October 17, 2022, Montreal, Quebec – Troilus Gold Corp. (“Troilus” or the “Company”, TSX: TLG; OTCQX:

CHXMF) reports positive assay results from the ongoing 11,000-metre drill campaign at its Troilus Project

in northcentral, Quebec, Canada, that aims to expand and identify higher-grade mineralization to the

northern and southern extents of Zone 87 (“Z87”), the larger of two formerly mined pits.

The results reported today are among the thickest and most continuous high grades identified at the

Project and includes the single highest-grade interval ever drilled at the Troilus Mine site. Furthermore, a

new shallow and high-grade panel of mineralization has been defined at the border of the Z87 PEA pit

shell, which was not modelled in the Preliminary Economic Assessment (“PEA”; see PEA results press

release dated August 31, 2020) nor considered as part of the pre-feasibility engineering work. This new

panel West of Z87 has thus far been identified over a 300-metre strike length and remains open at depth

and towards the Gap Zone. Highlights are reported below, while the complete results are presented in

Table 1, and drill hole locations are shown in Figures 1 and 2. As a result of Troilus’ belief in the immediate

impact of this new zone on the economics of the deposit, and after careful consideration, the Company

will aggressively work on defining the impact of this shallow high-grade material, and as such intends to

shift its engineering focus to the delivery of a Definitive Feasibility Study, rather than a pre-feasibility

study as initially planned, that will incorporate these results. Further details on the status and delivery of

the next engineering study is provided below.

Z87 Intercept Highlights:

 4.38 g/t AuEq over 46m, including 22.48 g/t AuEq over 1m and 154.27 g/t AuEq over 1m

 2.52 g/t AuEq over 25m, including 12.36 g/t AuEq over 3m and 3.15 g/t AuEq over 6m

 2.04 g/t AuEq over 17m including 4.95 g/t AuEq over 5m

 1.28 g/t AuEq over 61.6m, including 2.17 g/t AuEq over 9m and 2.79 AuEq over 5.7m

Shallow Mineralization Identifies New High-grade Ore Trend at Z87

Drill holes 87-410 and 87-411 discovered a new high-grade, at-surface, mineralized structure, returning

2.52 g/t AuEq over 25m (54m to 71m down-hole), including 12.36 g/t AuEq over 3m and 3.15 g/t AuEq

over 6m as well as 2.04 g/t AuEq over 17m (22m to 39m down-hole), including 4.95 g/t AuEq over 5m,

all located entirely outside the PEA pit shell. The mineralized panel currently has an interpreted minimum

strike length of 300 metres, 200 metres of which extend southward beyond the limits of the Z87 pit shell

modelled in the PEA, and remains open in all directions. The northern extent of the structure correlates

and is continuous with mineralized intervals in the Z87 hanging-wall, which were previously not modelled

due to lack of continuity and sampling in this area. The diorite intrusion which hosts this new zone was

historically believed to be un-mineralized, therefore was only sampled intermittently in past drilling

programs. Sampling of these intercepts is now underway, with the aim of better defining and extending

this new mineralized trend. This will also add potential to identify additional zones throughout the

hanging-wall. Current practice of top-to-bottom sampling of drill holes, combined with a more detailed

understanding of structural controls, have proven this unit to host mineralization. A newly developed

structural model indicates that this new zone may be part of a much larger prospective trend, which the

Company intends to explore more extensively in the immediate future.

High-Grade at Depth Confirms and Expands Z87 Main Zone 290m South of the PEA Pit

Drill hole 87-417 intercepted the single best metre ever drilled at Troilus, 154.27 g/t AuEq over 1m, within

an exceptional interval of 4.38 g/t AuEq over 46 metres. This interval lies 265 metres outside of the PEA

pit shell, occurring at a vertical depth of less than 400 metres from surface, and supports the opportunity

for additional high-grade material down-dip and along strike of the current resource.

Hole 87-416 intercepted 1.28 g/t AuEq over 61.6 metres, including 2.17 g/t AuEq over 9 metres and 2.79

AuEq over 5.7 metres. This hole was drilled up-dip of previously reported hole 87-415 (see press release

from August 17, 2022), which intersected 1.27 g/t AuEq over 101m, including 3.31 g/t AuEq over 20m,

and confirms consistent mineralization at depth beyond the PEA pit shell.

