June 28, 2022 , Montreal, Quebec – Troilus Gold Corp. (TSX: TLG; OTCQX: CHXMF ) (“Troilus” or the

“Company”) is pleased to report excellent metallurgical recovery results for the Southwest Zone as part

of an ongoing pilot plant scale metallurgical testing program on each of the main mineral deposits at its

100%-owned Troilus Project, located in northcentral Quebec, Canada. Approximately 9 tonnes (9,000 kg)

of sample material, ~3 tonnes from the three main mineral zones (Zone Z87, J Zone and Southwest Zone)

were sent to Eriez’s metallurgical test facility in Erie, Pennsylvania, last year to validate the recovery of

gold, copper and silver using standard gravity and column flotation technology . The results of these test

programs will be used to support the upcoming Pre-Feasibility Study, as well as future economic studies.

Southwest Zone Test Program Overview and Results:

 An ~3 tonne (3,000 kg) composite sample of mineralized material from the Southwest Zone,

prepared using coarse assay rejects from the various domains of the entire mineralized zone was

provided to Eriez for testing.

 Overall copper recovery of 93.5%, gold recovery of 88.3%, and silver recovery of 89.4% was

achieved in combined gravity separation and rougher-scavenger-cleaners column flotation, an

industry standard processing method.

 These results are consistent and generally exceed the recoveries used in the Preliminary Economic

Assessment (refer to press release dated August 20, 2020), where the recoveries for copper and

gold were 90% and silver was 40%

Justin Reid, CEO and Director of Troilus Gold, commented, “We are very pleased with the recovery

results from the Southwest Zone, which are consistent with those released a few months ago from the

J Zone. The Southwest Zone is located approximately two kilometres away from the formerly mined

pits and was only discovered about two years ago, so for the metallurgical results from this area to be

in line with previous work and new results from the main zones is very encouraging. ”

On February 28, 2022, Troilus announced excellent metallurgical test results for the J Zone of gold, copper

and silver recoveries of 92.9%, 90.4% and 88.8%, respectively. Ongoing testing is being completed on the

3rd and last sample for Zone Z87 and will be announced once complete.

Qualified Persons

The scientific and technical information contained in this news release has been reviewed and approved

by Joseph C. Milbourne, Registered Member SME, Manager of Technical Services for Troilus Gold Corp.,

who is a Qualified Person within the meaning of NI 43-101.

About Eriez

Established in 1942, Eriez is a global leader in separation technologies used throughout mineral processing

operations for base metals, gold, industrial minerals, coal and oil sands, phosphate and potash.

About Troilus Gold Corp.

Troilus Gold Corp. is a C anadian-based junior mining company focused on the systematic advancement

and de-risking of the former gold and copper Troilus Mine towards production. From 1996 to 2010, the

Troilus Mine produced +2 million ounces of gold and nearly 70,000 tonnes of copper. Troilus is located in

the top-rated mining jurisdiction of Quebec, Canada, where is holds a strategic land position of 1,420 km²

in the Frôtet-Evans Greenstone Belt. Since acquiring the project in 2017, ongoing exploration success has

demonstrated the tremendous scale potential of the gold system on the property with significant mineral

resource growth. The Company is advancing engineering studies following the completion of a robust PEA

in 2020, which demonstrated the potential for the Troilus project to become a top-ranked gold and copper

producing asset in Canada. Led by an experienced team with a track -record of successful mine

development, Troilus is positioned to become a cornerstone project in North America.

For more information:

Caroline Arsenault

VP Corporate Communications

+1 (647) 407-7123

[email protected]

Cautionary Note Regarding Forward-Looking Statements and Information

The PEA is preliminary in nature, includes inferred mineral resources that are considered too speculative

geologically to have the economic considerations applied to them that would enable them to be

categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineral resources

that are not mineral reserves do not have demonstrated economic viability. The PEA is subject to a number

of risks and uncertainties. See below and the Company’s latest technical report available on SEDAR for

more information with respect to the key assumptions, parameters, methods and risks of determination

associated with the foregoing.

This press release contains “forward- looking statements” within the meaning of applicable Canadian

securities legislation. Forward- looking statements include, but are not limited to, statements regarding

the potential impact of the test program on the Company and the likelihood that the results projected,

including without limitation the recoveries, will be realized on the timeline targeted or at all, timing of

future studies including the pre -feasibility study, environmental assessments (including the timing of an

environmental impact study) and development plans, opportunity to expand the scale of the project, the

project becoming a cornerstone mining project in Quebec and Canada; the development potential and

timetable of the project; the estimation of mineral resources; realization of mineral resource estimates;;

the timing and amount of estimated future exploration; cos ts of future activities; capital and operating

expenditures; success of exploration activities; the anticipated ability of investors to continue benefiting

from the Company’s low discovery costs, technical expertise and support from local communities , ; the

timing and amount of estimated future exploration; the anticipated results of the Company’s 20 22 drill

program and their possible impact on the potential size of the mineral resource estimate; the ongoing

impact of the novel coronavirus (COVID -19) and the considerable uncertainties about the geographic,

social and economic impact on the Company. Generally, forward-looking statements can be identified by

the use of forward- looking terminology such as “plans”, “expects” or “does not expect”, “is expected”,

“budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “continue”, “anticipates” or “does not

anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions,

events or results “may”, “could”, “would”, “wil l”, “might” or “will be taken”, “occur” or “be

achieved”. Forward-looking statements are made based upon certain assumptions and other important

facts that, if untrue, could cause the actual results, performances or achievements of Troilus to be

materially different from future results, performances or achievements expressed or implied by such

statements. Such statements and information are based on numerous assumptions regarding present and

future business strategies and the environment in which Troilus wi ll operate in the future. Certain

important factors that could cause actual results, performances or achievements to differ materially from

those in the forward- looking statements include, amongst others, currency fluctuations, the global

economic climate, dilution, share price volatility and competition. Forward-looking statements are subject

to known and unknown risks, uncertainties and other important factors that may cause the actual results,

level of activity, performance or achievements of Troilus to be materially different from those expressed

or implied by such forward- looking statements, including but not limited to: the impact the COVID 19

pandemic may have on the Company’s activities (including without limitation on its employees and

suppliers) and the economy in general; the impact of the recovery post COVID 19 pandemic and its impact

on gold and other metals; there being no assurance that the exploration program or programs of the

Company will result in expanded mineral resources; risks and uncertainties inherent to mineral resource

estimates; the high degree of uncertainties inherent to preliminary economic assessments and other

mining and economic studies which are based to a significant extent on various assumptions; variations in

gold prices and other precious metals, exchange rate fluctuations; variations in cost of supplies and labour;

receipt of necessary approvals; general business, economic, competitive, political and social uncertainties;

future gold and other metal prices; accidents, labour disputes and shortages; environmental and other

risks of the mining industry, including without limitation, risks and uncertainties discussed in the Technical

Report and in other continuous disclosure documents of the Company available under the Com pany’s

profile at www.sedar.com. Although Troilus has attempted to identify important factors that could cause

actual results to differ materially from those contained in forward-looking statements, there may be other

factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that

such statements will prove to be accurate, as actual results and future events could differ materially from

those anticipated in such statements. Accordingly, readers should not place und ue reliance on forward-

looking statements. Troilus does not undertake to update any forward- looking statements, except in

accordance with applicable securities laws.