Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TI.TO ·

Titan Announces Record Production and is on Track to Exceed 2023 Production Guidance; New Exploration Results Include 41ft at 37.6% Zinc

Drill Results Production Results

Titan Announces Record Production and is on Track to Exceed 2023 Production

Guidance; New Exploration Results Include 41ft at 37.6% Zinc

Vancouver, B.C., September 14, 2023 – Titan Mining Corporation (TSX:TI) (“Titan” or the “Company”)

is pleased to announce a new production record and that it is on track to exceed 2023 production

guidance. In addition, new exploration results include 41ft at 37.6% zinc at its 100% owned Empire State

Mines (“ESM”) located in upstate New York.

Highlights

- Best year to date safety performance with total recordable injury frequency at one-half of the

national average

- A monthly production record of 7.2 million payable pounds of zinc in August 2023 (57% above

the average monthly production from June 30, 2022 to June 30, 2023)

- 13.2 million payable pounds of zinc through the first two months of Q3 2023 (Q3 2023 tracking

to exceed average quarterly production from June 30, 2022 to June 30, 2023 of 13.7 million

payable pounds of zinc)

- On track to exceed annual production guidance of 54-58 million payable pounds of zinc

- Exploration results including 41.0 feet (12.5 meters) assaying 37.6% zinc Including 25.8

feet (7.9 meters) assaying 52.9% zinc

CEO Don Taylor commented, “Operationally, ESM is enjoying its best four quarters since the mine

restart in 2017. Fortunately, the #4 ore body provides ample flexibility, which allows the mining and

milling operations to deal with lower price environments, and as such our management team has done

an outstanding job of cutting unit costs while continuing to increase output. In addition, during this period

our near-mine and underground exploration programs have been successful in i dentifying new

mineralized zones as well as extending known zones of mineralization that will translate into a longer

mine life and add additional flexibility to future production schedules. It would be remiss to not mention

that while production is up and site costs are down, this has all occurred with the management and

workforce achieving the best year-to-date safety performance in the last six years of operation.”

Production and Operational Update

Building off a strong second quarter, ESM has continued to gain momentum producing 13.2 million

payable pounds of zinc through the first two months of the quarter. Production included a record 7.2

million payable pounds of zinc in the month of August. Production has been better than expected due

to mining of higher-grade areas in Mahler and Mud Pond and strong equipment availability. The record

operational performance was achieved with no reportable injuries since March and only one in all of

2023. At the end of August, ESM’s Total Recordable Injury Frequency Rate was at 1.3, which is one-

half of the national average for underground mines in the United States.

Given the strong performance of the mine year-to-date, the Company expects to exceed its production

guidance of 54-58 million payable pounds in FY 2023. While concentrate smelting and refining costs

remain elevated as a result of higher than usual benchmark treatment charges, the Company’s site

operation costs have trended down throughout the third quarter.

Exploration Update

Underground exploration has focused on extending near mine mineralization along strike from the active

Lower Mahler and New Fold ore bodies. To date assays have been returned on twenty-two holes from

the Lower Mahler program. The program has successfully i dentified high grade extensions of

mineralization that will be included in the Company’s updated mine plan, and have generated additional

exploration targets. MA23-022 has successfully extended mineralization roughly 1,000 feet from the

previously known mineralized extent.

Key Lower Mahler Intercepts Include

• 41.0 feet (12.5 meters) assaying 37.6% zinc

o Including 25.8 feet (7.9 meters) assaying 52.9% zinc

• 20.9 feet (6.4 meters) assaying 34.0% zinc

• 23.4 feet (7.1 meters) assaying 29.3% zinc

• 16.6 feet (5.1 meters) assaying 37.7% zinc

• 32.5 feet (9.9 meters) assaying 15.4% zinc

• 42.0 feet (12.8 meters) assaying 11.2% zinc

o Including 11.2 feet (3.4 meters) assaying 21.1% zinc

• 39.2 feet (11.9 meters) assaying 11.3% zinc

• 18.6 feet (5.7 meters) assaying 23.4% zinc

• 31.0 feet (9.4 meters) assaying 14.0% zinc

• 21.8 feet (6.6 meters) assaying 15.8% zinc

• 37.5 feet (11.4 meters) assaying 8.1% zinc

• 54.8 feet (16.7 meters) assaying 5.3% zinc

• 36.2 feet (11 meters) assaying 7.3% zinc

• 30.5 feet (9.3 meters) assaying 7.4% zinc

• 18.7 feet (5.7 meters) assaying 11.1% zinc

• 11.8 feet (3.6 meters) assaying 14.5% zinc

• 22.9 feet (7.0 meters) assaying 6.2% zinc

Note: True widths of the mineralized zone are not known at this time

The drilling at Lower Mahler is part of an ongoing program to identify near mine exploration and