Justin Reid, CEO of Troilus Gold, commented, “We are thrilled about the exceptional high-grade drill

results announced today, including those defining a brand new, shallow mineralized panel located just

beyond the pit shell modelled in our PEA. We expect these results to have a significant impact on the

economic modelling of the project since we believe both the grades and widths of the new discovery in

Z87, along with its proximity to the main deposit, have the potential to immediately enhance the project’s

grade profile, notwithstanding any further definition. It also reconfirms the imperative for ongoing

exploration efforts across the project as part of our commitment to deliver value to all our shareholders,

as these have consistently expanded the orebody across all main zones. As a result of these positive

technical developments, coupled with cost and timing considerations, management has refocused its

engineering efforts towards a definitive feasibility study which we expect to deliver in H2 2023 following

the completion of the Z87 panel drilling. This decision allows our exploration team to continue aggressive

drilling and further define areas of mineralization along this corridor that remain open to expansion,

including today’s high-grade discovery. Management believes its decision to focus on delivering a

feasibility study, rather than the anticipated pre-feasibility study will ultimately result in the delivery of a

better, more accurate economic study to its stakeholders.”

Engineering Update

Considering the materially significant exploration results that have recently been obtained, the Company

has opted to proceed to a feasibility study from the PEA completed in August 2020, rather than bridging

those engineering studies with a Pre-Feasibility Study as previously planned.

Earlier this year, the Company announced the results of extensive metallurgical testwork completed by

Eriez and Base Met Labs, which confirmed high recoveries across all zones of the orebody (see press

releases dated February 28, June 28 and July 12, 2022). These results will be built upon with further

variability testwork to support the higher level of accuracy (+/- 15%) of a feasibility study. The Company

will continue to progress engineering work with its consultants for all aspects of required engineering,

including an extensive water management plan for the project and for the Environmental and Social

Impact Assessment (“ESIA”). The feasibility study is expected to be completed in H2 2023 upon completion

of drilling. The updated sequence of engineering studies is anticipated to maintain timelines for Provincial

and Federal permitting processes to align with our Feasibility Study, which were initiated in May 2022.

The new sequence of technical studies will allow the latest high-grade drill results to be incorporated into

the mine plan, which the Company strongly believes could be immediately impactful on the grade profile

and mine sequencing of the project. The feasibility study timeline will also allow the Company to better

understand and define zones of mineralization that remain open to further expansion.

Figure 1. Plan View Map of Zone 87, Showing Current and Previously Reported Drill Holes

Figure 2: Longitudinal Section Facing North-West Showing Intercepts above 1.0 g/t AuEq on Currently

Reported Drill Holes.

Figure 3: Isometric View of Z87 Pit Showing the New Ore Trend at Surface in the Hanging-wall

Table 1: Zone 87 Assay Results

Hole From

(m) To (m) Interval

(m)

Inside/Outside

of PEA Pit Shell

Au Grade

(g/t)

Cu Grade

(%)

Ag

Grade

(g/t)

AuEq

Grade

(g/t)

