TDG GOLD Corp. Reports High Grade GOLD & Silver Samples from Shasta Jm Zone Pit, Toodoggone, B.c.
1
TDG Gold Corp.
Unit 1 - 15782 Marine Drive
White Rock, B.C. V4B 1E6
www.tdggold.com
TDG GOLD CORP. REPORTS HIGH GRADE GOLD & SILVER SAMPLES FROM SHASTA JM ZONE PIT, TOODOGGONE, B.C.
White Rock, British Columbia, December 20, 2021. TDG Gold Corp. (TSXV: TDG) (the “Company” or “TDG”) is
pleased to report the preliminary assay results from sampling of its former producing JM Zone pit at Shasta.
Assay results from chip samples within the exposed JM Zone pit show a mineralized halo surround ing higher
grade pods of quartz carbonate breccia that was left unmined. The JM Zone pit is located ~100 metres southeast
of the Creek Zone pit from which TDG reported similar high grade gold and silver chip sample results (see TDG’s
December 16, 2021 news release). Chip samples were taken along ~58 metres (“m”) of the stockwork body at
regular intervals around the 3-sided perimeter of the JM Zone pit. The samples are not representative of true
width of the breccia body. Chip sample results include up to 7.59 grams per tonne (“g/t”) gold (“Au”) with 373
g/t silver (“Ag”), and 7.03 g/t Au with 2 g/t Ag - see Table 1 below for chip sample highlights.
Figure 1. Showing the location of the JM Zone at Shasta. The exposed pit is located above
the historical workings marked on the map. The orange rectangle represents the focus of
drilling and resource modelling activity at Shasta in 2021.
Table 1. Showing JM Zone Creek Pit chip sample highlights.
Sample ID Au (g/t) Silver (g/t)
SH21-JM01 1.03 133
SH21-JM02 2.22 209
SH21-JM03 1.51 223
SH21-JM04 1.28 203
SH21-JM05 2.61 279
SH21-JM20 7.59 373
SH21-JM30 7.03 2
SH21-JM42 3.01 78
SH21-JM48 1.12 39
2
TDG Gold Corp.
Unit 1 - 15782 Marine Drive
White Rock, B.C. V4B 1E6
www.tdggold.com
Image 1. Showing the location of the Shasta JM Zone pit and Creek Zone pit – looking approximately south-southwest.
Image 2. Shows the location of the sampling over an approximate distance of ~58 m. Samples taken at approximately one metre
intervals from right to left in the image above and numbered accordingly.
Creek Pit- Shasta Deposit
JM Pit- Shasta Deposit
Altered Volcanics with Porphyry-style
veining and Mineralization
Quartz-Carbonate
Stockwork (JM Ore Body)
~100 metres
3
TDG Gold Corp.
Unit 1 - 15782 Marine Drive
White Rock, B.C. V4B 1E6
www.tdggold.com
Table 2: full list of samples from the quartz-carbonate zone – see Image 2 (above).
Sample ID Au (ppm) Silver (ppm)
SH21-JM01 1.03 133
SH21-JM02 2.22 209
SH21-JM03 1.51 223
SH21-JM04 1.28 203
SH21-JM05 2.61 279
SH21-JM06 0.24 34
SH21-JM07 0.09 7
SH21-JM08 0.07 20
SH21-JM09 0.53 59
SH21-JM10 0.40 45
SH21-JM11 0.30 25
SH21-JM12 0.37 46
SH21-JM13 0.48 26
SH21-JM14 0.73 47
SH21-JM15 1.03 11
SH21-JM16 0.57 22
SH21-JM17 0.96 39
SH21-JM18 0.25 11
SH21-JM19 0.65 36
SH21-JM20 7.59 373
SH21-JM21 0.38 36
SH21-JM22 0.15 9
SH21-JM23 0.24 9
SH21-JM24 0.37 13
SH21-JM25 0.31 17
SH21-JM26 0.33 30
SH21-JM27 0.19 14
SH21-JM28 0.18 16
SH21-JM29 0.17 12
SH21-JM30 7.03 2
SH21-JM31 0.16 10
SH21-JM32 0.19 17
SH21-JM33 0.19 17
SH21-JM34 0.25 17
SH21-JM35 0.39 24
SH21-JM36 0.54 42
SH21-JM37 0.56 24
SH21-JM38 0.68 40
SH21-JM39 0.24 11
SH21-JM40 0.14 10
SH21-JM41 0.13 6
SH21-JM42 3.01 78
SH21-JM43 0.46 19
SH21-JM44 0.22 9
SH21-JM45 0.18 9
SH21-JM46 0.15 5
SH21-JM47 0.40 26
SH21-JM48 1.12 39
SH21-JM49 0.40 10
SH21-JM50 <0.01 <1
SH21-JM51 0.18 8
SH21-JM52 0.07 5
SH21-JM52 0.53 4
SH21-JM53 0.13 5
SH21-JM54 0.05 4
4
TDG Gold Corp.