development targets. The Company previously announced the identification of a zone of mineralization

between the Lower Mahler and New Fold ore bodies (press releases dated January 31, 2023, “Titan

Mining Announces Discovery of New Zone of Near -Mine Mineralization Including 48.7 ft at

23.91% Zinc”; and June 14, 2023, “Titan Updates Exploration including, 26.3 feet assaying 14.9%

zinc, 3.9% lead, and 34.9 g/t silv er; Provides Dividend Update”). Exploration drilling in this area

of the mine is planned through the end of 2023.

Figure 1: Location map showing the relative position of the Lower Mahler drilling to ESM's #4 shaft.

Figure 2: View of the Lower Mahler Drilling from above.

Table 1: Drill intercepts from the 2023 Mahler exploration program. Note: drilled intercepts do not reflect true width of mineralized

zone.

2023 - Mahler Exploration Drilling

Hole ID From (ft) To (ft) Interval (ft) From (m) To (m) Interval (m) Zn%

MA23-001 235.2 271.4 36.2 71.7 82.7 11.0 7.3

MA23-002

MA23-003 209.2 239.7 30.5 63.8 73.1 9.3 7.4

MA23-004 247.7 263.2 15.5 75.5 80.2 4.7 5.6

MA23-005 220.5 243.4 22.9 67.2 74.2 7.0 6.2

MA23-006 276.1 287.9 11.8 84.2 87.8 3.6 14.5

MA23-007

MA23-008 316.6 371.4 54.8 96.5 113.2 16.7 5.3

MA23-009

MA23-010 257.3 299.3 42.0 78.4 91.2 12.8 11.2

including 288.1 299.3 11.2 87.8 91.2 3.4 21.1

MA23-011 246.0 287.0 41.0 75.0 87.5 12.5 37.6

including 249.7 275.5 25.8 76.1 84.0 7.9 52.9

378.8 396.3 17.5 115.5 120.8 5.3 5.7

MA23-012 297.4 336.6 39.2 90.6 102.6 11.9 11.3

MA23-013 313.3 332.0 18.7 95.5 101.2 5.7 11.1

MA23-014 257.7 295.2 37.5 78.5 90.0 11.4 8.1

321.8 343.6 21.8 98.1 104.7 6.6 15.8

425.6 442.2 16.6 129.7 134.8 5.1 37.7

MA23-015 291.7 312.6 20.9 88.9 95.3 6.4 34.0

347.7 366.3 18.6 106.0 111.6 5.7 23.4

MA23-016 317.8 348.8 31.0 96.9 106.3 9.4 14.0

MA23-017

MA23-018

MA23-019 380.3 403.7 23.4 115.9 123.0 7.1 29.3

451.4 455.8 4.4 137.6 138.9 1.3 21.3

469.0 481.3 12.3 143.0 146.7 3.7 9.2

MA23-020 333.1 338.9 5.8 101.5 103.3 1.8 14.3

355.3 362.5 7.2 108.3 110.5 2.2 12.3

377.0 390.8 13.8 114.9 119.1 4.2 7.2

MA23-021 361.6 372.9 11.3 110.2 113.7 3.4 7.2

381.4 413.9 32.5 116.3 126.2 9.9 15.4

426.8 437.3 10.5 130.1 133.3 3.2 8.0

467.4 481.7 14.3 142.5 146.8 4.4 16.1

MA23-022 1,235.8 1,245.0 9.2 376.7 379.5 2.8 3.8

No Significant Intercepts

No Significant Intercepts

No Significant Intercepts

No Significant Intercepts

No Significant Intercepts

Table 2: Collar locations of the 2023 Mahler exploration program.