87-410

22 39 17 Outside 1.89 0.07 5.65 2.04

incl 33 38 5 Outside 4.55 0.18 17.62 4.95

228 233 5 Outside 0.80 0.01 0.25 0.81

incl 228 230 2 Outside 1.71 0.01 0.25 1.72

438 448 10 Outside 0.67 0.10 0.99 0.81

455 472 17 Outside 0.96 0.11 1.02 1.10

incl 455 462 7 Outside 1.83 0.21 1.75 2.10

87-411

32 34 2 Outside 1.42 0.03 1.60 1.47

46 71 25 Outside 2.48 0.02 1.54 2.52

incl 55 58 3 Outside 12.24 0.06 3.72 12.36

and 65 71 6 Outside 3.09 0.03 3.03 3.15

450 457 7 Outside 0.81 0.04 0.34 0.86

468 473.6 5.6 Outside 0.71 0.28 1.36 1.09

479 482 3 Outside 1.05 0.10 0.43 1.18

512 519.1 7.1 Outside 0.88 0.14 1.28 1.08

87-412

222 223 1.0 Outside 1.64 0.02 0.60 1.67

230 231 1.0 Outside 1.04 0.04 2.90 1.12

326 327 1.0 Outside 1.27 0.00 0.25 1.27

513.9 522.1 8.3 Outside 0.70 0.19 1.45 0.95

531.3 561 29.8 Outside 0.48 0.24 1.39 0.79

incl 537 540 3.0 Outside 0.79 0.28 1.37 1.15

incl 544 553 9.0 Outside 1.14 0.68 0.35 2.01

575.9 578 2.1 Outside 0.92 0.35 1.50 1.37

87-413

216 217 1 Outside 1.45 0.09 5.80 1.62

242 243 1 Outside 1.37 0.32 3.40 1.80

260 272 12 Outside 0.81 0.11 0.88 0.95

303 304 1 Outside 1.50 0.01 0.25 1.51

329 333 4 Outside 0.79 0.03 0.25 0.83

342 345 3 Outside 1.17 0.09 0.75 1.29

367 372 5 Outside 0.85 0.07 0.71 0.94

470 471 1 Outside 1.96 0.01 1.50 1.99

487 490 3 Outside 1.18 1.08 0.07 2.53

87-414

64 65 1 Inside 1.86 0.01 0.25 1.87

67.2 68.2 1 Inside 2.93 1.63 92.20 5.93

109 110 1 Inside 2.50 0.02 0.25 2.52

210 211 1 Outside 1.62 0.05 0.60 1.68

370 372 2 Outside 1.16 0.09 1.60 1.29

387 390 3 Outside 1.39 0.01 0.43 1.41

87-416

68 74 6 Inside 1.13 0.04 0.43 1.18

124 136 12 Inside 0.63 0.12 1.59 0.80

incl 124 126 2 Inside 2.12 0.26 3.85 2.49

256 316 60 Outside 0.70 0.04 0.62 0.76

incl 300 313 13 Outside 1.10 0.07 0.84 1.20

334.4 396 61.6 Outside 1.00 0.21 1.95 1.28

incl 344 352.9 8.9 Outside 1.86 0.24 1.25 2.17

incl 364 378 14 Outside 1.19 0.24 3.61 1.53

incl 388.3 394 5.7 Outside 1.82 0.73 5.72 2.79

431 433 2 Outside 1.18 0.01 0.25 1.20

87-417

97 98 1 Outside 2.18 0.00 0.25 2.18

107 112 5 Outside 1.14 0.00 0.25 1.14

347 393 46 Outside 4.30 0.06 0.44 4.38

incl 377 389 12 Outside 15.36 0.11 0.78 15.50

incl 379 380 1 Outside 154.00 0.20 2.70 154.27

401 414 13 Outside 1.15 0.08 0.74 1.25

incl 409 414 5 Outside 2.18 0.11 1.28 2.34

434 435 1 Outside 5.01 0.04 1.60 5.07

514 515 1 Outside 6.7 0.03 0.25 6.74

87-418

37 38.8 1.8 Outside 1.86 0.07 0.53 1.95

97 98 1 Outside 4.57 0.02 4.80 4.64

281 286 5 Outside 0.99 0.04 0.34 1.04

345.6 347 1.4 Outside 1.44 0.17 1.50 1.67

356 361 5 Outside 0.90 0.11 1.18 1.05

370.5 376 5.5 Outside 0.79 0.01 0.37 0.82

*Note drill intervals reported in this news release are down-hole core lengths as true thicknesses cannot be determined with

available information.

Quality Assurance and Control

During the Zone 87 drill program, one metre assay samples were taken from NQ core and sawed in half.

One-half was sent for assaying at ALS Laboratory, a certified commercial laboratory, and the other half

was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all

samples, which included insertion of one certified mineralized standard and one blank sample in each

batch of 25 samples. Every sample was processed with standard crushing to 85% passing 75 microns on

500 g splits. Samples were assayed by one-AT (30 g) fire assay with an AA finish and if results were higher

than 3.5 g/t Au, assays were redone with a gravimetric finish. For QA/QC samples, a 50 g fire assay was

done. In addition to gold, ALS laboratory carried out multi-element analysis for ME-ICP61 analysis of 33

elements four acid ICP-AES.

Qualified Person

The technical and scientific information in this press release has been reviewed and approved by Kyle

Frank, P.Geo., Manager of Exploration, who is a Qualified Person as defined by NI 43-101. Mr. Frank is an

employee of Troilus and is not independent of the Company under NI 43-101.

About Troilus Gold Corp.

