Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TLO.TO ·

Talon Metals Reports New Assay Results Outside of the Tamarack Resource Area: 9.31% Nickel Equivalent in the Raptor Zone Drilling to date suggests 250 meters of continuous high-grade nickel-copper mineralization in the Raptor Zone

Drill Results

Talon Metals Reports New Assay Results

Outside of the Tamarack Resource Area:

9.31% Nickel Equivalent in the Raptor Zone

Drilling to date suggests 250 meters of continuous high-grade

nickel-copper mineralization in the Raptor Zone

Tamarack, Minnesota--(Newsfile Corp. - January 16, 2024) - Talon Metals Corp. (TSX: TLO) (OTC Pink:

TLOFF) (

"Talon"

or the

"Company"

), the majority owner and operator of the Tamarack Nickel-Copper-

Cobalt Project ("

Tamarack Nickel Project

") in central Minnesota, provides assay results from various

new drill holes within the "Raptor Zone". The Raptor Zone lies to the north of the Company's Resource

Area and represents a new area with the potential for significant exploration upside at the Tamarack

Nickel Project.

Figure 1: 2.2m of 9.31% NiEq intersected in drill hole 23TK0483 at a depth of 653 meters

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/194308_b0672a6cb4cde8eb_001full.jpg

Today's results include a 5.93-meter (19.5 feet) intercept of high-grade massive nickel and copper

mineralization assaying 2.92% Ni and 1.73% Cu (4.09% NiEq), which includes a 2.2-meter (7.2 feet)

intercept of high-grade massive nickel and copper mineralization assaying at 6.84% Ni and 3.80% Cu

(9.31% NiEq). Talon's in-house drilling and geophysics teams continue to grow their understanding of

the high-grade mineralization potential in the Raptor Zone, as the exploration and drilling within the area

progresses into 2024 using Talon's in-house fleet of drill rigs.

Based on drill results to date in the Raptor Zone, drilling suggests a 250-meter strike length of

continuous high-grade massive nickel and copper mineralization within the Raptor's Head (see Figure 3

below).

Summary

The new intercept in drill hole 23TK0483 was targeted from an off-hole borehole electromagnetic

anomaly (geophysics) from previous drill hole 22TK0430 and represents a 91% increase in

thickness of the high-grade nickel and copper mineralization compared to the previously drilled

intercept in hole 22TK0430. These results help demonstrate that with more positive drilling results,

the potential for a new resource from the Raptor Zone has increased.

Of note, the fact that the mineralization appears to be getting thicker is consistent with how the

Company made its previous new high-grade nickel-copper discoveries at the Tamarack Nickel

Project (CGO East and CGO West).

Based on drill results to date in the Raptor Zone, drilling suggests a 250-meter strike length of

continuous high-grade massive nickel and copper mineralization within the Raptor's Head (see

Figure 3 below).

The new drill hole is over 1 km to the north of the Tamarack Nickel Project Resource Area and

represents significant potential for additional high-grade discoveries within the Tamarack Intrusive

Complex.

On September 12, 2023, Talon and the

US Department of Defense announced that Talon received

a grant of US$20.6 million

to support and accelerate Talon's exploration efforts in both Minnesota

and Michigan. Funds from the US Department of Defense will be used to support additional

exploration drilling and geophysical studies in the Raptor Zone.

Talon currently has three drill rigs operating in the Raptor Zone.

Additional drilling is planned

throughout 2024 with the goal of expanding this mineralization in this new and previously untested

area.

Table 1: Highlighted Assay Results (see Table 3 for further technical information)

Drill Hole

From

To

Length

Assay

NiEq (%)

(#)

(m)

(m)

(m)

Ni (%)

Cu (%)

Co (%)

Pd (g/t)

Pt (g/t)

Au (g/t)

23TK0482

294.00

297.97

3.97

0.75

0.55

0.02

0.86

1.54

0.30

1.46

23TK0483

648.24

654.17

5.93

2.92

1.73

0.06

0.73

1.23

0.43

4.09

including

651.97

654.17

2.20

6.84

3.80

0.14

1.64

2.84

0.90

9.31

23TK0485

272.71

272.71

2.82

0.68

0.47

0.02

0.46

0.79

0.22

1.17

Figure 2: Analytical signal geophysical plan map over the Raptor Zone showing new drill hole

locations in green. See press releases dated July 13, 2023 and April 19, 2023 for further

technical information on historical drill holes.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/194308_b0672a6cb4cde8eb_002full.jpg