Qualified Person

The scientific and technical information contained in this news release and the sampling,

analytical and test data underlying the scientific and technical information has been reviewed,

verified and approved by Donald R. Taylor, MSc., PG, President and Chi ef Executive Officer of

the Company, a qualified person for the purposes of NI 43 -101. Mr. Taylor has more than 25

years of mineral exploration and mining experience and is a Registered Professional Geologist

through the SME (registered member #4029597). The data was verified using data validation and

quality assurance procedures under high industry standards.

Assays and Quality Assurance/Quality Control

To ensure reliable sample results, the Company has a rigorous QA/QC program in place that

monitors the c hain-of-custody of samples and includes the insertion of blanks and certified

reference standards at statistically derived intervals within each batch of samples. Core is

photographed and split in half with one-half retained in a secured facility for verification purposes.

Sample preparation (crushing and pulverizing) has been performed at ALS Geochemistry (“ALS”),

an independent ISO/IEC accredited lab located in Sudbury, Ontario, Canada. ALS prepares a

pulp of all samples and sends the pulps to their analytical laboratory in Vancouver, B.C., Canada,

for analysis. ALS analyzes the pulp sample by an aqua regia digestion (ME -ICP41 for 35

elements) with an ICP – AES finish including Cu (copper), Pb (lead), and Zn (zinc). All samples

in which Cu (copper), Pb (lead), or Zn (zinc) are greater than 10,000 ppm are re -run using aqua

regia digestion (Cu -OG46; Pb-OG46; and Zn -OG46) with the elements reported in percentage

(%). Silver values are determined by an aqua regia digestion with an ICP-AES finish (ME-ICP41)

with all samples with silver values greater than 100 ppm repeated using an aqua regia digestion

overlimit method (Ag -OG46) calibrated for higher levels of silver contained. Gold values are

determined by a 30 g fire assay with an ICP -AES finish (Au -ICP21). Grap hite values are

determined by leach and induction furnace/IR (C-IR18).

The Company has not identified any drilling, sampling, recovery, or other factors that could

materially affect the accuracy or reliability of the data set out in this news release.

About Titan Mining Corporation

Titan is an Augusta Group company which produces zinc concentrate at its 100%-owned Empire

State Mine located in New York state. Titan is built for growth, focused on value and committed

to excellence. For more information on the Company, please visit our website at

www.titanminingcorp.com.

Contact

For further information, please contact:

Investor Relations:

Email: [email protected]

Cautionary Note Regarding Forward-Looking Information

Certain statements and information contained in this new release constitute "forward-looking statements", and

"forward-looking information" within the meaning of applicable securities laws (collectively, "forward-looking

statements"). These statements appear in a number of places in this news release and include statements

regarding our intent, or the beliefs or current expectations of our officers and directors, including that it is on track

to exceed 2023 production guidance; that the exploration program has successfully identified high grade

extensions of mineralization that will be included in the Company’s updated mine plan, and have generated

additional exploration targets; and that exploration drilling in this area of the mine is planned through the end of

2023. When used in this news release words such as “could”, “to be”, "will", "planned", "expected", "potential", and

similar expressions are intended to identify these forward-looking statements. Although the Company believes that

the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance

should not be placed on forward -looking statements since the Company can give no assurance that such

expectations will prove to be correct. These statements involve known and unknown risks, uncertainties and other

factors that may cause actual results or events to vary materially from those anticipated in such forward-looking

statements, including the risks, uncertainties and other factors identified in the Company's periodic filings with

Canadian securities regulators. Such forward-looking statements are based on various assumptions, including

assumptions made with regard to future production at ESM; the ability to advance exploration efforts at ESM; the

results of such exploration efforts; the ability to secure adequate financing (as needed); the Company maintaining

its current strategy and objectives; and the Company’s ability to achieve its growth objectives. While the Company

considers these assumptions to be reasonable, based on information currently available, they may prove to be

incorrect. Except as required by applicable law, we assume no obligation to update or to publicly announce the

results of any change to any forward-looking statement contained herein to reflect actual results, future events or

developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If we

update any one or more forward-looking statements, no inference should be drawn that we will make additional

updates with respect to those or other forward-looking statements. You should not place undue importance on

forward-looking statements and should not rely upon these statements as of any other date. All forward-looking

statements contained in this news release are expressly qualified in their entirety by this cautionary statement.