Preliminary Metallurgical Results from Nucleus Gold Deposit, Freegold Mountain Project, Yukon Recoveries of 97% Gold

Exploration Programs Metallurgy & Processing

September 19, 2012    TSX.V: NFR  PR # 12‐15  OTCQX: NFRGF  Frankfurt: 8N6 

Preliminary Metallurgical Results from Nucleus Gold Deposit, Freegold Mountain Project, Yukon  Recoveries of 97% Gold 

Vancouver, BC: September 19, 2012. Northern Freegold Resources Ltd. (NFR: TSX‐V, NFRGF: OTCQX) (“Northern  Freegold”  or  the  "Company")  is  pleased  to  announce  preliminary  results  from  ongoing metallurgical  studies  at  the  Nucleus  Au‐Ag  deposit  at  the  Freegold  Mountain  project,  Yukon.    The Nucleus  zone  forms  a  part  of  the  large,  100%  owned,  Freegold  Mountain  project.    The  property  is accessible  by  a  government  maintained  road  and  is  located  approximately  70  kilometres  from  the Klondike Highway which runs between Whitehorse and Dawson.

Highlights 

  • Recoveries of up to 97% Au and 51% Ag by whole ore cyanide leach.
  • Nucleus is a gold dominant deposit with gold representing in excess of 80% of the Au Equivalent resource based on our current understanding of the deposit model.

John Burges, President and CEO of Northern Freegold stated, “We are very pleased with the excellent overall  recoveries  of  gold  and  silver  through  whole  ore  CN  leach.    These  recoveries  compare  very favourably with other higher grade gold deposits.  This coupled with our recent announcement of similar excellent  recoveries  at  the  adjacent  Revenue  copper,  gold,  molybdenum  and  silver  deposit  is  a  key milestone for Northern Freegold.”

Metallurgical Test Work 

Metallurgical test work was completed at SGS Laboratories under the supervision of Jalal Tajadod, PhD, PEng.  Sample composites consisting of mixed metamorphic and intrusive rocks representative of the mineralized zones were prepared by SGS from 188 kilograms of drill sample rejects.  SGS prepared two variability samples from these composites with each sample being blended, crushed, split and combined into one sub‐composite.

Given that the Nucleus deposit is Au dominant, it was decided to complete CN leach tests on whole ore. Additionally, basic flotation test work was completed.  Three whole ore CN leach tests were conducted. The feed was pulped to 40% solids and brought to pH 10.5‐11 with lime, 0.5 g/l of CN was added and the pulp was rolled for 48 hours.  Grind size was varied in the three tests and was achieved in a ball mill.

Results, from coarsest to finest grind, are as follows.

Sample Sub‐CompLithologyTest NumberGrind Size MicronsRecovery
Au %Ag %
4Mixed metamorphics and intrusivesCN‐115093.2%38.5%
4Mixed metamorphics and intrusivesCN‐29594.8%35.6%
4Mixed metamorphics and intrusivesCN‐37596.9%51.1%

These  results  conclude  the  first  phase  of  the  Nucleus  deposit  metallurgical  test  work  commenced  in early 2012 and show that excellent recoveries of Au and Ag can be achieved through CN leach.  The four flotation rougher tests produced less than acceptable copper concentrations.  Future metallurgical work will look at alternate processes including gravity and further flotation tests.  A single gravity separation recovered 36% of the Au, therefore, a process of gravity separation followed by CN leach on gravity tails should be investigated.

Freegold Mountain Project  

The  Freegold  Mountain  project  is  located  within  the  Dawson  Range,  approximately  70  kilometres northwest of the community of Carmacks, Yukon.  Commercial electrical power is available at Carmacks, which is situated on the Klondike Highway, a paved all‐weather highway running from Whitehorse to Dawson City.  The property covers an area in excess of 198 square kilometres (75 square miles) and is accessible by a government maintained road.  The Nucleus Au Deposit and the Revenue Cu‐Au‐Mo‐Ag Deposit cover approximately 30 square kilometres.

The Nucleus Deposit is a near‐surface, gold dominant deposit.  Mineralization begins at surface and is open to expansion laterally and at depth.  The resource (at a 0.4 AuEq cut‐off) contains 48.5M tonnes grading 0.70 g/t gold, 0.90 g/t silver and 0.06% copper (1.1 M oz Au, 1.4 M oz Ag, 67.8 M lbs Cu or 1.4 M oz AuEq) in the Indicated Category and 41.5M tonnes grading 0.47 g/t gold, 0.98 g/t silver and 0.07% copper (0.6 M oz Au, 1.3 M oz Ag and 62.0 M lbs Cu or 0.9 M oz Au Eq) in the Inferred Category (see news release dated February 22, 2011).

