Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TK.V ·

Tinka Drills 45 Metres at 11.5% Zinc and 6.5 Metres at 27% Zinc at WEST Ayawilca

Drill Results

TINKA DRILLS 45 METRES AT 11.5% ZINC AND 6.5 METRES AT 27% ZINC AT WEST AYAWILCA 

Vancouver,  Canada  –  Tinka  Resources  Limited ( “Tinka”  o r  t h e  “Company”)  (T S X V  &  B V L :  T K)  (OTCQB:  TKRFF)  is 

pleased to announce results from four infill drill holes from the Company’s ongoing resource definition and expansion 

drill program at the Ayawilca zinc project in Peru. All four holes reported are from the West Ayawilca area.  The results 

reported in this release are of similar or better grade to the earlier holes and show strong continuity of the limestone‐

hosted  zinc  sulphide  mineralization  at  West  Ayawilca.  The  Company  recently  announced  an  extension  of  the  drill 

program to 11,000 metres due to the strong results particularly  from South Ayawilca.  Approximately 8,200 metres in 

24  drill  holes  have  been  completed  with  results  reported  for  17  holes.  The  drill  program  is  progressing  without 

interruption with two rigs operating 24/7 and is expected to continue until April 2023. 

Following the spectacular zinc intercept of 38.9 metres at 20% zinc (including 10.4 metres at 42% zinc) in hole A22‐202 

from  South  Ayawilca  (news  release  dated  Jan  9,  2023) ,  f o u r  a d d i t i o n a l  h o l e s  h a v e  b e e n  c o m p l e t e d  a n d  r e s u l t s  ar e  

pending.   

Key highlights – West Ayawilca 

 Hole A22‐207:   

o 5.9 metres at 24.0% zinc from 115.9 metres and  

o 132.5 metres at 6.8% zinc from 193.9 metres depth, including: 

 45.2 metres at 11.5% zinc from 248.0 metres depth, and 

 6.5 metres at 27.2% zinc from 319.9 metres depth.  

 Hole A22‐203:    

o 49.8 metres at 8.3% zinc from 186.8 metres depth, including: 

 5.9 metres at 13.9% zinc from 197.7 metres depth, and 

 2.8 metres at 23.3% zinc from 216.2 metres depth.  

 Hole A22‐205:   

o 134.0 metres at 4.8% zinc from 180.0 metres depth, including: 

 14.4 metres at 9.4% zinc from 300.0 metres depth. 

 Hole A22‐209:  1.0 metre at 11.4% zinc, 0.8% lead & 63 g/t silver from 274.3 metres depth.  

True thicknesses of the mineralized intercepts are estimated to be at least 75% of the downhole thicknesses. 

Dr.  Graham  Carman,  Tinka’s  President  and  CEO,  stated:  “These  new  drill  results  from  West  Ayawilca  add  to  the 

confidence  in  our  geological  model  and  reaffirm  the  zinc  grades   within  the  limestones.  The  grade  of  the  zinc 

mineralization is consistently high both within the basal limestone replacement zones and the overlying breccia‐hosted 

sulphide  bodies.    Importantly,  the  vertical  continuity  of  the  breccia‐hosted  zinc  mineralization  is  better  than  was 

previously recognised in some of the earlier holes at West Ayawilca. Several additional holes will further test the vertical 

and  horizontal  extents  of  the  breccia‐hosted  mineralization.  Meanwhile  at  South  Ayawilca,  the  second  drill  rig  is 

progressing well with a series of fan holes following up on the  spectacular intercept of 39 metres grading 20% zinc in 

hole A22‐202.  We look forward to publishing results of these follow‐up holes once they come to hand.” 

