85.4

879.7

25TK0567

490999.3

5168293.0

388.0

75.7

-87.0

919.3

Collar coordinates are UTM Zone 15N, NAD83.

Azimuths and dips are taken from the survey record at collar unless otherwise noted.

Table 3: Assay Table for Drill Hole 25TK0563B

Drill Hole #

From

(m)

To

(m)

Length

(m)

Assay

NiEq

(%)

CuEq

(%)

Ni

(%)

Cu

(%)

Co

(%)

Pd

(g/t)

Pt

(g/t)

Au

(g/t)

Ag

(g/t)

25TK0563B

774.40

783.25

8.85

9.60

12.65

0.09

4.61

6.83

11.12

60.87

20.96

41.43

including

776.49

782.82

6.33

12.91

16.55

0.11

5.99

8.57

13.59

79.36

27.28

54.56

Length refers to drill hole length and not True Width.

True Width is unknown at the time of publication.

All samples were analysed by ALS Minerals.

Nickel, copper, and cobalt grades were first analysed by a 4-acid digestion and

ICP AES (ME-MS61).

Grades reporting greater than 0.25% Ni and/or 0.1% Cu, using ME-MS61, trigger a sodium peroxide fusion with ICP-AES finish (ICP81). Platinum,

palladium, and gold are initially analyzed by a 30g fire assay with an ICP-MS finish (PGM-MS24). Any samples reporting >1g/t Pt or Pd trigger an over-

limit analysis by ICP-AES finish (PGM-ICP27) and any samples reporting >1g/t Au trigger an over-limit analysis by AAS (Au-AA26). For Ag, ICP-AES

through Aqua regia digestion (ME-ICP 41).

Table 4: Quick Lithology Log for Drill Holes 25TK0563C and 25TK0567

HOLE #

FROM (m)

To (m)

Length

Quick Log

Sulphide texture

25TK0563C

572.26

592.53

CGO

592.53

701.83

CGO

701.83

702.72

SED

702.72

714.12

GAB

714.12

771.47

CGO

771.47

773.95

GAB

773.95

774.98

1.03

MMS

Stringers

774.98

782.21

7.23

MMS/MSU

Massive

782.21

782.52

GAB

782.52

809.10

CGO

809.1

828.94

SED

828.94

879.64

CGO

0

44.96

OB

44.96

418.32

FGO/MZNO

418.32

545.46

127.14

FGO/MZNO

Mod Diss