White Metal Intersects 1.5 m of 27.2 g/t Au in the A Zone and 1.5 m of 10.9 g/t Au in the D Zone, Phase 3 Drilling, Tower Mountain Gold Project, Ontario
White Metal Intersects 1.5 m of 27.2 g/t Au in
the A Zone and 1.5 m of 10.9 g/t Au in the D
Zone, Phase 3 Drilling, Tower Mountain Gold
Project, Ontario
Thunder Bay, Ontario--(Newsfile Corp. - March 22, 2022) -
White Metal Resources Corp. (TSXV: WHM)
(FSE: CGK1) (OTC Pink: TNMLF) ("White Metal" or the "Company") is pleased to announce that it has
received additional drill core assay results from its recently completed Phase 3 drilling program at its
flagship Tower Mountain Gold Project (the "Project" or "Property"), located about 50 km west-northwest
of the port city of Thunder Bay, Ontario. The D Zone is located some 500 m southeast of the A Zone and
results from the current drilling extended the A Zone by 25 m down-dip. Drilling results from C&M Zone
suggest a possible link to alteration and gold mineralization located in the areas of the D and 110 zones,
extending the strike for more than 700 m to the west. (Figure 1).
Highlights from the most recent results of Phase 3 drilling are:
TM-21-123: from 233.0 m, 10.90 g/t Au over 1.5 m (D Zone).
TM-22-128: from 30.5 m, 7.13 g/t Au over 1.5 m (C&M Zone).
TM-22-129: from 62.0 m, 5.3 g/t Au over 1.5 m (C&M Zone).
TM-22-130: from 14.0 m, 27.2 g/t Au over 1.5 m (A Zone).
TM-22-132: from 5.0 m, 5.34 g/t Au over 1.5 m (A Zone).
The Company is very pleased with the results to date as it continues to identify low-grade gold over long
core intervals and high-grade gold over narrower core intervals. Much more drilling is required to
evaluate the full potential and scale of the D, 110, C&M and A zones, as well as numerous other zones
and surface showings.
The Phase 3 drilling program was successful in testing the multitude of gold zones, expanding the
potential of the Bench Zone, and in-fill drilling between holes TM-21-120 and TM-21-121, which had
significant gold grades over substantial core lengths (
see Company news release dated September 23,
2021
).
The Ellen Zone, U&V Zone, Star Zone, H Zone, G Zone, and P Zone are still to be tested by diamond
drilling and will be the focus of future drilling programs (
see Company news release dated October 21,
2021
).
The following is a summary of the drill hole results for the holes reported in this news release with core
assay results summarized in Table 1. A plan map showing drill hole locations and traces is provided in
Figure 2. A comprehensive list of drill core assay results is provided on the Company website at
https://www.whitemetalres.com/
. Core assay intervals are calculated using a 100 ppb Au exploration cut-
off with intersection calculations terminated if two or more sampling intervals are less than 100 ppb Au.
Table 1. Summary of drill core assay results reported in this news release, Phase 3 drilling.
Drill Hole
From (m)
To (m)
Interval (m)*
Au (g/t)
Zone
TM-21-123
149.00
171.50
22.50
0.486
D
176.00
197.00
21.00
0.501
233.00
234.50
1.50
10.900
TM-21-124
89.00
102.50
13.50
0.326
TM-21-125
63.50
107.00
43.50
0.338
incl.
63.50
96.50
33.00
0.392
110
TM-21-125
131.00
152.00
21.00
0.202
TM-22-126
42.50
101.00
58.50
0.447
TM-22-126
117.50
132.50
15.00
0.887
incl.
119.00
126.50
7.50
1.484
TM-22-126
153.50
182.00
28.50
0.843
incl.
156.50
165.50
9.00
2.088
incl.
162.50
165.50
3.00
2.735
TM-22-127
113.00
150.50
37.50
0.343
C&M
incl.
119.00
128.00
9.00
0.636
TM-22-128
9.50
68.00
58.50
0.591
incl.
30.50
36.50
6.00
2.452
incl.
30.50
32.00
1.50
7.130
TM-22-129
62.00
63.50
1.50
5.300
A
TM-22-129
138.50
156.50
18.00
0.186
TM-22-130
2.50
23.00
20.50
2.269
incl.
12.50
17.00
4.50
9.520
incl.
