Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TGOL.V ·

Thunder Gold Identifies New Gold Discovery At Tower Mountain Property, Shebandowan Greenstone Belt, Ontario.

Drill Results

Thunder Gold Identifies New Gold Discovery

At Tower Mountain Property, Shebandowan

Greenstone Belt, Ontario.

Thunder Bay, Ontario--(Newsfile Corp. - April 20, 2026) - Thunder Gold Corp. (TSXV: TGOL) (FSE: Z25)

(OTCQB: TGOLF) ("

Thunder Gold

" or the "

Company

") is pleased to announce initial drill results from

the 2026 drill program at

the Company's flagship Tower Mountain Property in the Shebandowan

Greenstone Belt, 40 kilometres west of the international port city of Thunder Bay, Ontario.

Drilling at the 'Star Target', approximately 500 metres west of the current optimized pit limit that defines

the current Mineral Resource Estimate ("MRE"), has identified at-surface gold grades over significant

interval lengths. The Company wishes to acknowledge that funding received from the Ontario Junior

Exploration Program ("OJEP") directly led to this new discovery.

Highlights:

New discovery 500 metres west of the current optimized pit constraining the Company's

current MRE.

TM26-193 intersected 73.5 metres averaging 0.364 g/t Au;

including 16.5 metres averaging 0.779 g/t Au.

TM26-194 intersected 35.5 metres averaging 0.513 g/t Au;

including 15.0 metres averaging 0.832 g/t Au.

TM26-197 intersected 13.5 metres averaging 0.366 g/t Au;

including 7.5 metres averaging 0.572 g/t Au.

The Star Target lies within an approximately 200-metre-wide, east-northeast ("ENE") trending

Timiskaming conglomerate unit that has been mapped over 5.0 kilometres, from Bateman Lake to the

UV target, west of the Tower Mountain Intrusive Complex ("TMIC") (Reference Figure 1).

Wes Hanson P.Geo., President and CEO states

: "The Star Target results, considered with those at

Bateman Lake, 3.0 kilometres to the southwest, suggest potential for additional resource growth within

Timiskaming conglomerate in both the original Tower Mountain claims as well as the recently

optioned Electra block to the west. Grades and interval lengths are identical to those observed along

the western TMIC contact hosting the current mineral resource for the property.

This new trend doubles our target opportunities within a 5-kilometre radius of Tower Mountain. The

result is a tight, manageable, land position with a current resource and multiple gold showings offering

opportunity for future resource growth. A fully funded drill program is underway to upgrade 'inferred'

resources to the 'indicated' classification through infill drilling within the optimized resource pit limit. It's

encouraging that our recent property deals offer both space for future development as well as

demonstrated discovery potential. Drilling from this point forward will focus on resource conversion as

planned, with the majority of the 15,000 metres limited to the interior of the optimized pit shell defining

the mineral resource."

Star Target

The Star target occurs in a 200-metre-wide Timiskaming conglomerate unit that has been mapped for

over 5 kilometres from Bateman Lake to the northern edge of the TMIC. The conglomerate overlies the

interpreted trace of the Thunder Lake Fault ("TLF"). Several gold occurrences have been identified along

the TLF trend. Prospecting by Hemlo Gold Mines ("Hemlo") in 1996 returned gold grades up to 82.50 g/t

Au around Bateman Lake (Reference Figure 1). Follow-up trenching returned intervals of 13.0 metres

averaging 0.527 g/t Au and 11.0 metres averaging 0.198 g/t Au from Timiskaming conglomerate. Hemlo

drilled a single hole under the higher-grade trench intercept intersecting 9.8 metres averaging 0.255 g/t

Au interval.

In 1997, Avalon Ventures ("Avalon") drilled two holes along the TLF trend. One hole intersected 83.5

metres averaging 0.24 g/t Au, including an interval of 10.5 metres that averaged 0.621 g/t Au.

Avalon also completed a drill hole within the Tower Mountain claim block, approximately 250 metres east

of the Star target. This hole intersected 16.0 metres of 0.82 g/t Au.

The grades and intervals reported all exceed the 0.19 g/t Au cut-off grade estimated for the recent MRE.

Figure 1 - Tower Mountain Property - Star Target Location

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5364/293171_ea6cf7dc1487896c_001full.jpg

Sources of Historical Information in Figure 1.

Province of Ontario, Ministry of Energy and Mines, Assessment File Database, File 52A12SE0001 A

Report on Geological, Geochemical and Physical Work Completed on the Conmee-Kwiatkowski

Property, Conmee & Horne Townships, Thunder Bay Mining District, Andrew Tims, Hemlo Gold Mines

Inc. 1996

Province of Ontario, Ministry of Energy and Mines, Assessment File Database, File 52A12SE0005

DDH LOG 97-1; DDH LOG 97-2; Appendix 4 Assay Certificates.

