Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TERA.CN ·

Terra Balcanica Drills 499 G/T Ageq over 3.8 M at Cumavici Ridge IN Bosnia and Herzegovina and Closes Private Placement Financing

Financings Drill Results

NOT FOR DISTRIBUTION TO THE U.S. NEWSWIRE OR FOR DISSEMINATION IN THE UNITED STATES

TERRA BALCANICA DRILLS 499 G/T AGEQ OVER 3.8 M AT CUMAVICI RIDGE IN

BOSNIA AND HERZEGOVINA AND CLOSES PRIVATE PLACEMENT FINANCING

Vancouver, British Columbia – 17th January, 2024 – Terra Balcanica Resources Corp. (“Terra”

or the “ Company”) ( CSE:TERA; F RA:UB1) is pleased to announce additional assay results

from the 2023 Phase II drill campaign confirming continuation of the high-grade Cumavici Ridge

polymetallic mineralization within its flagship Viogor-Zanik project in Bosnia and Herzegovina.

The Company further announces closing of the final tranche of its non-brokered private placement

financing (the “Offering”) of shares (the ”Shares”) for total gross proceeds of $212,200.

Highlights

• Drillhole CMV23002b intersected 499 g/t AgEq over 3.8 m from 22 m downhole with a

further mineralized interval of 227 g/t AgEq over 2.0 m from 31 m (Table 1);

• Drillhole collar for CMV23002b is located 39 m northeast of previously reported CMV23003

and 004 and 38 m SE of 2022 drillhole CMVDD001 which returned:

o CMVDD001 – 824 g/t AgEq over 4 m (see company news release dated 8 th

September, 2022);

o CMV23003 – 457 g/t AgEq over 4.15 m;

o CMV23004 – 1168 g/t AgEq over 1.35 m;

• The mineralization remains open immediately northwest and down-dip to the southwest;

Terra Balcanica CEO, Dr. Aleksandar Mišković, comments: “We are delighted to continue

reporting impressive silver grades from the central Cumavici Ridge system. This polymetallic,

near-surface target keeps on delivering and is open along strike and down-dip. Cumavici Ridge is

only one of five target zones along the 7.2 km NW-SE trending fault-hosted system that remains to

be drilled, thus offering upside to advance a deposit immediately adjacent to the existing Sase Pb-

Zn-Ag mine with infrastructure including mining and processing facilities. We are excited to

continue advancing Viogor-Zanik’s full potential as a unique critical raw minerals land package

right at Europe’s doorsteps. Additional assay results will continue to be released very shortly.”

Hole ID From

(m)

To

(m)

Length

(m)

Ag

(g/t)

Au

(g/t)

Pb

(%)

Sb

(%)

Zn

(%)

AgEq

(g/t)

CMV23002b 22.00 25.80 3.80 125 0.70 2.72 0.48 5.53 499

CMV23002b 31.00 33.00 2.00 166 0.57 0.11 0.12 0.21 227

Table 1. Assay results from drillhole CMV23002b of the Phase II drilling campaign . Interval lengths

reported are drilled lengths, not true widths. Silver equivalent s (“AgEq”) are based on assumed metal

prices of US$1,9 80/oz for gold (Au), US$23/oz for silver (Ag), US$1. 15/lb for zinc (Zn), US$ 5.42/lb for

antimony (Sb) and US$1.00/lb for lead (Pb). Assumed metal recoveries of 90% Au, 93% Ag, 95% Sb, 94%

Pb and Zn are based on published metallurgical tests on analogous intermediate sulphidation epithermal

vein deposits.

Figure 1. Geological map illustrating the drillholes at the Cumavici Ridge locality. AgEq values are

labelled for selected 2022 and 2023 drill intercepts (See Company’s new releases dated 13 November 2023,

27 February 2023). Current drilling efforts confirm mineralization over 82 m NW/SE strike length.

(WGS84/UTM Zone 34N (click here to view image).

Hole ID Easting Northing Elevation

(m) Dip Azimuth Depth

(m)

Recovery

(%)

CMV23002b 360224.6 4888498.1 594.58 -50 050 56.2 99

Table 2. Collar locations for reported P hase II drillhole. Coordinates and elevation were taken by local

consultant surveyors using a differential GPS unit. (WGS84/UTM Zone 34N).