14.00
15.50
1.50
27.200
TM-22-130
128.00
155.00
27.00
0.211
TM-22-131
2.70
20.00
17.30
0.590
incl.
5.00
6.50
1.50
1.320
incl.
14.00
20.00
6.00
0.960
incl.
18.50
20.00
1.50
1.840
TM-22-132
3.70
23.00
19.30
0.741
incl.
5.00
6.50
1.50
5.340
TM-22-132
27.50
29.00
1.50
2.460
TM-22-132
39.50
41.00
1.50
1.610
TM-22-132
45.50
57.50
12.00
1.113
incl.
47.00
56.00
9.00
1.378
incl.
53.00
54.50
1.50
2.210
TM-22-132
60.50
86.00
25.50
0.417
incl.
78.50
80.00
1.50
2.780
TM-22-132
134.00
149.00
15.00
0.317
Drill Hole
From (m)
To (m)
Interval (m)*
Au (g/t)
Zone
*drill hole intervals are not representative of true width but are core lengths.
Figure 1. Plan map of the Tower Mountain Gold Project showing some of the principal gold zones on the
western side of the TMIC.
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5364/117595_0f1f3f0424b3f975_003full.jpg
D Zone
TM-21-123 - drilled 240 m west-southwest of TM-21-95 and designed to test the down-dip
extension of the D Zone, intersecting it at a drill hole depth of 149 metres.
110 Zone
TM-21-125 - designed to test down-dip extension of the 110 Zone, intersecting this zone at 63.5
metres.
TM-22-126 - drilled 50 m northwest of TM-21-110 and intersected mineralization at a drill hole
depth of 42.5 metres.
C&M Zone
TM-22-127 - drilled 670 m west of the 110 Zone; the Company interprets gold mineralization
intersected in this hole to may be a possible strike continuation of the 110 Zone.
TM-22-128 - drilled 700 m east of TM-22-126, with gold mineralization suggesting the D Zone has
a potential strike length of 800 m and is open in all directions.
A Zone
TM-22-129 - drilled on the eastern side of the A Zone, designed to test the down-dip extension of
this of TM-21-117.
TM-22-130 - drilled 30 m southwest of TM-21-118 in the central portion of the A Zone, designed to
test the down-dip extension of this zone.
TM-22-131 - drilled from the same set up as TM-22-30 and terminated at 20 m due to bad ground,
with the last core sample assaying 1.80 g/t
Au.
TM-22-132 - drilled 30 m southwest of TM-21-117 and designed to test the down-dip extension of
TM-21-119.
Drillholes TM-22-129, 130,131 and 132 were designed to test the down-dip extension of the impressive
results from TM-21-108, 117, 118 and TM-21-119, drilled 20 to 25 m southwesterly along drill-section.
The results from the recent drilling confirm the continuation of the A Zone.
The A zone has been interpreted as the result of two major structural events. Low-grade and strongly
anomalous gold-enriched breccia structures are intersecting a later vein structural system, creating a
high-grade, very steep westerly plunging shoot. This new understanding gives exciting potential to future
definition drilling and the targeting of high-grade gold.
Like the Phase 1 and 2 drilling programs before, the Phase 3 drilling program demonstrates the
potential of the Tower Mountain Gold Project to host mineralization potentially amenable to a large, low-
grade gold open pit operation with high-grade sections that could be amendable to underground mining.
Much more drilling is required to fully understand the extent of the Project's gold zones as each round of
drilling continues to deliver new information and positive results. A summary of all results reported to
date are provided on the Company website at
https://www.whitemetalres.com/
.
Future drill core assay results will be reported as they are received, compiled, and interpreted by the
Company. Readers are also encouraged to refer to the Company's
news release dated January 11,
2022
for more specific details surrounding the Tower Mountain Gold Project and the Phase 3 drilling
program.
Figure 2. Drill hole plan map with histograms of gold concentration overlain on a 3D-IP plan map (RL
400 m) and the contact trace of the TMIC in the southern area of the main trend on the Property.
