Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

THX.V ·

Thor Announces Continuing Positive

Corporate Updates

NEWS RELEASE

NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR

DISTRIBUTION TO U.S. WIRE SERVICES

FOR IMMEDIATE RELEASE

TSXV: THX

June 1

, 2021

Shares Outstanding:

621,405,975

Vancouver, British Columbia

THOR ANNOUNCES

CONTINUING

POSITIVE

RESULTS

FROM

RC INFILL DRILLING AT

MAKOSA

TAIL

PROSPECT, SENEGAL

Thor Explorations Ltd. (TSX VENTURE: THX) (“

Thor

” or the “

Company

”) is pleased to announce

an

encouraging

first set of drill results from the southern Makosa Tail Prospect at its Douta Projec

t,

Senegal. The exploratory

drill

ing program was designed to infill the initial wide

-

spaced drilling that

was completed in late 2020 which

led

to the Makosa Tail discovery. The results received to date

confirm the continuation of the Makosa mineralised sys

tem along strike to the south.

Highlights

include:

Makosa

Tail Prospect

mineralisation confirmed over

1,0

00m of strike length

in a number of

parallel lodes

including a

3

00m high grade zone

in a previously untested area.

Drillhole

DTRC

155

5m at

11.0

/tAu from

17

m

Drillhole DTRC1

56

5

m at

10.1

/tAu from

7

m

Drillhole

DTRC1

81

5

m at

3.3

/t from

4

m

Mineralisation remains open

ended to the north

, south and at depth

Segun Lawson, President & CEO, stated

“

The

Makosa

Tail

prospect

continues

to

deliver

encouraging

drilling

results

with

numerous

significant

intersection

s

reported

from

the

near

-

surface

zone

in

the

follow

-

up

program

to

the

initial

discovery

holes

that

were

drilled

in

late

202

0

.

This

is

excellent

start

to

the

larger

exploration

and

resource

definition

drilling

campaign

and

has

achieved

the

initial

objective

of

testing

Makosa

Tail

which

is

open

along

strike

and

at

depth.

We

are

looking

forward

to

completing

the

ongoing

drilling

between

Makosa

Tail

and

Makosa

and

receiving

the

results,

after

which

the

rig

will

be

move

d

to

Makosa

North

to

test

the

northern

extension

of

Makosa.

“

Introduction

The Douta Gold Project is a gold exploration permit that covers an area of

58

km

2

and is located

within the Kéniéba inlier, eastern Senegal. The

northeast trending

permit

(Figure 1) has

an area of

58

km

2

.

Thor, through its wholly owned subsidiary African Star Resources Incorporated (“African Star”),

contractually acquired

a 70%

interes

t in

the licence from the permit holder International Mining

Company SARL (“IMC”). IMC has a 30% free carry until the announcement by Thor of a Probable

R

eserve.

The Douta licence is strategically positioned

4km east of

the deposits Massawa

North and Massawa

Central deposits

which

form

part of the

world class

Sabadola

-

Massawa Project that is owned by

Teranga Gold Corporation

(Figure 1).

Makosa Tail was discovered i

n

late

202

0

in an initial

21

RC drillholes

that targeted the

interpreted

southern

extensions of the Makosa mineralised system

(Figure 2)

.

Drilling Results

The

results are from the

exploratory RC drilling

program

at Makosa

Tai

l are shown in

Table 1 and

Figure

2

.

The full table of

results is attached in Appendix 1

.

Figure 1:

Makosa Tail

location map

HOLE

-

ID

Easting

Northing

Elevation

Length

(m)

From

(m)

To

(m)

Interval

(m)

Grade

(g/tAu)

True

Width

(m)