Province of Ontario, Ministry of Energy and Mines, Assessment File Database, File 20000021502

Electra Nickel Property, Adrian, Conmee and Horne Townships, Ontario, Canada, R. Campbell, P.Geo.,

M. St-Pierre, P.Geo, May 10, 2023.

Tables 1 and 2 provide the collar location, bearing, dip, total depth and significant results of the five

holes drilled at the Star Target.

Table 1. Star Target - Drill Hole Locations

Hole ID

Easting

Northing

Elev

Bearing

Dip

Depth

(masl)

(°)

(°)

(m)

TM26-193

299321

5377916

430

150

-50

150

TM26-194

299321

5377916

430

320

-50

150

TM26-195

299069

5377960

475

140

-50

150

TM26-196

299069

5377960

475

320

-50

150

TM25-197

299396

5377649

400

140

-50

150

NAD83 UTM Zone 16N

Table 2. Star Target - 2026 Drill Results

Hole ID

From

To

Interval

Grade

True Width

(m)

(m)

(m)

(Au g/t)

(m)

TM26-193

4.50

78.00

73.50

0.364

unknown

includes

27.00

43.50

16.50

0.779

unknown

includes

52.50

78.00

25.50

0.344

unknown

TM26-194

2.50

38.00

35.50

0.513

unknown

includes

2.50

17.50

15.00

0.832

unknown

TM26-195

No Significant Values

TM26-196

No Significant Values

TM25-197

61.00

74.50

13.50

0.366

unknown

includes

61.00

68.50

7.50

0.572

unknown

Holes TM26-193 and 194 targeted a cluster of surface rock samples collected in 2025 by Thunder Gold

field personnel. The target also featured a small gold in soil anomaly identified by 2025 soil geochemical

sampling. The rock and soil anomalies are located at the eastern end of a strong magnetic low

(Reference Figure 2). It is not clear at this time whether the mineralization encountered in holes TM26-

193 and 194 is sub-parallel to topography or if it is a vertical dipping system (Reference Figure 3).

Regardless, the mineralization outcrops to surface and offers an average grade higher than the current

cut-off grade defining the MRE.

Holes TM26-195 and 196 tested a moderate gold in soil anomaly coincident with the interpreted contact

of the Timiskaming conglomerate with intrusive feldspar porphyry to the north. The intrusive rocks offer a

strong magnetic response. The bottom of TM26-195 returned elevated gold grades within Timiskaming

conglomerates, possibly indicating that the hole stopped short of the mineralization observed in the initial

drill holes. TM26-196 collared in and remained in weakly mineralized, massive feldspar porphyry.

Hole TM26-197 tested a second cluster of elevated gold in rock results along the western boundary of

the original Tower Mountain property. An interval of 13.5 metres averaging 0.366 metres was intersected

by this hole, vertically under the targeted rock anomaly.

Figure 2 - Star Target Drill Plan

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5364/293171_ea6cf7dc1487896c_002full.jpg

Figure 3 - Star Target Cross Section of Holes TM26-193 and TM26-194

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5364/293171_ea6cf7dc1487896c_003full.jpg

Exploration at the Star target was funded, in part, through the Ontario Junior Exploration Program.

Tower Mountain Property Highlights

January 2026 Mineral Resource Estimate as summarized in Table 3;

All-in discovery cost of C$3.95 per inferred resource ounce;

Year-round paved highway access;

40 kilometres from the port of Thunder Bay, Ontario;

Road, rail and hydro at property boundary;

15,000-metre resource definition drill program in progress.

Table 3.

Tower Mountain Mineral Resource Estimate - January 19, 2026

Category

Tonnage

(Mt)

Grade

(g/t Au)

Contained Metal

('000 oz gold)

Indicated

34.5

0.46

514

Inferred

211.1

0.45

3,053

Notes:

1

.

The effective date of this MRE is January 19, 2026.

2

.

Messrs. William Lewis, P.Geo., Charley Murahwi, P.Geo., FAusIMM, and Tudorel Ciuculescu, P.Geo. from Micon International Limited are the

Qualified Persons (QPs) responsible for this MRE.

3

.

The MRE has been classified in the Indicated and Inferred categories. At this time, there are no Measured resources at the Tower Mountain

Project.

4

.

The calculated gold cut-off grade is 0.19 g/t Au.

5

.

An average specific gravity (SG) value of 2.77 g/cm

3

was used.

6

.

The MRE used economic assumptions for open pit mining. The following economic parameters were used for generating the cut-off grade: a

gold price of US$3,000/oz, 80% recovery, open pit mining cost of US$3.0/t, processing costs of US$8.0/t, general and administration cost of

US$3.5/t, transportation cost of US$2.5/oz of gold, and a royalty of 3%.

7

.

The open pit used slope angles of 30° in overburden and 50° in fresh rock.

8

.