Troilus Gold Corp. is a Canadian-based junior mining company focused on the systematic advancement

and de-risking of the former gold and copper Troilus Mine towards production. From 1996 to 2010, the

Troilus Mine produced +2 million ounces of gold and nearly 70,000 tonnes of copper. Troilus is located in

the top-rated mining jurisdiction of Quebec, Canada, where is holds a strategic land position of 1,420 km²

in the Frotêt-Evans Greenstone Belt. Since acquiring the project in 2017, ongoing exploration success has

demonstrated the tremendous scale potential of the gold system on the property with significant mineral

resource growth. The Company is advancing engineering studies following the completion of a robust PEA

in 2020, which demonstrated the potential for the Troilus project to become a top-ranked gold and copper

producing asset in Canada. Led by an experienced team with a track-record of successful mine

development, Troilus is positioned to become a cornerstone project in North America.

For more information:

Caroline Arsenault

VP Corporate Communications

+1 (647) 407-7123

[email protected]

Cautionary Note Regarding Forward-Looking Statements and Information

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability; the estimate of

Mineral Resources in the updated Mineral Resource statement may be materially affected by environmental,

permitting, legal, title, taxation, socio -political, marketing, or other relevant issues. There is no certainty that the

Indicated Mineral Resources will be converted to the Probable Mineral Reserve category, and there is no certainty

that the updated Mineral Resource statement will be realized.

The PEA is preliminary in nature, includes inferred mineral resources that are considered too speculative geologically

to have the economic considerations applied to them that would enable them to be categorized as mineral reserves,

and there is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves do not have

demonstrated economic viability. The PEA is subject to a number of risks and uncertainties. See below and the

Company’s latest technical report available on SEDAR for more information with respect to the key assumptions,

parameters, methods and risks of determination associated with the foregoing.

This press release contains “forward- looking statements” within the meaning of applicable Canadian securities

legislation. Forward -looking statements include, but are not limited to, statements regarding the impact of the

ongoing drill program and results on the Company, the possible economics of the project and the Company’s

understanding of the project; the development potential and timetable of the project; the estimation of mineral

resources; realization of mineral resource estimates; the timing and amo unt of estimated future exploration; the

anticipated results of the Company’s ongoing 2022 drill program and their possible impact on the potential size of

the mineral resource estimate; costs of future activities; capital and operating expenditures; success of exploration

activities; the anticipated ability of investors to continue benefiting from the Company’s low discovery costs, technical

expertise and support from local communities . Generally, forward-looking statements can be identified by the use

of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”,

“estimates”, “forecasts”, “intends”, “continue”, “anticipates” or “does not anticipate”, or “believes”, or variations of

such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “will”, “might”

or “will be taken”, “occur” or “be achieved”. Forward-looking statements are made based upon certain assumptions

and other important facts that, if untrue, could cause the actual results, performances or achievements of Troilus to

be materially different from future results, performances or achievements expressed or implied by such statements.

Such statements and information are based on numerous assumptions r egarding present and future business

strategies and the environment in which Troilus will operate in the future. Certain important factors that could cause

actual results, performances or achievements to differ materially from those in the forward- looking statements

include, amongst others, currency fluctuations, the global economic climate, dilution, share price volatility and

competition. Forward-looking statements are subject to known and unknown risks, uncertainties and other important

factors that may cause the actual results, level of activity, performance or achievements of Troilus to be materially

different from those expressed or implied by such forward -looking statements, including but not limited to: there

being no assurance that the exploration program will result in expanded mineral resources; risks and uncertainties

inherent to mineral resource estimates; the impact the COVID 19 pandemic may have on the Company’s activities

(including without limitation on its employees and suppliers) and the economy in general; the impact of the recovery

post COVID 19 pandemic and its impact on gold and other metals; the receipt of necessary approvals; general

business, economic, competitive, political and social uncertainties; future prices of mineral prices; accidents, labour

disputes and shortages; environmental and other risks of the mining industry, including without limitation, risks and

uncertainties discussed in the most recent Technical Report and in other continuous disclosure documents of the

Company available under the Company’s profile at www.sedar.com. Although Troilus has attempted to identify

important factors that could cause actual results to differ materially from those contained in forward -looking

statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can

be no assurance that such statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on

forward-looking statements. Troilus does not undertake to update any forward- looking statements, except in

accordance with applicable securities laws.