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5364/117595_0f1f3f0424b3f975_004full.jpg
It should be noted that many of the gold zone discovered to date on the Tower Mountain Gold Project,
including the newly discovered Ellen Zone, A Zone, and as well parts of the U & V Zone are associated
with magnetic lows which seem to have a direct correlation with elevated gold concentration. To date,
White Metal has covered about 60% of the Property with detailed ground magnetic survey and due to the
correlation between magnetic lows and gold, the Company is planning to complete the magnetic
surveying over the remaining 40% of the Property in the coming weeks. About 40% of the Property has
been covered by soil sampling and recent success in drilling on the C&M Zone and extensions of the
110 and D zones targeted highly anomalous gold-in-soil, obtained from the 2021 summer soil sampling
program. The number one priority will be the Star Zone where a large area of gold-in-soil anomalies
were defined during the 2021 program (see White Metal news release dated September 23, 2021). The
remainder of the Property will be covered with soil sampling in order to define new drill targets.
About the Tower Mountain Gold Project
The Tower Mountain Gold Project is located 50 km west of Thunder Bay, Ontario and consists of
unpatented and patented lands totalling 1,968 ha (19.68 square km). The Property has excellent
infrastructure and can be worked year-round with well-maintained roads and a power grid within <5
kilometres. Gold mineralization on the Property is described as intrusive-associated disseminated gold
and may have similarities to gold mines hosted in the Abitibi Greenstone Belt of northeastern Ontario,
such as in the Kirkland Lake and Malartic gold camps. One example, the Young-Davidson Mine, is
currently one of Canada's largest underground gold mines and in 2021 produced 195,000 ounces of
gold (Alamos Gold news release January 17, 2022).
Mineralization hosted by established operations and other exploration projects is not necessarily
indicative of mineralization hosted on the Company's Property.
To view additional project information and maps please visit the White Metal website and slide show at
www.whitemetalres.com/tower-mountain-au.html
. For a detailed overview of the Tower Mountain Gold
Project (Fact Sheet)
click here
. For table of results for all White Metals drill core assay results
click here
.
Qualified Person
Technical information in this news release has been reviewed and approved by Dr. Scott Jobin-Bevans
(P.Geo.), Interim President & CEO and a Director of White Metal, who is a Qualified Person under the
definitions established by NI 43-101.
About White Metal Resources Corp.
White Metal Resources Corp. is a junior exploration company exploring in Canada and southern Africa.
The Company's two key properties are the Flagship Tower Mountain Gold Project in Thunder Bay,
Ontario, Canada and the Okohongo Copper-Silver Project in Namibia, Africa. For more information
about the Company please visit
www.whitemetalres.com
.
On behalf of the Board of Directors
"
Scott Jobin-Bevans
"
Interim President & CEO, Director
For further information contact:
Scott Jobin-Bevans
White Metal Resources Corp.
684 Squier Street
Thunder Bay, Ontario, P7B 4A8
M: +1-647-405-3632
Elliot Strashin
P: +1-416-504-0077 ext 22
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
The information contained herein contains "forward-looking statements" within the meaning of
applicable securities legislation. Forward-looking statements relate to information that is based on
assumptions of management, forecasts of future results, and estimates of amounts not yet
determinable. Any statements that express predictions, expectations, beliefs, plans, projections,
objectives, assumptions or future events or performance are not statements of historical fact and may
be "forward-looking statements."
Forward-looking statements are subject to a variety of risks and uncertainties which could cause
actual events or results to differ from those reflected in the forward-looking statements, including,
without limitation: risks related to failure to obtain adequate financing on a timely basis and on
acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks
associated with mining and exploration; risks related to the maintenance of stock exchange listings;
risks related to environmental regulation and liability; the potential for delays in exploration or
development activities or the completion of feasibility studies; the uncertainty of profitability; risks and
uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits; risks related to the inherent uncertainty of production and cost estimates and the potential
for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility
that future exploration, development or mining results will not be consistent with the Company's
expectations; risks related to gold price and other commodity price fluctuations; and other risks and
uncertainties related to the Company's prospects, properties and business detailed elsewhere in the
Company's disclosure record. Should one or more of these risks and uncertainties materialize, or
should underlying assumptions prove incorrect, actual results may vary materially from those
described in forward-looking statements. Investors are cautioned against attributing undue certainty to
forward-looking statements. These forward-looking statements are made as of the date hereof and the
Company does not assume any obligation to update or revise them to reflect new events or
circumstances. Actual events or results could differ materially from the Company's expectations or
projections.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/117595