Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

TCO.V ·

Transatlantic Announces Maiden Technical Report and Exploration Target for Monitor Copper Gold Project Three Copper Siderite Vein Exploration Targets Established Phased Development Strategy Targets Bulk Sample Potential

Technical Reports (NI 43-101) Exploration Programs Metallurgy & Processing

Transatlantic Mining Corp. | Suite 400 | 837 West Hastings Street | Vancouver | Canada

V6C 3N6 T 604-630 7296 | F 604-357 1139| www.transatlanticminingcorp.com

Transatlantic Announces Maiden Technical Report and Exploration

Target for Monitor Copper Gold Project

Three Copper Siderite Vein Exploration Targets Established Phased Development Strategy Targets

Bulk Sample Potential

Vancouver, B.C., December 1, 2025 - Transatlantic Mining Corp. (TSX-V: TCO) (the "Company")

is pleased to announce the completion and filing of its maiden NI 43-101 technical report for

the Monitor Copper Project, an 80% -owned joint venture property located in Shoshone

County, Idaho and Mineral County, Montana.

Highlights:

• Initial NI 43-101 technical report establishes Exploration Targets for three copper siderite

vein systems.

• 2015 drilling by Transatlantic confirmed copper, silver, and gold mineralization with

intercepts up to 1.87% Cu over 0.8m and 71.5 g/t Ag over 0.3m

• Grab samples near Monitor shaft returned 57.7 g/t Ag, 15.4 g/t Au, and >1% Cu

• Combined Exploration Target ranges from 1,200,000 to 2,900,000 tonnes with grades of

1.2-3.5% copper, with further potential for silver and gold credits. Historical mined grades

are well in excess of the Combined Exploration Target.

The potential quantity and grade of the Exploration Target are conceptual in nature. There has been insufficient

exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a

Mineral Resource.

• Project located in the Coeur d'Alene Mining District with road access

• Phased development strategy prioritizes underground drilling with the option of bulk

sampling over the more expensive surface drilling

• St. Lawrence tunnel confirmed structurally sound for 120 meters, enabling a cost-

effective underground exploration platform

"We're extremely pleased with this maiden technical report. Our surface sampling and

drilling has confirmed attractive copper grades with precious metal credits on the property.

This leads into the next phase plan to access into historical underground workings, enabling

more c ost-effective drill sampling and the option for a bulk mine sample," said Bernie

Sostak, CEO of Transatlantic Mining Corp. "Rather than spending heavily on surface

drilling in the mountain terrain, we're leveraging on underground acces s to efficiently

evaluate the deposit through drilling from underground access. This approach de-risks the

project while providing valuable metallurgical data."

Transatlantic Mining Corp. | Suite 400 | 837 West Hastings Street | Vancouver | Canada

V6C 3N6 T 604-630 7296 | F 604-357 1139| www.transatlanticminingcorp.com

Exploration Target

The technical report, prepared by Ethos Geological, represents the Company's first NI 43-101

report for the Monitor Project and details the potential of three exploration targets on the

property: the Monitor, Richmond, and Big Elk copper siderite vein syst ems. These steeply-

dipping fissure veins exhibit characteristics consistent with known copper veins throughout

the Coeur d'Alene Mining District.

The potential quantity and grade of the Exploration Target are conceptual in nature. There has

been insufficient exploration to estimate a Mineral Resource and it is uncertain if further

exploration will result in the estimation of a Mineral Resource.

Table 1: Exploration Target Summary

Vein System Tonnage (tonnes) Copper (%) Silver (g/t) Gold (g/t)

Monitor 550,000 - 1,300,000 1.5 - 2.5 3.5 – 7.5 0.8 – 4.2

Richmond 550,000 - 1,400,000 1.2 - 2.0 4.0 – 8.7 1.0 – 5.5

Big Elk 70,000 - 190,000 2.0 - 3.5 3.0 – 6.5 1.5 – 3.5

The Exploration Target is based on mapped structure lengths from surface workings and

historical reports (Monitor: 488m, Richmond: 1,158m, Big Elk: 305m), documented vein

widths from the 1923 Hershey and Umpleby geological reports, and down-dip extensions to

550 meters vertical depth. Historical mining reached approximately 180 meters depth before

operations ceased in the 1920s. Grade ranges are scaled down from historical production

grades to reflect broader zones of mineralization. Vein widths range from 1.2 to 4.6 meters

based on historical reports. The exploration target assumes discontinuous mineralization

along mapped vein structures, consistent with copper-siderite vein systems elsewhere in the

district.

