Gungnir Samples 50.91 g/t Platinum-Palladium-Gold over 0.45 metres at Lappvattnet in Sweden

Drill Results Sampling & Geoscience Results

News Release GUG: TSX-V

ASWRF: OTCPK

Gungnir Samples 50.91 g/t Platinum-Palladium-Gold over 0.45 metres

at Lappvattnet in Sweden

Surrey, BC – March 30, 2020 - Gungnir Resources Inc. (GUG: TSX -V, ASWRF: OTCPK) (“Gungnir” or the

“Company”) reports 50.91 g/t PGE’s (39.0 g/t platinum, 11.8 g/t palladium, 0.11 g/t gold) and 2.13%

nickel over 0.45 metres at its Lappvattnet property in Sweden. Results are from initial re-sampling of

archived drill core in advance of plans to update the historic resource at Lappvattnet and to evaluate the

grade and distribution of PGE’s.

Jari Paakki, CEO of Gungnir comments, “ In addition to our Knaften project, where we’ve made three

new discoveries over the past three years and plan to continue drilling in early-summer 2020, we have

steadily continued to advance our Lappvattnet nickel project. We have completed 3-D modelling and

geophysics, and now we are having a closer look at potential value -added precious metals . Today’s

results support drill data from 2007 and demonstrate high-grade PGE contents. We have completed

further sampling of core from an additional fifteen holes drilled in the mid-1970’s which have no record

of being assayed for PGE’s. Assays are pending.”

Along with Lappvattnet, the Company holds the Rormyrberget nickel deposit located in the same

general area. The two deposits collectively contain over 70 million pounds (Mlbs) nickel, 10 Mlbs of

copper and 2 Mlbs of cobalt in historic resources. At Lappvattnet, the historical estimate is 1,139,000

tonnes @ 0.91% Ni, 0.19% Cu and 0.02% Co for 22.9 Mlbs of Ni, 4.8 Mlbs of Cu and 0.5 Mlbs of Co (see

Note 1).

Results Table

DDH_ID From (m) To (m) Length (m) Ni % PGE's g/t * Pt g/t Pd g/t Au g/t

Gungnir Re-Sampling Results

LAP07-001 32.55 34.94 2.39 1.54 0.10 0.01 0.04 0.05

LAP07-002 # 76.43 76.54 0.11 1.77 0.20 0.01 0.12 0.07

77.10 77.33 0.23 4.99 0.33 0.03 0.25 0.05

79.55 81.00 1.45 1.41 16.51 12.28 4.09 0.14

includes 79.55 80.00 0.45 2.13 50.91 39.00 11.80 0.11

LAP07-004 94.00 98.00 4.00 1.23 0.17 0.03 0.03 0.11

101.00 102.00 1.00 1.05 0.31 0.14 0.03 0.14

105.00 106.00 1.00 1.21 0.46 0.06 0.16 0.24

2007 Results

LAP07-001 32.55 34.94 2.39 1.36 0.11 0.02 0.04 0.05

LAP07-002 76.43 81.40 4.97 3.20 4.29 2.70 1.40 0.19

includes 79.00 80.00 1.00 3.13 14.71 9.04 5.37 0.30

LAP07-004 94.00 98.00 4.00 1.24 0.19 0.03 0.03 0.13

101.00 102.00 1.00 0.96 0.20 0.01 0.03 0.16

105.00 106.00 1.00 1.42 0.46 0.24 0.07 0.15

News Release GUG: TSX-V

ASWRF: OTCPK

* PGE's g/t = platinum (Pt) + palladium (Pd) + gold (Au)

# drill hole has several sections with insufficient core for sampling

Note 1: A qualified person for Gungnir Resources has not done sufficient work to classify the historical

estimates as current resources and Gungnir is not treating the historical estimates as current mineral

resources. Further information on Lappvattnet and historical estimate references and details , please

refer to this link: http://www.gungnirresources.com/projects/lappvattnet-rormyrberget/overview/

Sampled drill core is archived at the SGU (Swedish Geological Survey) core facility in Mala Sweden. Drill

core samples represent one -quarter drill core which was halved by sawing already split drill core. Core

was logged and tagged for sampling at the core facility, then brought to ALS Minerals’ Core Services

Laboratory also in Mala. Core was sawed on site by ALS staff and sample material was sent to ALS’s Lab

in Ireland. Ni was analyzed using fire assay method Ni-OG46 and Pt, Pd, and Au were analyzed using fire

assay method PGM-ICP27. Sample lengths reported in the above table are core lengths.

The technical information in this news release has been prepared and approved by Jari Paakki, P.Geo.,

CEO and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.

About Gungnir Resources

Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V) with

gold and base metal permits in northern Sweden. The Company’s key project, Knaften, hosts high -grade

gold, VMS (zinc-copper) and copper-nickel targets, and all are open for expansion and further discovery.

The Company also holds two nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, located east

of Knaften . Further information about the Company and its properties may be found at

www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Jari Paakki, CEO and Director

For further information contact:

Head Office/Investor Relations

Phone: +1-604-683-0484

Jari Paakki, CEO

Email: [email protected]

Chris Robbins, CFO

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Prov ider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements: Certain statements made herein may contain

forward-looking statements or information within the meaning of Canadian securities laws. In certain

News Release GUG: TSX-V

ASWRF: OTCPK

cases, forward-looking statements can be identified by the use of words such as "plans", "expects", "is

expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "believes", or

variations of such words and phrases or statements that certain actions, events or results "may",

"could", "would", "might" or "will be taken", "occur" or "be achieved", or the negative of these words or

comparable terminology. By their very nature forward -looking statements involve known and unknown

risks, uncertainties and other factors which may cause the actual performance of the Company to be

materially diff erent from any anticipated performance expressed or implied by the forward -looking

statements. Such forward-looking statements or information include, but are not limited to, statements

or information with respect to Gungnir ’s plan for future exploration and development of its properties ,

Gungnir’s plan for future disclosure relating to exploration and development of its properties within the

timelines set out above or at all . Forward-looking statements or information are based on a number of

estimates and assumptions and are subject to a variety of risks and uncertainties, which could cause

actual events or results to differ from those reflected in the forward -looking statements or information.

Should one or more of these risks and uncertainties materialize , or should underlying estimates and

assumptions prove incorrect, actual results may vary materially from those described in forward-looking

statements or information. For example, there is no certainty, that any economically viable mineral

deposit will be located on the properties, that the Company will receive or be able to raise sufficient

capital to complete all of its exploration programs as anticipated. Accordingly, undue reliance should not

be placed on forward -looking statements or information. Gung nir does not expect to update forward -

looking statements or information continually as conditions change, except as may be required by

securities law.