Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TCCM.V ·

Gungnir To Re-Evaluate Potential of its Nickel-Copper-Cobalt Assets in Sweden; Geophysics Underway

Exploration Programs

#404-1688 152nd Street, Surrey, BC V4A 4N2 |T: 604.683.0484 |F: 604.683.7497 1

News Release GUG: TSX-V

OTCBB: ASWRF

Gungnir Resources Inc.

Gungnir To Re-Evaluate Potential of its Nickel-Copper-Cobalt Assets in Sweden; Geophysics

Underway

Vancouver – November 28, 2017 - Gungnir Resources Inc. (GUG: TSX -V, ASWRF: OTCBB ) (“Gungnir” or the

“Company”) is commencing a thorough review of its nickel-copper assets in Sweden following the Company’s

drill-discovery of layered gabbro with nickel -copper bearing sulphides at its Knaften property this fall. The

Company has commenced a ground geophysical survey at its Lappvattnet and Rormyrberget permits located

east of Knaften , and plans to re-sample selective archived drill core and 3D-model the mineralized zones in

advance of planning future work.

“Now that we have nickel-copper mineralization on a third property in northern Sweden, the Company is taking

a fresh look at its two staked nickel deposits, Lappvattnet and Rormyrberget, which collectively contain over 70

million pounds of nickel, 10 million pounds of copper and 2 million pounds of cobalt in historic resources.

Within both deposits, very good nickel drill intersections are reported including 5 metres of 3.21% Ni + 4.28 g/t

TPM (Total Precious Metals, Pt+Pd+Au) at Lappvattnet and 12.5 metres of 2. 63% Ni at Rormyrberget. With

additional value-added TPM’s reported, and several previous drill holes not assayed for Pt, Pd or Au, sampling

of archived drill core, planned during the upcoming winter months, will include TPM assays. On the geophysical

side, we have a crew on the ground today commencing a detailed magnetics survey on both Lappvattnet and

Rormyrberget in order to get our own initial data for deposit modelling purposes, and to evaluate potential

deposit extensions and undrilled magnetic anomalies which could be related to pyrrhotite ( magnetic Fe -

sulphide), the key host to the nickel-copper sulphides “, commented Gungnir’s CEO, Jari Paakki.

“Our focus in Sweden remains gold, but with a base metal slant. At Knaften we have both gold and now

promising drill targets for nickel-copper mineralization. Finding a decent nickel-copper deposit at Knaften could

bode well for regional synergies with Lappvattnet and Rormyrberget”, continued Mr. Paakki.

Highlights of Previous Drill Intersections (Note 1):

Hole No From To Length (m) Ni (%) Cu (%) Co (%) Pt (g/t) Pd (g/t) Au (g/t) TPM

LAP07-02 70.0 91.0 21.00 1.07 0.09 0.03 0.640 0.340 0.071 1.051

includes 76.4 81.4 4.97 3.21 0.06 0.08 2.690 1.400 0.190 4.280

LAP74226 92.5 97.9 5.40 1.44 0.19 0.03 NR NR NR NR

LAP75001 78.4 81.9 3.50 1.57 0.32 0.01 NR NR NR NR

ROR89009 162.2 169.2 7.00 2.28 0.30 0.09 NR NR NR NR

ROR90024 155.9 168.4 12.50 2.63 0.51 0.09 NR NR NR NR

ROR91002 161.1 173.0 11.95 1.83 0.29 0.06 NR NR NR NR

ROR-08 122.0 163.0 41.00 0.52 0.09 0.02 0.021 0.077 0.018 0.116

includes 146.0 163.0 17.00 1.01 0.18 0.03 0.035 0.147 0.032 0.214

includes 150.3 155.3 5.00 1.59 0.27 0.04 0.038 0.260 0.073 0.371

ROR-09 151.0 276.0 125.00 0.39 0.05 0.02 0.027 0.040 0.010 0.077

includes 157.9 177.5 19.55 1.16 0.16 0.04 0.107 0.141 0.025 0.273

includes 159.9 162.8 2.85 3.74 0.27 0.13 0.130 0.418 0.030 0.578

ROR-11 14.9 68.1 53.20 0.38 0.04 0.01 0.004 0.010 0.003 0.017

includes 33.5 35.5 2.00 3.95 0.14 0.14 0.015 0.006 0.150 0.171

TPM: Total Precious Metals (Pt+Pd+Au); NR: precious metals not assayed/reported (see Note 1) ; LAP=Lappvattnet,

ROR=Rormyrberget. Gungnir believes previous assays are credible; however, the Company has not confirmed these

results with its own sampling.

#404-1688 152nd Street, Surrey, BC V4A 4N2 |T: 604.683.0484 |F: 604.683.7497 2

News Release GUG: TSX-V

OTCBB: ASWRF

Gungnir Resources Inc.

Historical Estimates and Contained Metal (Note 2):

Deposit Tonnes Ni% Cu% Co% Ni lbs (millions)

Rormyrberget 6,370,000 0.35 0.04 0.01 48.7

Lappvattnet 1,139,000 0.91 0.19 0.02 22.9

71.6

Deposit Ni kg Cu kg Co kg Ni lbs Cu lbs Co lbs

(millions) (millions) (millions) (millions) (millions) (millions)

Rormyrberget 22.1 2.5 0.8 48.7 5.5 1.9

Lappvattnet 10.4 2.2 0.2 22.9 4.8 0.5

TOTAL 32.5 4.7 1.0 71.6 10.3 2.4

A qualified person for Gungnir Resources has not done sufficient work to classify the historical estimates ( in

2009 RCI report; see Note 2) as current resources and Gungnir is not treating the historical estimates as current

mineral resources.