Project Location and Infrastructure

The Monitor Project is located in the Coeur d'Alene Mining District, where mining has been

conducted continuously since the 1880s to early 1900’s . The great fire of the 1910’s damaged

major infrastructure at that time. The project has road access and is situated in a region with

experienced mining contractors and infrastructure to support exploration and potential

future operations.

Transatlantic Mining Corp. | Suite 400 | 837 West Hastings Street | Vancouver | Canada

V6C 3N6 T 604-630 7296 | F 604-357 1139| www.transatlanticminingcorp.com

Strategic Development Approach

Transatlantic has developed a phased exploration strategy that prioritizes cost -effective

underground evaluation over expensive surface drilling in mountainous terrain. The

Company's 2015 assessment confirmed the St. Lawrence tunnel remains structurally sound

in part to 120 meters, providing direct access to drill the undrilled Monitor vein systems at

depth.

Three-Phase Exploration Program:

Phase 1 - Underground Exploration: Rehabilitation of existing underground workings,

systematic channel sampling and mapping, underground drilling, and an option for the

collection of a 10,000-tonne bulk metallurgical sample. This phase will provide high -quality

geological data while generating material for comprehensive metallurgical testing.

Phase 2 - Property-Scale Surveys: Detailed geological mapping, geophysical surveys

(magnetic and IP/resistivity), and petrophysical analysis to identify additional targets and

refine the geological model.

Phase 3 - Targeted Surface Drilling: Surface drill programs will be designed based on

underground results, focusing on down -plunge extensions and potential stratiform

mineralization in the underlying Revett Formation.

Exploration by Transatlantic (2013-2024)

Table 2: Completed Exploration Activities

Year Activity Laboratory

2013 159 soil samples American Analytical

2013-2014 Geological mapping and

Monitor adit assessment

American Analytical/ALS

Reno

2015 5 diamond drill holes

(Richmond area)

American Analytical

2015 St. Lawrence Tunnel

sampling and assessment

American Analytical

2023 14 HQ drill holes Chris Christofferson Lab

2023 Big Elk rock and channel

sampling

Chris Christofferson Lab

Transatlantic Mining Corp. | Suite 400 | 837 West Hastings Street | Vancouver | Canada

V6C 3N6 T 604-630 7296 | F 604-357 1139| www.transatlanticminingcorp.com

2024 Ground magnetic

geophysical survey

Not applicable

2024 Anvil Tunnel sampling American Analytical

Next Steps

The Company is advancing permitting for underground rehabilitation and underground drill

planning. Management will provide updates as milestones are achieved.

Qualified Person

The technical information in this news release has been reviewed and approved by Zachary

J. Black, SME-RM, Ethos Geological as an Independant Qualified Person as defined under NI

43-101

About Transatlantic Mining Corp.

Transatlantic Mining Corp. (TSX -V: TCO) is a precious and base metals explorer focused on

advancing projects toward production in established mining jurisdictions. The Company

holds an 80% interest in the Monitor Copper Project (Idaho/Montana), 100% of the Golden

Jubilee Gold Project, and rights to the Miller Gold Mine in Montana. The Company

emphasizes cost -effective exploration strategies and partnerships that align with its

development-focused approach.

Cautionary Statement Regarding Forward-Looking Information

This news release contains forward -looking statements within the meaning of applicable

securities legislation. Forward -looking statements relate to future events or future

performance and reflect Company management's expectations or beliefs regarding futur e

events including the potential for mineralization, future exploration programs, timing of

exploration activities, and the ability to obtain financing. These statements are based on

assumptions and involve risks and uncertainties. Actual results may diffe r materially from

those anticipated in these forward -looking statements due to various factors including

changes in economic conditions, regulatory changes, and availability of financing. The

Company undertakes no obligation to update forward -looking state ments except as

required by applicable securities laws.

For further information, please contact:

Transatlantic Mining Corp. | Suite 400 | 837 West Hastings Street | Vancouver | Canada

V6C 3N6 T 604-630 7296 | F 604-357 1139| www.transatlanticminingcorp.com

Bernie Sostak, Chief Executive Officer

Email:[email protected]

Phone: +61 (0) 439 904 044

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.