January 24, 2023 

T: 604.685.9316    [email protected]  

TSXV & BVL: TK   OTCQB: TKRFF NEWS RELEASE 

Discussion of the latest drill results 

Tinka has now completed approximately 8,200 metres for 24 holes in the 2022‐2023 resource definition‐expansion drill 

program with 17 of the holes now reported (including this release) ‐ see previous results dated  Oct 11, 2022 ,  Nov 21, 

2022 and  Jan 9, 2023 .  The objectives of the drill program continue to be to target  high‐grade zinc mineralization at 

South and West Ayawilca and to expand measured and indicated zinc resources. Table 1 summarises the drill intercepts 

in the four infill holes at West Ayawilca highlighted in this news release.  Table 2 summarises the complete list of holes 

to date in the 2022/2023 drill program.  An updated drill hole  map of the drill program is shown in  Figure 1.  A cross 

section of holes A22‐203 and A22‐205 is shown in  Figure 2. A cross section of hole A22‐207 is shown in  Figure 3.  A 

typical example of the breccia‐hosted zinc mineralization in drill core from A22‐207 is shown in Figure 4.   

Hole A22‐207 was a follow‐up of hole A22‐200, one of the best holes ever dr illed at West Ayawilca (44.9 metres at 

12.0% zinc from 283.3 metres) and produced a similar intercept  at a shallower depth: 45.2 metres at 11.5% zinc from 

248.0 metres.  This high‐grade interval formed part of a thicker lower grade interval consisting mostly of breccia‐hosted 

zinc mineralization which is typically observed in the upper po rtions of the West Ayawilca deposit:  132.5 metres at 

6.8% zinc from 194 metres depth downhole (from 180 metres vertical depth).  

Holes A22‐203 and A22‐205 were both follow‐up holes of A22‐197 (79.4 metres at 5.3% zinc from 271.6 metres depth 

including 26.3 metres at 8.4% zinc from 281.7 metres depth). A2 2‐203 intersected 49.8 metres 8.3% zinc from 186.8 

metres depth in limestone breccia, approximately 80 metres up‐s ection of the mineralized zinc intercept in hole A22‐

197.  Hole A22‐205 was drilled underneath A22‐197 and intercepted 63.3 metres at 6.6% zinc including 14.4 metres at 

9.4% zinc from 291 metres depth.   

Hole A22‐209 tested the northern‐most extens ion of the mineralization at We st Ayawilca.  The best mineralization in 

A22‐209 was 1 metre at 11.3% zinc with an additional narrow intercept of 1.7 metres at 7.7% Zn+Pb & 108 g/t Ag.   

Table 1.  Summary of results for drill holes in this release  

Hole  From (m)  To (m)  Interval 

(m)  Zinc %  Lead %  Silver g/t  Indium ppm 

A22‐203  155.90  156.85  0.95  30.26  0.10  88  370 

and  186.80  236.60  49.80  8.27  0.07  16  30 

incl  197.70  203.55  5.85  13.94  0.02  17  23 

incl  216.20  219.00  2.80  23.34  0.21  51  144 

incl  227.45  229.30  1.85  23.67  0.09  43  203 

A22‐205  180.00  314.00  134.00  4.75  0.09  10  132 

incl  196.40  206.60  10.20  6.20  0.01  11  32 

incl  250.70  314.00  63.30  6.60  0.16  13  215 

incl  290.95  305.30  14.35  9.41  0.70  25  222 

A22‐207  115.90  121.80  5.90  24.04  0.03  23  70 

and  193.90  326.40  132.50  6.77  0.33  21  36 

incl  248.00  293.20  45.20  11.48  0.57  39  94 

and  319.90  326.40  6.50  27.15  0.06  37  69 

incl  322.60  326.40  3.80  42.86  0.04  53  118 

A22‐209  274.30  275.30  1.00  11.35  0.84  63  0 

and  308.30  310.00  1.70  5.10  2.59  108  1 

Notes on sampling and assaying  

Drill holes are diamond HQ size core holes with recoveries gene rally above 80% and often close to 100%. The drill core is mark ed 

up, logged, and photographed on site. The cores are cut in half  at the Company’s core storage facility, with half‐cores stored as a 

future reference. Half‐core was bagged on average over 1 to 2 m etre composite intervals and sent to SGS laboratory in Lima for  

assay in batches. Standards and blanks were inserted by Tinka i nto each batch prior to departure from the core storage facilities. 