The block model is orthogonal and has a parent block size of 5 m x 5 m x 5 m, with minimum sub-block size of 2.5 m x 2.5 m x 2.5 m.

9

.

The open pit optimization used a re-blocked size of 10 m x 10 m x 10 m.

10

.

The mineral resources described above have been prepared in accordance with the current Canadian Institute of Mining, Metallurgy and

Petroleum Standards and Practices.

11

.

Numbers have been rounded to the nearest million tonnes and nearest thousand ounces. Differences may occur in totals due to rounding.

12

.

Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of reported

Inferred Mineral Resources are uncertain in nature and there has been insufficient exploration; however, it is reasonably expected that a

significant portion of Inferred Mineral Resources could be upgraded into Indicated Mineral Resources with further exploration.

13

.

Micon QPs have not identified any legal, political, environmental, or other relevant factors that could materially affect the potential

development of the mineral resources and of the estimate.

Quality Assurance and Quality Control

Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it

is, photographed, logged for geotechnical, physical properties and geological data. Samples are

identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited

laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically

employed, varying only at major lithological contacts.

Certified standards and blanks are randomly inserted into the sample stream and constitute

approximately 10% of the sample stream.

Certified standards and blank performance is monitored with

any failures evaluated and investigated to determine if said failure is a result of error during submission.

Any unexplained failures are identified and the five samples preceding and following the failure are re-

assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The

duplicate pulps are sent to a second independent analytical facility for analyses.

Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent

analytical service provider.

AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent

analytical facility.

Samples are, received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and

pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion (FA) with an

atomic absorption (AAS) finish. All assay results greater than 5.0 g/t Au are re-assayed using a

gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a

representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149

µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of

each size fraction.

Qualified Person

Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo.,

President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established

by NI 43-101.

About the Tower Mountain Gold Property

The 100%-owned Tower Mountain Gold Property is located adjacent to the Trans-Canada highway,

approximately 40-km west of Thunder Bay, Ontario. The 6,700-hectare property surrounds the largest,

exposed, intrusive complex in the eastern Shebandowan Greenstone Belt where most known gold

occurrences have been described as occurring either within, or proximal to, intrusive rocks. Gold at

Tower Mountain is localized within extremely altered rocks parallel to the western contact of the intrusive

center. Drilling has established anomalous gold extending out from the intrusive contact for over 500

metres along a 1,500-metre strike length, to depths of over 500 metres from surface. The remaining

75% of the perimeter surrounding the intrusion shows identical geology, alteration, and geophysical

response, offering a compelling exploration opportunity.

About Thunder Gold Corp.

Thunder Gold Corp. is a junior exploration company focused on gold discovery in Canada. For more

information about the Company please visit:

www.thundergoldcorp.com

.

On behalf of the Board of Directors,

Wes Hanson, P.Geo., President and CEO

For further information contact:

Wes Hanson, CEO

(647) 202-7686

[email protected]

Bryan Baritot, Investor Relations

[email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER

(AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE)

ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains "forward-looking information" and "forward-looking

statements" within the meaning of applicable securities legislation (collectively, "forward-looking

statements"). Forward-looking statements relate to information that is based on assumptions of

management, forecasts of future results, and estimates of amounts not yet determinable. All

statements, other than statements of historical fact, are forward-looking statements and are based on

predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date

of this news release, including without limitation; anticipated results of geophysical drilling programs,

geological interpretations and potential mineral recovery. Any statement that involves discussions

with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future

events or performance (often but not always using phrases such as "expects", or "does not expect", "is

expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts",

"estimates", "believes" or "intends" or variations of such words and phrases or stating that certain

actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved)

are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause

actual events or results to differ from those reflected in the forward-looking statements, including,

without limitation: risks related to failure to obtain adequate financing on a timely basis and on

acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks

associated with mining and exploration; risks related

to the maintenance of stock exchange listings;

risks related to environmental regulation and liability; the potential for delays in exploration or

development activities or the completion of feasibility studies; the uncertainty of profitability; risks and

uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral

deposits; risks related to the inherent uncertainty of production and cost estimates and the potential

for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility

that future exploration, development or mining results will not be consistent with the Company's

expectations; risks related

to the gold price and other commodity price fluctuations; and other risks

and uncertainties related to the Company's prospects, properties and business detailed elsewhere in

the Company's disclosure record. Should one or more of these risks and uncertainties materialize, or

should underlying assumptions prove incorrect, actual results may vary materially from those

described in forward-looking statements. Investors are cautioned against attributing undue certainty or

reliance on forward-looking statements. These forward-looking statements are made as of the date

hereof and the Company does not assume any obligation to update or revise any forward-looking

statements, other than as required by applicable law, to reflect new information, events or

circumstances, or changes in management's estimates, projections or opinions. Actual events or

results could differ materially from those anticipated in the forward-looking statements or from the

Company's expectations or projections.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/293171