Unit 1 - 15782 Marine Drive
White Rock, B.C. V4B 1E6
www.tdggold.com
SH21-JM55 0.08 4
SH21-JM56 0.21 32
SH21-JM57 0.20 11
SH21-JM58 0.05 4
QA/QC
Samples for the Shasta 2021 drill program followed chain of custody between collection, processing and delivery
to an SGS laboratory in Burnaby, B.C. The samples were collected directly by TDG geologists or geological
contractors and taken to the core shack at TDG’s Baker Mine site. Geological material was t hen processed by
geologists who inserted certified reference materials into the sampling sequence (when/where appropriate).
Samples were placed in zip -tied polyurethane bags, then in security -sealed rice bags before being delivered
directly from the Baker Mine site to Bandstra Transportation Systems in Prince George, B.C., and ultimately to
SGS laboratory Burnaby, B.C , or delivered from source to destination directly by TDG staff or contractors .
Samples were prepared for analysis according to SGS method PRP89: dry samples to 105°C, crush to 75 % passing
2 mm, split 250 g, pulverize 85 % passing 75 microns.
Gold was tested by fire assay with ICP-OES finish on a 50-gram nominal sample (method GE_FAI30V5). Method
GE_FAI50V10 (ore grade geochemistry) has an upper detection limit of 100 ppm (100 g/t). Silver was tested by
digesting at least 0.5 g sample in multi- acid (four acid) followed by an ICP -OES finish (method GE_ICP40Q12).
Method GE_ICP40Q12 has an upper detection limit of Ag of 100 ppm (100 g/t), and any overlimit samples are
being subsequently run with method GE_ICM40Q12 that has an upper detection of 0.1 % (1,000 g/t).
Quality assurance and control (“ QAQC”) is maintained internally at the lab through rigorous use of internal
certified reference materials, blanks, and duplicates. An additional QAQC program was administered by TDG
Gold through the use of certified reference materials (“CRMs”) that were blindly inserted into the sample batch.
If a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed
necessary, the samples that were tested in the bat ch with the failed QAQC sample are re -tested. For the
purposes of this news release, results are ‘ preliminary’ and despite having undergone rigorous internal SGS
QAQC (returning ‘final’ results), TDG has not completed its DQA investigations at this time.
Qualified Person
The technical content of this news release has been reviewed and approved by Steven Kramar, MSc., P.Geo., a
qualified person as defined by National Instrument 43-101.
About TDG Gold Corp.
TDG is a major mineral claim holder in the historical Toodoggone Production Corridor of north-central British
Columbia, Canada, with over 23,000 hectares of brownfield and greenfield exploration opportunities under
direct ownership or earn-in agreement. TDG’s flagship projects are the former producing, high-grade gold-silver
Shasta, Baker and Mets mines, which are all road accessible, produced intermittently between 1981-2012, and
have over 65,000 m of historical drilling. In 2021, TDG has advanced the projects through compilation of
historical data, new geological mapping, geo chemical and geophysical surveys, and, for Shasta, drill testing of
the known mineralization occurrences and their extensions. The Company has entered into a binding agreement
to acquire the Nueva Esperanza silver- gold advanced exploration and development project located in the
Maricunga Belt of northern ch ile, subject to closing conditions being satisfied. TDG currently has 74,842,903
common shares issued and outstanding.
5
TDG Gold Corp.
Unit 1 - 15782 Marine Drive
White Rock, B.C. V4B 1E6
www.tdggold.com
ON BEHALF OF THE BOARD
Fletcher Morgan
Chief Executive Officer
For further information contact:
TDG Gold Corp.,
Telephone: +1.604.536.2711
Email: [email protected]
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release contains forward looking statements within the meaning of applicable securities laws. The use
of any of the words “ambition”, “estimate”, “concluded”, “offers”, “objective”, “may”, “will”, “should”,
“potential” and similar expressions are intended to identify forward looking statements. In particular, this news
release contains forward looking statements concerning the completion of the Acquisition, the completion of SR
Offering and the Offering, the intended uses of the proceeds of the Offering, regulatory acceptance of the
Acquisition, the SR Offering and the Offering, and the potential development of the Project and the Company’s
existing mineral properties, including the completion of feasibility studies or the making of production decisions
in respect thereof. Although the Company believes that the expectations and assumptions on which the forward
looking statements are based are reasonab le, undue reliance should not be placed on the forward looking
statements because the Company cannot give any assurance that they will prove correct. Since forward looking
statements address future events and conditions, they involve inherent assumptions, risks and uncertainties.
Actual results could differ materially from those currently anticipated due to a number of assumptions, factors
and risks. These assumptions and risks include, but are not limited to, assumptions and risks associated with the
completion of other conditions precedent to the Acquisition, including the receipt of regulatory approvals, the
state of equity financing markets, and results of future exploration activities by the Company. Management has
provided the above summary of risks and assumptions related to forward looking statements in this news release
in order to provide readers with a more comprehensive perspective on the Company’s future operations. The
Company’s actual results, performance or ach ievement could differ materially from those expressed in, or
implied by, these forward looking statements and, accordingly, no assurance can be given that any of the events
anticipated by the forward looking statements will transpire or occur, or if any of them do so, what benefits the
Company will derive from them. These forward looking statements are made as of the date of this news release,
and, other than as required by applicable securities laws, the Company disclaims any intent or obligation to
update publicly any forward looking statements, whether as a result of new information, future events or results
or otherwise.