DTRC155

825102

1433697

205

42

17.0

22.0

5.0

11.0

4.0

DTRC155

and

25.0

32.0

7.0

0.7

5.6

DTRC156

825036

1433743

198

25

7.0

12.0

5.0

10.1

4.0

DTRC157

825011

1433758

198

60

37.0

42.0

5.0

1.1

4.0

DTRC160

825045

1433790

198

50

3.0

6.0

3.0

1.9

2.4

DTRC164

825003

1433694

198

43

15.0

23.0

8.0

1.1

6.4

DTRC165

824974

1433721

200

90

37.0

39.0

2.0

3.4

1.6

DTRC165

and

50.0

56.0

6.0

1.1

4.8

DTRC172

825150

1433844

195

106

62.0

66.0

4.0

1.8

3.2

DTRC178

824961

1433673

201

66

32.0

40.0

8.0

1.4

6.4

DTRC179

824977

1433661

202

42

9.0

12.0

3.0

1.3

2.4

DTRC181

824923

1433575

206

42

4.0

9.0

5.0

3.3

4.0

DTRC186

825213

1433983

195

90

75.0

80.0

5.0

1.9

4.0

DTRC192

825282

1434126

192

92

72.0

75.0

3.0

1.3

2.4

DTRC195

825331

1434211

189

91

61.0

63.0

2.0

3.4

1.6

DTRC197

825340

1434263

186

108

101.0

104.0

3.0

2.0

2.4

DTRC198

825382

1434367

188

92

30.0

36.0

6.0

0.8

4.8

DTRC199

825441

1434379

189

66

17.0

19.0

2.0

1.8

1.6

DTRC199

and

24.0

29.0

5.0

2.2

4.0

DTRC201

825461

1434415

189

50

26.0

28.0

2.0

2.8

1.6

DTRC201

and

31.0

39.0

8.0

0.9

6.4

Table 1: Makosa

Tail

Significant results

(0.5g/tAu lower cut off; maximum 2m internal dilution

, minimum 2m interval

)

The

follow up

RC program was completed using a

reduced

line

spacing of

50

m over Makosa Tail

.

The

program comprised 3,765m completed in 52

holes

with an average depth of

7

2

m

. The focus of the

drilling was on near

-

surface potential over the previously drilled strike length on Makosa Tail.

Drill samples were analysed by ALS laboratories in Mali using t

he AA26 fire assay method (50g

charge).

The results indicate

multiple

parallel, steep north

-

westerly dipping, mineralised horizons that are

developed within a shale/greywacke sequence. Most significant

,

is the discovery of

several higher

grade zones

towards the southern end of the drilled area where the drill coverage is wide

-

spaced.

Drillhole DTRC1

5

5

returned 5

m at

11.0

g/tAu from

1

7

m

(Figure

2

)

.

Hole

DTRC1

56

which

was drilled

on the same section as DTRC155

returned

5m at 1

0.1

g

/tAu from

7

m

.

Implications

The

Makosa Tail

drilling has intersected multiple parallel lodes over a strike length of 1,000m with a

higher grade zone potentially extend

ing

for

300m

.

Significantly, there is a 1,600m strike length between Makosa Tail and Makosa that is yet

to be drill

-

tested.

Systematic infill and step

-

out drilling is planned to fully assess the ever

-

increasing scale of the project.

Figure

2

:

Makosa

Tail

drillhole

location map

Figure

3

:

Makosa Tail Cross Section A

-

B

Qualified Person

The above

information has been prepared under the supervision of Alfred Gillman (Fellow AusIMM,

CP), who is designated as a “qualified person” under National Instrument 43

-

101 and has reviewed

and approves the content of this news release. He has also reviewed QA/QC

, sampling, analytical

and test data underlying the information.

About Thor

Thor Explorations Ltd. is a Canadian mineral exploration company engaged in the acquisition,

exploration and development of mineral properties located in Nigeria, Senegal and Burk

ina Faso. Thor

holds a 100% interest in the Segilola Gold Project located in Osun State of Nigeria and a 70% interest

in the Douta Gold Project located in south

-

eastern Senegal. Thor also holds a 49% interest in the Bongui

and Legue gold permits located in

Houndé greenstone belt, south west Burkina Faso. Thor trades on

the TSX Venture Exchange under the symbol “THX”.

THOR EXPLORATIONS LTD.

Segun Lawson

President & CEO

For further information please contact:

Thor Explorations Ltd

Email:

[email protected]

Fig House Communications (Investor Relations)

Tel: +1 416 822 6483

Email:

[email protected]

Blytheweigh

Megan Ray / Rachael Brooks

Tel: +44 207 138 3203

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this

release.

This press release does not constitute an offer to purchase securities. The securities to be offered in

the offering have not been and will not be registered under the United States Securities Act of 1933, as

amended, or any state

securities laws and may not be offered or sold in the United States or to, or for

the benefit or account of, a U.S. person, except pursuant to an available exemption from such

registration requirements.

Cautionary Note Regarding Forward

-

Looking Statements

Except for the statements of historical fact contained herein, the information presented constitutes

“forward looking statements” within the meaning of certain securities laws, and is subject to important

risks, uncertainties and assumptions that could c

ause the actual results of the Company to differ

materially f

ro

m the forward

-

looking statements. Such forward

-

looking statements, including but not

limited to, the Company’s ability to fully finance the Project, to bring the Project into operation or to

pr

oduce gold from the Project, and the use of the proceeds.

The words “may”, “could”, “should”,

“would”, “suspect”, “outlook”, “believe”, “anticipate”, “estimate”, “expect”, “intend”, “plan”, “target” and

similar words and expressions are used to identify f

orward

-

looking information. The forward

-

looking

information in this news release describes the Company’s expectations as of the date of this news

release and accordingly, is subject to change after such date. Readers should not place undue

importance on fo

rward

-

looking information and should not rely upon this information as of any other

date.