Figure 3: Illustration of potential for a 250-meter strike length of continuous high-grade nickel

and copper mineralization within the Raptor Zone (Raptor's Head) (looking southeast). See

press releases dated May 28, 2015, July 29, 2015, September 1, 2015,

December 13, 2016, June

21, 2018, April 19, 2023 and July 13, 2023 for further technical information on historical drill

holes.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2443/194308_b0672a6cb4cde8eb_003full.jpg

QUALITY ASSURANCE, QUALITY CONTROL AND QUALIFIED PERSONS

Please see the technical report entitled "November 2022 National Instrument 43-101 Technical Report of

the Tamarack North Project - Tamarack, Minnesota" with an effective date of November 2, 2022

("

November 2022 Technical Report

") prepared by independent "Qualified Persons" (as that term is

defined in National Instrument 43-101 ("

NI 43-101

")) Brian Thomas (P. Geo), Roger Jackson (P. Geo),

Oliver Peters (P. Eng) and Christine Pint (P.G) for information on the QA/QC, data verification, analytical

and testing procedures at the Tamarack Nickel Project. Copies are available on the Company's website

(

www.talonmetals.com

) or on SEDAR at (

www.sedar.com

). The laboratory used is ALS Minerals who is

independent of the Company.

Lengths are drill intersections and not necessarily true widths. True widths cannot be consistently

calculated for comparison purposes between holes because of the irregular shapes of the mineralized

zones. Drill intersections have been independently selected by Talon. Drill composites have been

independently calculated by Talon. The geological interpretations in this news release are solely those of

the Company. The locations and distances highlighted on all maps in this news release are approximate.

Dr. Etienne Dinel, Vice President, Geology of Talon, is a Qualified Person within the meaning of NI 43-

101. Dr. Dinel is satisfied that the analytical and testing procedures used are standard industry operating

procedures and methodologies, and he has reviewed, approved and verified the technical information

disclosed in this news release, including sampling, analytical and test data underlying the technical

information.

Where used in this news release:

NiEq% = Ni% + Cu% x $3.75/$9.50 x Cu Recovery/Ni Recovery + Co% x $25.00/$9.50 x Co

Recovery/Ni Recovery + Pt [g/t]/31.103 x $1,000/$9.50/22.04 x Pt Recovery/Ni Recovery + Pd

[g/t]/31.103 x $1,000/$9.50/22.04 x Pd Recovery/Ni Recovery + Au [g/t]/31.103 x $1,400/$9.50/22.04 x

Au Recovery/Ni Recovery

For Ni and Cu recoveries, please refer to the formulae in the November 2022 Technical Report.

Recovery of Ni to the Cu concentrate was excluded from the NiEq calculation. The following recoveries

were used for the other metals: 64.1% for Co, 82.5% for Pt, 69.3% for Pd and 72.6% for Au.

ABOUT TALON

Talon is a TSX-listed base metals company in a joint venture with

Rio Tinto

on the high-grade

Tamarack

Nickel-Copper-Cobalt Project

located in central Minnesota. Talon's shares are also traded in the US

over the OTC market under the symbol TLOFF. The Tamarack Nickel Project comprises a large land

position (18km of strike length) with additional high-grade intercepts

outside the current resource area

.

Talon has an earn-in right to acquire up to 60% of the Tamarack Nickel Project, and currently owns 51%.

Talon is focused on (i) expanding and infilling its current high-grade nickel mineralization resource

prepared in accordance with NI 43-101 to shape a mine plan for submission to Minnesota regulators,

and (ii) following up on additional high-grade nickel mineralization in the Tamarack Intrusive Complex.

Talon has an agreement with Tesla Inc.

to supply it with 75,000 metric tonnes (165 million lbs) of nickel in

concentrate (and certain by-products, including cobalt and iron) from the Tamarack Nickel Project over

an estimated six-year period once commercial production is achieved. Talon has a

neutrality and

workforce development agreement

in place with the United Steelworkers union. Talon's Battery Mineral

Processing Facility in Mercer County was

selected by the US Department of Energy

for US$114 million

funding grant from the Bipartisan Infrastructure Law and the

US Department of Defense awarded Talon a

grant of US$20.6 million

to support and accelerate Talon's exploration efforts in both Minnesota and

Michigan. Talon has well-qualified experienced exploration, mine development, external affairs and mine

permitting teams.

For additional information on Talon, please visit the Company's website at

www.talonmetals.com

.