Mineral Resource Estimate for Nucleus Deposit

GoldSilverCopperGold Equivalent
AuEq* Cutoff (g/t)TonnesGrade (g/t)Contained Au ouncesGrade (g/t)Contained Ag ouncesGrade %Contained Cu lbsGrade (g/t)Contained ounces
Indicated
0.3070,192,0000.551,250,0000.781,756,0000.0687,599,0000.721,635,000
0.4048,499,0000.701,096,0000.901,398,0000.0667,753,0000.891,393,000
0.5034,616,0000.86961,0001.021,189,0000.0752,964,0001.071,194,000
Inferred
0.3064,210,0000.38783,0000.851,751,0000.0684,390,0000.561,153,000
0.4041,449,0000.47627,0000.981,307,0000.0762,026,0000.67898,000
0.5026,939,0000.59509,0001.05912,0000.0741,593,0000.80691,000
  • Gold equivalent (AuEq) is calculated based upon prices of US$846/oz for gold, US$14.40/oz for silver,

and US$3.31/lb for copper with no discount for metallurgical recovery in contained metal figures (Note: total contained AuEq values may not add exactly because of rounding).

** The resource estimate is categorized as indicated and inferred as defined by the CIM guidelines for resource reporting. Mineral resources do not demonstrate economic viability, and there is no certainty that these mineral resources will be converted into mineable reserves once economic considerations are applied.  The indicated and inferred mineral resource estimate has been prepared in compliance with the standards of NI 43‐101 by Dr. A. Armitage, P. Geol., and J. Campbell, B.Sc., P. Geo., of GeoVector Management  Inc.    GeoVector  is  an  Ottawa,  Ontario  based  consulting  firm  specializing  in  resource estimation, project assessment and project management.

2012 Exploration 

A 2,453 metre, five hole diamond drill program at Nucleus was completed in early July.  The focus of this drilling program is to expand the existing gold resource at depth and to better understand the structural controls  to  mineralization.    The  analytical  results  are  currently  being  reviewed  by  the  Company’s consultants and management.  In addition to drilling there are ongoing baseline environmental studies underway.    The  project  is  being  managed  by  GeoVector  Management  Inc.  of  Ottawa,  Ontario, (www.geovector.ca) under the supervision of A. Sexton, M.Sc., P. Geo.

Paul Reynolds, B.Sc., P. Geo., Vice President Exploration for Northern Freegold Resources Ltd., is the qualified  person,  as  defined  by  NI  43‐101,  and  has  reviewed  the  technical  information  in  this  news release.

About Northern Freegold 

Northern Freegold Resources Ltd. (TSX.V: NFR; OTCQX: NFRGF) trades in Canada on the TSX Venture Exchange under the symbol "NFR" and in the United States on the OTCQX under the symbol "NFRGF". Northern Freegold is a growth oriented Canadian‐based precious metals exploration and development company.  Northern Freegold is focused on creating value through the advancement of the district scale Freegold Mountain project, which hosts one of the largest undeveloped gold and copper resources in the Yukon and through the Burro Creek gold and silver property in Arizona.

PR Contact for Northern Freegold Resources Ltd.:

Andy Hay, Investor Relations, +1 (604) 893‐8757, [email protected]

On behalf of the Board of Directors Signed "John Burges"

John Burges, President and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward‐Looking Statements 

The  information  in  this  press  release  includes  certain  "forward‐looking  statements".  All  statements, other  than  statements  of  historical  fact,  included  herein  including,  without  limitation,  plans  for  and intentions  with  respect  to  the  company's  properties,  strategic  alternatives,  quantity  of  resources  or reserves, timing of permitting, construction and production and other milestones, are forward looking statements. Statements concerning Mineral Reserves and Mineral Resources are also forward‐looking statements in that they reflect an assessment, based on certain assumptions, of the mineralization that would  be  encountered  and  mining  results  if  the  project  were  developed  and  mined  in  the  manner described.  Forward‐looking  statements  involve  various  risks  and  uncertainties.  There  can  be  no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results  to  differ  materially  from  NFR's  expectations  include  the  uncertainties  involving  the  need  for additional  financing  to  explore  and  develop  properties  and  availability  of  financing  in  the  debt  and capital markets; uncertainties involved in the interpretation of drilling results and geological testing and the estimation of reserves and resources; the need for cooperation of government agencies and First Nations groups in the exploration, and development of properties; and the need to obtain permits and governmental approval. NFR's forward looking statements reflect the beliefs, opinions and projections of management on the date the statements are made. NFR assumes no obligation to update the forward looking statements if management's beliefs, opinions, projections, or other factors should change.