While the Company may elect to, it does not undertake to update this information at any particular

time.

Appendix 1:

Makosa

Tail

RC Drill Results

May 2021

HOLE

-

ID

Easting

Northing

Elevation

Length

(m)

From

(m)

To

(m)

Interval

(m)

Grade

(g/tAu)

True

Width

(m)

DTRC154

825065

1433715

205

99

NSR

DTRC155

825102

1433697

205

42

17.0

22.0

5.0

11.0

4.0

DTRC155

25.0

32.0

7.0

0.7

5.6

DTRC156

825036

1433743

198

25

7.0

12.0

5.0

10.1

4.0

DTRC157

825011

1433758

198

60

37.0

42.0

5.0

1.1

4.0

DTRC158

825114

1433746

205

66

NSR

DTRC159

825083

1433767

205

99

NSR

DTRC160

825045

1433790

198

50

3.0

6.0

3.0

1.9

2.4

DTRC161

825020

1433811

198

84

43.0

46.0

3.0

0.7

2.4

DTRC162

825064

1433655

204

54

NSR

DTRC163

825038

1433676

205

100

NSR

DTRC164

825003

1433694

198

43

15.0

23.0

8.0

1.1

6.4

DTRC165

824974

1433721

200

90

37.0

39.0

2.0

3.4

1.6

DTRC165

50.0

56.0

6.0

1.1

4.8

DTRC166

824960

1433790

198

114

NSR

DTRC167

825134

1433783

201

50

NSR

DTRC168

825107

1433806

199

90

NSR

DTRC169

825077

1433832

197

54

NSR

DTRC170

825045

1433858

196

60

NSR

DTRC171

825179

1433819

199

78

NSR

DTRC172

825150

1433844

195

106

62.0

66.0

4.0

1.8

3.2

DTRC173

825103

1433878

194

46

NSR

DTRC174

825170

1433884

197

108

NSR

DTRC175

825125

1433915

196

45

NSR

DTRC176

825049

1433609

208

54

NSR

DTRC177

825024

1433626

204

84

NSR

DTRC178

824961

1433673

201

66

32.0

40.0

8.0

1.4

6.4

DTRC179

824977

1433661

202

42

9.0

12.0

3.0

1.3

2.4

DTRC180

824896

1433600

207

84

NSR

DTRC181

824923

1433575

206

42

4.0

9.0

5.0

3.3

4.0

DTRC181

12.0

16.0

4.0

0.5

3.2

DTRC182

824968

1433537

209

105

NSR

DTRC183

825194

1433928

195

84

NSR

DTRC184

825220

1433907

198

48

NSR

DTRC185

825240

1433957

197

42

NSR

DTRC186

825213

1433983

195

90

75.0

80.0

5.0

1.9

4.0

DTRC187

825264

1434007

196

42

NSR

DTRC188

825231

1434031

194

96

74.0

77.0

3.0

0.9

2.4

DTRC189

825219

1434104

191

84

NSR

DTRC190

825247

1434082

192

96

NSR

DTRC191

825307

1434106

192

60

24.0

28.0

4.0

0.6

3.2

DTRC191

31.0

33.0

2.0

0.7

1.6

DTRC192

825282

1434126

192

92

72.0

75.0

3.0

1.3

2.4

DTRC192

81.0

83.0

2.0

0.5

1.6

DTRC193

825309

1434173

191

120

NSR

DTRC194

825363

1434187

189

54

NSR

DTRC195

825331

1434211

189

91

61.0

63.0

2.0

3.4

1.6

DTRC195

69.0

71.0

2.0

0.8

1.6

DTRC196

825405

1434214

190

42

NSR

DTRC197

825340

1434263

186

108

101.0

104.0

3.0

2.0

2.4

DTRC198

825382

1434367

188

92

30.0

36.0

6.0

0.8

4.8

DTRC198

56.0

58.0

2.0

0.7

1.6

DTRC199

825441

1434379

189

66

11.0

13.0

2.0

1.0

1.6

DTRC199

17.0

19.0

2.0

1.8

1.6

DTRC199

24.0

29.0

5.0

2.2

4.0

DTRC200

825417

1434397

188

84

49.0

51.0

2.0

1.1

1.6

DTRC200

62.0

65.0

3.0

0.9

2.4

DTRC201

825461

1434415

189

50

15.0

17.0

2.0

1.3

1.6

DTRC201

26.0

28.0

2.0

2.8

1.6

DTRC201

31.0

39.0

8.0

0.9

6.4

DTRC202

825388

1434475

190

117

DTRC203

825076

1433712

190

78

DTRC204

825481

1434469

190

60

DTRC205

825459

1434490

190

29