Mr. Jari Paakki, M.Sc., P.Geo., is a Qualified Person as defined by National Instrument 43 -101 - Standards of

Disclosure for Mineral Projects. Mr. Paakki prepared the technical information contained in this news release

and has approved its disclosure.

Notes:

1. From Blackstone Ventures Inc. news releases dated May 8, 2007 and June 23, 2008, SGU files/archived drill core and tables of

historic drill hole intersections in RCI report.

2. The historical estimates are based on an NI 43 -101 report entitled "TECHNICAL REPORT ON RESOURCE ESTIMATES FOR THE

LAINEJAUR, LAPPVATTNET AND RORMYRBERGET “ROR” DEPOSITS, NORTHERN SWEDEN”, prepared for Blackstone Ventures Inc.

by Reddick Consulting Inc. (RCI), effective May 5, 2009 and filed on SEDAR on June 16, 2009 (“RCI report”). These historical

estimates cannot be fully verified, and are only referred to in this news release as an indi cation of previously defined nickel

mineralization. Gungnir has not taken steps to identify what work needs to be done to upgrade or verify the historical estimates

as current mineral resources or mineral reserves.

In the RCI report, historical resourc e estimates at Lappvattnet were estimated using a US$100 gross metal value (GMV) cut off

using metal prices of US$8.00 for nickel, US$2.00 for copper, US$8.00 for cobalt. At Rormyrberget historical resources were

estimated using a US$40 gross metal value (GMV) cut off using the same metal prices. At the Lappvattnet deposit RCI estimated

the historical mineral resources using polygonal estimation methods whereas the historical mineral resources at the

Rormyrberget deposit were estimated by RCI using by 3D co mputer block modelling and an Ordinary Kriging (OK) grade

interpolation method. Historical mineral resources are not current mineral resources or mineral reserves and do not have any

demonstrated economic viability. The estimate of the RCI historical mineral resources may be materially affected by commodity

prices, environmental, permitting, legal, title, socio -political, marketing, or other relevant issues. The quantity and grade of

reported historical resources in the RCI estimation are uncertain in natur e and there has been insufficient exploration to define

these historical resources as current mineral resources and it is uncertain if further exploration will result in upgrading t hem to

current mineral resources or mineral reserves. The RCI historical mineral resources were estimated using the Canadian Institute

of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines

prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council December 11, 2005. Further work

recommended by RCI includes: metallurgical testing, undertaking a survey to obtain baseline environmental data, re-sampling of

archived drill core and continued deposit definition drilling.

.

#404-1688 152nd Street, Surrey, BC V4A 4N2 |T: 604.683.0484 |F: 604.683.7497 3

News Release GUG: TSX-V

OTCBB: ASWRF

Gungnir Resources Inc.

About Gungnir Resources

Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V) with gold

and base metal permits in northern Sweden within a region hosting 12 million ounces of gold delineated in

existing and mined resources plus several past-producing and producing base metal mines. The Company’s key

gold project, Knaften, is situated at the southern extension of the “Gold Line” which hosts a number of gold

deposits including Faboliden and Svartliden (Dragon Mining), and Barsele (Agnico Eagle and Barsele Minerals).

The Company also has permits covering two nickel deposits in Sweden, Lappvattnet and Rormyrberget which

collectively host 70 million pounds of nickel in historical resources (see NR dated February 24, 2015). Gungnir

additionally holds a $5,000,000 royalty stream and received the first annual payment of $1,000,000 on May 2,

2017. The next annual payment of $1,000,000 is due on April 30, 2018. Further information about the Company

and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Jari Paakki, CEO and Director

For further information contact:

Jari Paakki, CEO

Tel: 705-507-4470

[email protected]

Chris Robbins, CFO

Tel: 604-683-0484

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that ter m is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward -Looking Statements: Certain statements made herein may contain forward -

looking statements or information within the meaning of Canadian securities laws. In certain cases, forward-looking

statements can be identified by the use of words such as "plans", "expects", "is expecte d", "budget", "scheduled",

"estimates", "forecasts", "intends", "anticipates" or "believes", or variations of such words and phrases or

statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be

achieved", or the negative of these words or comparable terminology. By their very nature forward -looking

statements involve known and unknown risks, uncertainties and other factors which may cause the actual

performance of the Company to be materially diff erent from any anticipated performance expressed or implied by

the forward-looking statements. Such forward-looking statements or information include, but are not limited to,

statements or information with respect to Gungnir Resources’ plan for future funding, and exploration and

development of its properties. Forward-looking statements or information are based on a number of estimates and

assumptions and are subject to a variety of risks and uncertainties, which could cause actual events or results to

differ from those reflected in the forward-looking statements or information. Should one or more of these risks and

uncertainties materialize, or should underlying estimates and assumptions prove incorrect, actual results may vary

materially from those descri bed in forward -looking statements or information. For example, there is no certainty,

that any economically viable mineral deposit will be located on the properties, or that the Company will receive or

be able to raise sufficient capital to complete all of its exploration programs. Accordingly, undue reliance should not

be placed on forward -looking statements or information. Gungnir does not expect to update forward -looking

statements or information continually as conditions change, except as may be require d by securities law.