Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TCCM.V ·

Gungnir Resources’ Lappvattnet Nickel Project Designated a “Property of National Interest” in Sweden

Corporate Updates

News Release GUG: TSX-V

ASWRF: OTCPK

Gungnir Resources’ Lappvattnet Nickel Project Designated a “Property of National Interest” in

Sweden

Surrey, BC – December 8, 2025 – Gungnir Resources Inc. (GUG: TSX-V, ASWRF: OTCPK)

(“Gungnir” or the “Company”) is pleased to announce that its Lappvattnet Nickel Project has been

officially designated a “Property of National Interest” by the Swedish Geological Survey (SGU).

This designation is highly significant, as it provides protection for Lappvattnet from competing land uses

that could hinder future mining activities. It also represents a major milestone for the Company, with the

potential to streamline future permitting processes and strengthen Gungnir’s ability to attract partners and

investment for ongoing exploration and development.

Lappvattnet and Rormyrberget Nickel

The Lappvattnet and Rormyrberget nickel deposits are located along the “Nickel Line” in the eastern part

of the Vasterbotten District, 60 km and 100 km respectively east of the Company’s Knaften gold exploration

project. The deposits are held 100% by Gungn ir under two separate permits covering an area of 471.3

hectares. The properties are accessible year -round with good transportation and industrial infrastructure

including shipping facilities as there are a number of active mines in the area. Gungnir acqui red both

deposits in open staking in 2015. Existing licenses covering both deposits are currently valid to early

January 2027.

Two of the top nickel sulphide deposits in Sweden

• Company’s first drill program at Lappvattnet initiated in August, 2021; drilled a total of 7,345 metres in

53 holes in from 2021 to 2023

• Collectively contain 80 million kg of nickel (using historic results from the 1970s):

– Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5

million kg) of nickel.

– Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs (70

million kg) of nickel.

• 100% Gungnir subject to a royalty option purchase agreement for 2% GSR for CDN$8 million from

Altius

Minerals (Lappvattnet and Rormyrberget together)

• Accessible year-round with good transportation and industrial infrastructure including shipping

facilities,

and are located about an hour drive from Boliden’s mill complex

• Potential to expand the deposit beyond the current 2020 Lappvattnet nickel resource, in particular the

shallow down-plunge extension target in the eastern half of the property where historic drilling is very

sparse

• Recently discovered Footwall Zone at Lappvattnet offers further upside potential at Lappvattnet

Nickel resources totally 177 million pounds of nickel for Lappvattnet and Rormyrberget were updated in

2020.

• Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5

million kg) of nickel.

News Release GUG: TSX-V

ASWRF: OTCPK

Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs (70

million kg) of nickel.

The NI 43-101 Technical Report entitled “TECHNICAL REPORT on the LAPPVATTNET and RORMYRBERGET DEPOSITS,

NORTHERN SWEDEN” was prepared by Reddick Consulting Inc. Qualified Persons are John Reddick, M.Sc., P.Geo., and

Thomas Lindholm, M.Sc., Fellow AusIMM. The Effective Date is November 17, 2020.

Please refer to the Company’s website at www.gungnirresources.com for further information.

Corporate Update

The Board of Directors continues its search for a new CEO and will provide updates as appropriate in

accordance with applicable securities laws. In the interim, the remaining Board members will oversee

discussions with interested parties regarding the Company’s future initiatives, including potential

additions to the Board and management team, new partnerships, and possible asset transactions.

Advancing the Company’s projects will require successfully strengthening the Board and management

team and securing additional funding—whether through traditional financing, an earn-in arrangement, or

a potential merger or asset sale. Gungnir’s Knaften–Hemberget projects host multiple gold and base-metal

exploration targets, ranging from drill-ready gold prospects to early-stage anomalies, supported by a

large, under-explored land position along the Swedish Gold Line. The Company continues to seek new

leadership candidates and manage its capital prudently to remain compliant with all regulatory

requirements.

About Gungnir Resources

Gungnir Resources Inc. is a Canadian -based TSX-V listed mineral exploration company (GUG: TSX -V,

ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir’s assets include two

nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, b oth with updated nickel resources, the

Knaften-Hemberget project which hosts a developing intrusion -hosted gold system, a newly discovered

gold target at Hemberget, and base metal targets, including copper. Further information about the Company

and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Chris Robbins, CFO and Director

For further information contact:

Head Office/Investor Relations

Phone: +1-604-683-0484

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

News Release GUG: TSX-V

ASWRF: OTCPK

Certain statements in this news release may constitute “forward-looking information” within the meaning

of applicable securities laws (also known as forward -looking statements). Forward -looking information

involves known and unknown risks, uncertainties an d other factors, and may cause actual results,

performance or achievements or industry results, to be materially different from any future results,

performance or achievements or industry results expressed or implied by such forward -looking

information. Forward-looking information generally can be identified by the use of terms and phrases such

as “anticipate”, “believe”, “could”, “estimate”, “expect”, “feel”, “intend”, “may”, “plan”, “predict”,

“project”, “subject to”, “will”, “would”, and similar terms an d phrases, including references to

assumptions. Some of the specific forward -looking information in this news release includes, but is not

limited to, statements with respect to: timing of all planned exploration work; expectations that archived

field locations mineralization are correct and available for sampling; expectations of successfully raising

funds, an earn-in type arrangement or possibly an equitable merger for significant project advances; and

Gungnir’s plan for development of its properties and the timing thereof.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir,

including, without limitation: access to the projects will remain available ; transportation and

infrastructure will remain available as anticipated; no change to laws or regulations that negatively affect

Gungnir’s business; there will be a demand for Gungnir’s services and products in the future; Gungnir will

be able to operate i ts business as planned and extend certain licences; Gungnir will be able to access

capital markets on and successfully complete financings on terms it determines to be reasonable; and

Gungnir’s plans for future exploration and development of its properties is reasonable and will be possible

within the anticipated timelines. Although the forward-looking information contained in this news release

is based upon what Gungnir believes to be reasonable assumptions, it cannot assure investors that actual

results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management’s

current expectations and plans relating to the future and readers are cautioned that such statements may

not be appropriate for other purposes. Forward -looking information involves significant risks and

uncertainties and should not be read as a guarantee of future performance or results as actual results may

differ materially from those expressed or implied in such forward -looking information. Those risks an d

uncertainties include, among other things, risks related to: no certainty that any economically viable

mineral deposit or new targets will be located on Gungnir’s properties; that Gungnir may not be able to

complete its planned work as anticipated; the impacts of war and/or other international conflicts; ability

to access capital markets and complete successful financings on terms Gungnir determines to be

reasonable; environmental matters; changes in legislation or regulations; receipt of required l icences,

permits and approvals; and resource estimates may not be accurate and may differ significantly from actual

mineral resources. Management believes that the expectations reflected in the forward-looking information

contained herein are based upon reasonab le assumptions and information currently available; however,

management can give no assurance that actual results will be consistent with such forward -looking

information. The forward -looking information contained this news release is expressly qualified i n its

entirety by this cautionary statement. Forward-looking information reflects management's current beliefs

and is based on information currently available to Gungnir. The forward-looking information is stated as

of the date of this news release and Gungnir assumes no obligation to update or revise such information to

reflect new events or circumstances, except as may be required by applicable law.