Media Contact:

Todd Malan

1-(202)-714-8187

[email protected]

Investor Contact:

Sean Werger

1-(416)-500-9891

[email protected]

FORWARD-LOOKING STATEMENTS

This news release contains certain "forward-looking statements". All statements, other than statements

of historical fact that address activities, events or developments that the Company believes, expects or

anticipates will or may occur in the future are forward-looking statements. These forward-looking

statements reflect the current expectations or beliefs of the Company based on information currently

available to the Company. Such forward-looking statements include statements relating to future

exploration, drilling, assays and the results thereof; the potential for a 250-meter strike length of

continuous high-grade massive nickel and copper mineralization within the Raptor's Head; the potential

for significant exploration upside at the Tamarack Nickel Project; and the potential for additional high-

grade discoveries within the Tamarack Intrusive Complex. Forward-looking statements are subject to

significant risks and uncertainties and other factors that could cause the actual results to differ materially

from those discussed in the forward-looking statements, and even if such actual results are realized or

substantially realized, there can be no assurance that they will have the expected consequences to, or

effects on the Company.

Any forward-looking statement speaks only as of the date on which it is made and, except as may be

required by applicable securities laws, the Company disclaims any intent or obligation to update any

forward-looking statement, whether as a result of new information, future events or results or otherwise.

Although the Company believes that the assumptions inherent in the forward-looking statements are

reasonable, forward-looking statements are not guarantees of future performance and accordingly undue

reliance should not be put on such statements due to the inherent uncertainty therein.

Table 2: Collar Locations of New Drill Holes

Drill Hole (#)

Easting (m)

Northing (m)

Elevation (masl)

Azm

Dip

End Depth (m)

23TK0480

491900.8

5170337.5

388.0

165.7

-75.6

810.8

23TK0482

491686.0

5170936.0

388.0

307.0

-73.0

670.6

23TK0483

491904.6

5170336.2

388.0

211.9

-85.9

734.6

23TK0485

416686.0

5170934.0

388.0

40.0

-60.0

678.6

23TK0490

491904.6

5170335.0

388.0

87.8

-75.3

695.0

Collar coordinates are UTM Zone 15N, NAD83

Azimuths and dips are taken from survey record at collar unless otherwise noted

Table 3: Assay Results from New Drill Holes

Drill Hole

From

To

Length

Assay

NiEq (%)

(#)

(m)

(m)

(m)

Ni (%)

Cu (%)

Co (%)

Pd (g/t)

Pt (g/t)

Au (g/t)

23TK0482

294

297.97

3.97

0.75

0.55

0.02

0.86

1.54

0.30

1.46

23TK0483

648.24

654.17

5.93

2.92

1.73

0.06

0.73

1.23

0.43

4.09

including

651.97

654.17

2.20

6.84

3.80

0.14

1.64

2.84

0.90

9.31

23TK0485

272.71

272.71

2.82

0.68

0.47

0.02

0.46

0.79

0.22

1.17

23TK0490

651.88

653.58

0.64

6.46

2.99

0.17

0.42

0.38

0.45

8.11

23TK0480

no significant mineralization

Length refers to drill hole length and not True Width.

True Width is unknown at the time of publication.

All samples were analysed by ALS Minerals.

Nickel, copper, and cobalt grades were first analysed by a 4-acid digestion and

ICP AES (ME-MS61).

Grades reporting greater than 0.25% Ni and/or 0.1% Cu, using ME-MS61, trigger a sodium peroxide fusion with ICP-AES finish (ICP81).

Platinum,

palladium and gold are initially analyzed by a 50g fire assay with an ICP-MS finish (PGM-MS24).

Any samples reporting >1g/t Pt or Pd trigger an over-

limit analysis by ICP-AES finish (PGM-ICP27) and any samples reporting >1g/t Au trigger an over-limit analysis by AAS (Au-AA26).

NiEq% = Ni% + Cu% x $3.75/$9.50 x Cu Recovery/Ni Recovery + Co% x $25.00/$9.50 x Co Recovery/Ni Recovery + Pt [g/t]/31.103

x $1,000/$9.50/22.04 x Pt Recovery/Ni Recovery + Pd [g/t]/31.103 x $1,000/$9.50/22.04 x Pd Recovery/Ni Recovery + Au [g/t]/31.103

x

$1,400/$9.50/22.04 x Au Recovery/Ni Recovery

For Ni and Cu recoveries, please refer to the formulae in the November 2022 Technical Report. Recovery of Ni to the Cu concentrate

was excluded

from the NiEq calculation.

The following recoveries were used for the other metals: 64.1% for Co, 82.5% for Pt, 69.3% for Pd and 72.6% for Au.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/194308