At the laboratory samples are dried, crushed to 100% passing 2mm, then 500 grams pulverized for multi‐element analysis by ICPMS 

using multi‐acid digestion. Samp les assaying over 1% zinc, lead , or copper and over 100 g/t silver were re‐assayed using preci se 

ore‐grade AAS techniques.  Samples within massive sulphide zone s were also assayed for tin using fusion and atomic absorption 

techniques.   

Figure 1.  Drill hole map of Ayawilca highlighting 2022‐2023 drill holes and Zinc Zone indicated resources 

Note:  New drill holes are highlighted in red in this release 

Figure 2. Cross of hole A22‐203 and A22‐205 at West Ayawilca  

Figure 3. Cross of hole A22‐207 at West Ayawilca 

Figure 4. Drill core of breccia‐hosted zinc sulphides (brown colour) in drill hole A22‐207 with interstitial carbonates 

and clays (white colour).  

Table 2.  Drill hole details for 2022‐2023 drill program including drill collar coordinates. 

Drill hole  Easting  Northing  Elevation  Azimuth  Dip  Depth  Area  Co mment 

A22‐190  333281  8845755  4167  180  ‐50  498.95  Central  Results repo rted 

A22‐191  333169  8845799  4182  180  ‐55  478.80  Central  Results repo rted 

A22‐192  333345  8845195  4208  232  ‐74  385.90  South  Results report ed 

A22‐193  332766  8845659  4237  68  ‐65  365.40  West  Results reported  

A22‐194  333143  8845231  4226  135  ‐73  380.20  South  Results report ed 

A22‐195  333149  8845353  4221  148  ‐65  426.90  South  Results report ed 

A22‐196  333035  8845307  4235  174  ‐45  382.10  South  Results report ed 

A22‐197  332912  8845693  4220  264  ‐55  412.60  West  Results reporte d 

A22‐198  332900  8845768  4222  265  ‐53  451.10  West  Results reporte d 

A22‐199  333046  8845067  4195  303  ‐66  344.10  South  Results report ed 

A22‐200  332821  8845889  4246  260  ‐58  352.00  West  Results reporte d 

A22‐201  333342  8845195  4208  310  ‐73  58.90 

South (deepening 

of A17‐066)  Results pending 

A22‐202  333046  8845066  4197  283  ‐52  270.15  South  Results report ed 

A22‐203  332839  8845685  4228  264  ‐60  350.00  West  Results HERE 

A22‐204  333090  8845061  4196  307  ‐60  334.30  South  Results report ed 

A22‐205  332839  8845685  4227  244  ‐72  352.70  West  Results HERE 

A22‐206  333044  8845064  4197  270  ‐58  217.30  South  Results pendin g 

A22‐207  332710  8845883  4252  254  ‐74  332.00  West  Results HERE 

A22‐208  333044  8845064  4197  270  ‐70  282.55  South  Results pendin g 

A22‐209  332738  8845927  4251  257  ‐68  314.15  West  Results HERE 

A22‐210  333047  8845065  4197  297  ‐48  259.80  South  Results pendin g 

A22‐211  332785  8845707  4236  260  ‐75  295.00  West  Results pending  

A23‐212  333047  8845065  4197  228  ‐79  324.30  South  Results pendin g 

A23‐213  332853  8845650  4225  258  ‐65  316.00  West  Results pending  

TOTAL    8185.20   

 Notes:   Datum for coordinates is WGS84 Zone 18S.    Azimuth is true azimuth. 