Future Exploration Program

Further drilling efforts at Cumavici Ridge will aim to connect the shallow high -grade interval

reported in this release to the 531 g/t AgEq over 0.75 m and 355 g/t AgEq over 1.10 m reported

over 600 m to the northwest (see Company news release dated 5th November 2023). The system

remains untested and open to the southwest down-dip which will also be targeted in 2024 drilling.

Figure 2. Drillhole section through step out drill fence located 42 m SE of the 2022 discovery holes at

Cumavici Ridge. Assay interval reported for CMV23002b (click here to view image).

QAQC

Half core (PQ3 and HQ3) samples were delivered by truck to ALS Bor, Serbia for sample

preparation and analysis at the ALS laboratory Loughrea, Ireland an ISO/IEC 17025:2017 certified

testing laboratory. Sample preparation PREP -31BY method was used on all core samples. This

involves crushing to 70% less than 2 mm, rotary split 1kg and pulverizing the split to greater than

85% passing 75 microns. Gold was assayed by 30g fire assay with ICP -AES finish (Au-ICP21).

Analyses of silver and base metals were completed by highly oxidising digestion with HNO 3,

KClO3 and HBr (ASY-ORE) and the final solution in dilute aqua regia is determined by ICP-AES

(ME-ICPORE). Control samples, comprising certified reference materials (CDN -ME-1811),

quarter core field duplicates and blanks were inserted at a rate of 9 % and investigated as part of

the company’s quality assurance and quality control program.

Final Tranche of Private Placement Financing Closed

The Company issued an additional aggregate of 1,200,000 Shares at a price of $0.04 per Share for

gross proceeds of $48,000 pursuant to the Offering announced on December 1st, 2023.

In total, the Company has issued 5,305,000 Shares at a price of $0.0 4 for gross proceeds of

$212,200. Terra will use the net proceeds of the Offering for working capital and to finance the

acquisition of a strategic mineral exploration licence in Bosnia and Herzegovina . Pursuant to

applicable Canadian securities laws, all securities issued and issuable in connection with the

closing of the final tranche of the Private Placement will be subject to a four (4) month hold period

ending May 17th, 2024. There were no finders’ fees paid in any of the tranches of the Offering.

This news release does not constitute an offer to sell or a solicitation of an offer to sell any of the

securities in the United States. The securities have not been and will not be registered under the

United States Securities Act of 1933, as amended (the “U.S. Securities Act”) or any state securities

laws, and may not be offered or sold within the United States, or to or for the account or benefit

of any U.S. person or any person in the United States, unless registered under the U.S. Securities

Act and applicable state securities laws or an exemption fro m such registration is available.

“United States” and “U.S. Person” are as defined in Regulation S under the U.S. Securities Act.

Qualified Person

Dr. Aleksandar Mišković, P.Geo, is the Company’s designated Qualified Person for this news

release within the meaning of National Instrument 43 -101 Standards of Disclosure of Mineral

Projects (“NI 43-101”) and has reviewed and validated that the information contained in this news

release as accurate.

About the Company

Terra Balcanica is a polymetallic exploration company targeting large -scale mineral systems in

the Balkans of southeastern Europe. The Company has 90% interest in the Viogor -Zanik Project

in eastern Bosnia and Herzegovina, 100% of the Kaludra and Ceovishte mineral exploration

licences in southern Serbia. The Company emphasizes responsible engagement with local

communities and stakeholders. It is committed to proactively implementing Good International

Industry Practice (GIIP) and sustainable health, safety, and environmental management.

ON BEHALF OF THE BOARD OF DIRECTORS

Terra Balcanica Resources Corp.

“Aleksandar Mišković”

Aleksandar Mišković

President and CEO

For further information, please contact Alex Mišković at [email protected], or

visit our website at www.terrabresources.com.

Cautionary Statement

This news release contains certain forward -looking information and forward-looking statements

within the meaning of applicable securities legislation (collectively “ forward-looking

statements”). The use of any of the words “will”, “intends” and similar expressions are intended

to identify forward- looking statements. These statements involve known and unknown risks,

uncertainties and other factors that may cause actual results or events to differ materially from

those anticipated in such forward-looking statements. Such forward-looking statements should not

be unduly relied upon. Actual results achieved may vary from the information provided herein as

a result of numerous known and unknown risks and uncertainties and other factors. The Company

believes the expectations reflected i n those forward- looking statements are reasonable, but no

assurance can be given that these expectations will prove to be correct. The Company does not

undertake to update these forward-looking statements, except as required by law.