Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TCCM.V ·

Gungnir To Commence Field Work at Knaften-Hemberget, Sweden

Exploration Programs

News Release GUG: TSX-V

ASWRF: OTCPK

Gungnir To Commence Field Work at Knaften-Hemberget,

Sweden

Surrey, BC – May 15, 202 5 - Gungnir Resources Inc. (GUG: TSX -V, ASWRF: OTCPK) (“Gungnir” or the

“Company”) announces plans to continue to assess the prospectivity of the recently expanded Knaften-

Hemberget project located in northern Sweden.

Surface work is part of the Company’s plan to increase exploration coverage across its property portfolio

in Sweden to potentially generate new targets . The currently planned field work program at Knaften -

Hemberget will focus on gabbro -ultramafic intrusions which are potentially favourable for copper

mineralization.

Recently reviewed archived data files from the Swedish Geological Survey (SGU) shows a gabbro outcrop

with weakly disseminated chalcopyrite (copper-sulphide) and pyrrhotite (iron-sulphide) mineralization at

Hemberget, as well as chalcopyrite hosted in massive sulphides in a boulder (glacial float) database in the

east half of the newly expanded Knaften permits. No assays were reported. Prospecting and sampling are

planned in these locales as well as other gabbro/ultramafic intrusions on the property.

Gabbro-hosted, copper mineralization was discovered at Knaften by Gungnir while drill-testing ground

geophysical anomalies in 2017 and 2018 . Two drill holes cut t hick intervals of gabbro including local

disseminated, blebby, patchy and erratically banded pyrrhotite with lesser chalcopyrite. Assays included

0.48% Cu over 0.5 m (from 53.8 m) and 0.19% Cu over 2.0 m (from 57.9 m) in drill hole KN17 -05, and

0.13% Cu over 14.35 m (from 45.5 m) in drill hole KN18-06.

Significant project advances will require raising funds, an earn -in type arrangement or possibly an

equitable merger. The Company continues to assess prevailing market conditions and manage its capital,

and with the currently depressed junior mining sector , limited budget prospecting/mapping at Knaften -

Hemberget is anticipated at this time.

The technical information in this news release has been prepared, verified and approved by Jari Paakki,

P.Geo., CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument

43-101.

About Gungnir Resources

Gungnir Resources Inc. is a Canadian -based TSX -V listed mineral exploration company (GUG: TSX -V,

ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir’s assets include two

nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, b oth with updated nickel resources, the

Knaften-Hemberget project which hosts a developing intrusion -hosted gold system, a newly discovered

gold target at Hemberget, and base metal targets, including copper. Further information about the

Company and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Jari Paakki, CEO and Director

News Release GUG: TSX-V

ASWRF: OTCPK

For further information contact:

Head Office/Investor Relations

Phone: +1-604-683-0484

Email: [email protected]

Jari Paakki, CEO

Email: [email protected]

Chris Robbins, CFO

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute “forward -looking information” within the meaning of

applicable securities laws (also known as forward-looking statements). Forward-looking information involves known

and unknown risks, uncertainties an d other factors, and may cause actual results, performance or achievements or

industry results, to be materially different from any future results, performance or achievements or industry results

expressed or implied by such forward -looking information. Forward-looking information generally can be identified

by the use of terms and phrases such as “anticipate”, “believe”, “could”, “estimate”, “expect”, “feel”, “intend”, “may”,

“plan”, “predict”, “project”, “subject to”, “will”, “would”, and similar terms an d phrases, including references to

assumptions. Some of the specific forward -looking information in this news release includes, but is not limited to,

statements with respect to: timing of all planned exploration work; expectations that archived field locations

mineralization are correct and available for sampling; expectations of successfully raising funds, an earn -in type

arrangement or possibly an equitable merger for significant project advances; and Gungnir’s plan for development

of its properties and the timing thereof.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including,

without limitation : access to the projects will remain available ; transportation and infrastructure will remain

available as anticipated; no change to laws or regulations that negatively affect Gungnir’s business; there will be a

demand for Gungnir’s services and products in the future; Gungnir will be able to operate its business as planned and

extend certain licences; Gungnir will be able to ac cess capital markets on and successfully complete financings on

terms it determines to be reasonable; and Gungnir’s plans for future exploration and development of its properties

is reasonable and will be possible within the anticipated timelines. Although the forward -looking information

contained in this news release is based upon what Gungnir believes to be reasonable assumptions, it cannot assure

investors that actual results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management’s current

expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate

for other purposes. Forward -looking information involves significant risks and uncertainties and should not be read

as a guarantee of future performance or results as actual results may differ materially from those expressed or

implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related

to: no certainty that any economically viable mineral deposit or new targets will be located on Gungnir’s properties;

that Gungnir may not be able to complete its planned work as anticipated ; the impacts of war and/or other

international conflicts; ability to access capital markets and complete successful financings on terms Gungnir

News Release GUG: TSX-V

ASWRF: OTCPK

determines to be reasonable; environmental matters; changes in legislation or regulations; receipt of required

licences, permits and approvals; and resource estimates may not be accurate and may differ significantly from actual

mineral resources. Management believes that the expectations reflected in the forward -looking information

contained herein are based upon reasona ble assumptions and information currently available; however,

management can give no assurance that actual results will be consistent with such forward-looking information. The

forward-looking information contained this news release is expressly qualified in its entirety by this cautionary

statement. Forward-looking information reflects management's current beliefs and is based on information currently

available to Gungnir. The forward -looking information is stated as of the date of this news release and Gungnir

assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be

required by applicable law.