The Qualified Person, Dr.  Graham  Carman, Tinka’s  President and  CEO, and a Fellow of the Australasian Institute of 

Mining and Metallurgy, has reviewed and verified the technical contents of this release.   

Readers are encouraged to read the NI 43‐101 Technical Report e ntitled "Ayawilca Polymetallic Project, Central Peru, 

NI 43‐101 Technical Report on Updated Preliminary Economic Assessment" available for download on Tinka’s website 

at www.tinkaresources.com. The Technical Report was prepared by Mining Plus Peru S.A.C. (“Mining Plus”) as principal 

consultant, Transmin Metallurgic al Consultants (“Transmin”), En vis E.I.R.L (“Envis”), and SLR Consulting (Canada) Ltd 

(“SLR”).   

On behalf of the Board, 

“Graham Carman” 

Dr. Graham Carman, President & CEO  

Further Information:  

www.tinkaresources.com 

Mariana Bermudez  1.604.685.9316 

 [email protected] 

Stay  up  to  date  by  subscribing  for  news  alerts  at Contact  Tinka 

and by following Tinka on  Twitter, LinkedIn and Facebook.  

About Tinka Resources Limited   

Tinka  is  an  exploration  and  development  company  with  its  flagship  property  being  the  100%‐owned  Ayawilca  zinc‐

silver‐tin project in central Pe ru. The Zinc Zone deposit has a n estimated Indicated Mineral Resource of 19.0 Mt @ 

7.15% Zn, 16.8 g/t Ag & 0.2% Pb and Inferred Mineral Resource o f 47.9 Mt @ 5.4% Zn, 20.0 g/t Ag & 0.4% Pb (dated 

August 30, 2021 ‐  see news release ).  The Ayawilca Tin Zone has an estimated Inferred Mineral Res ource of 8.4 Mt 

grading 1.0% Sn.  Tinka holds 46,000 hectares of mining claims  in Central Peru, one of the largest holders of mining 

claims in the belt. Tinka is actively exploring for copper‐gold skarn mineral deposits at its 100%‐owned Silvia project.  

Forward Looking Statements: Certain information in this news re lease contains forward‐looking  statements and forward‐looking 

information within the meaning o f applicable securities laws (c ollectively "forward‐looking sta tements").  All statements, oth er 

than  statements  of  historical  fact  are  forward‐looking  statements.  Forward‐looking  statements  are  based  on  the  beliefs  and 

expectations of Tinka as well as assumptions made by and information currently available to Tinka's management.  Such statements 

reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations: timing of planned 

work programs and results varying from expectations; delay in obtaining results; changes in equity markets; uncertainties relating 

to the availability and costs of financing needed in the future; equipment failure, unexpected geological conditions; imprecision in 

resource  estimates  or  metal  recoveries;  success  of  future  development  initiatives;  competition  and  operating  performance; 

environmental and safety risks; the Company’s expectations regarding the Ayawilca Project PEA; the political environment in which 

the Company operates continuing to support the development and operation of mining projects; risks related to negative publicity 

w i t h  r e s p e c t  t o  t h e  C o m p a n y o r  t h e  m i n i n g  i n d u s t r y i n  g e n e r a l ;  the threat  associated  with  outbrea k s  o f  v i r u s e s  a n d  i n f e c t i o u s  

diseases, including the novel CO VID‐19 virus; delays in obtaini ng or failure to obtain necessary permits and approvals from lo cal 

authorities; community agreements and relations; and, other dev elopment and operating risks. Should any one or more of these 

risks or uncertainties materialize, or should any underlying as sumptions prove incorrect, actual  results may vary materially f rom 

those described herein.  Although Tinka believes that assumptio ns inherent in the forward‐looking statements are reasonable, 

forward‐looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such 

statements due to the inherent uncertainty therein. Except as m ay be required by applicable secur ities laws, Tinka disclaims a ny 

intent or obligation to update any forward‐looking statement. 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) 

accepts responsibility for the adequacy or accuracy of this news release