Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TCCM.V ·

Gungnir Granted Knaften Gold Project Expansion Permits

Permits & Approvals

News Release GUG: TSX-V

ASWRF: OTCPK

Gungnir Granted Knaften Gold Project Expansion Permits

Surrey, BC – January 12, 2021 - Gungnir Resources Inc. (GUG: TSX -V, ASWRF: OTCPK) (“Gungnir” or the

“Company”) is pleased to announce that the Company has received final approvals from Sweden’s

Inspector of Mines for new exploration permits which expand the size of the Knaften property by over

75%. Please click HERE for maps.

Highlights

• The expanded Knaften gold project comprises 4,887 hectares (or nearly 50 sq. km) and

significantly adds to the potential of Gungnir’s Knaften intrusion-hosted gold target;

• Project now covers the entire prospective intrusion (4 x 5 km) which is comparable in size to

that hosting Agnico Eagle’s Barsele gold deposit located to the north along the same gold

corridor;

• The intrusion has only been drill-tested along its very northern edge resulting in discovery of the

Knaften 300 gold zone (“Knaften 300”), results include:

▪ 14.07 g/t Au over 4.25 m (from 138.75 to 143.00 m) in hole KN19-06

- includes 59.6 g/t Au over 1.00 m

▪ 5.39 g/t Au over 2.00 m (from 98.00 to 100.00 m) in hole KN19-09

▪ 3.45 g/t Au over 10.75 m (from 67.05 to 77.80 m) in hole 96009

▪ 3.20 g/t Au over 10.00 m (from 83.50 to 93.50 m) in hole 200707

▪ 2.92 g/t Au over 13.00 m (from 81.5 to 94.50 m) in re-sample 200707

▪ 3.11 g/t Au over 8.00 m (from 135.80 to 143.80 m) in hole 200714

▪ 2.13 g/t Au over 14.45 m (from 55.00 to 69.45 m) in hole KNA01001

▪ 2.01 g/t Au over 6.70 m (from 190.50 to 197.20 m) in hole 200710

▪ 2.89 g/t Au over 5.00 m (from 118.80 to 123.80 m) in hole 200715

The Gold Target

The target is the bedrock source(s) of the large Knaften gold-in-till anomaly (“Knaften anomaly”), one of

the largest in Sweden. The bedrock source is believed to be partially identified at Knaften 300, but based

on the sheer size of the Knaften anomaly it is reasonable to expect more gold to be found in situ. Other

gold-in-till anomalies in the regio n cover either current and past -producing gold mines or known gold

resources, including the Barsele intrusive-hosted gold deposit (Agnico Eagle/Barsele JV with more than 2

million ounces of gold (1)) and the Boliden/Bjorkdal gold deposit area with more than 5 million ounces of

gold produced (2).

Plans and On-Going Work

The Company is prioritizing targets with exploration work planned to re-start in Q2 2021. The work plan

will include geophysics, drilling to t est for structural extensions of Knaften 300 and initial scout drilling

on the newly acquired permits which are essentially untouched. Drilling is also being planned at the

Company’s Lappvattnet and Rorm yrberget nickel deposits which collectively contain 177 million lbs of

nickel based on new resource estimates tabled by Gungnir in 2020 (see news release dated November

25, 2020) . Also of particular interest is grade and distribution of PGEs (platinum -palladium-gold) at

News Release GUG: TSX-V

ASWRF: OTCPK

Lappvattnet where Gungnir core sampling returned up to 50.91 g/t PGEs over 0.45 metres (see news

release dated March 30, 2020).

Notes: (1) Barsele Minerals, Febru ary 21, 2019 Technical Report. Combined Pit and Underground Resources: Indicated 324,000 ozs Au @ 1.81

g/t Au + Inferred 2,086,000 ozs Au @ 2.54 g/t Au (based on 349 drill holes). (2) S wedish Geological Survey (S GU) and Mandalay Resources

website site and Technical Report.

The technical information in this news release has been prepared and approved by Jari Paakki, P.Geo.,

CEO and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.

About Gungnir Resources

Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V) with

gold and base metal permits in northern Sweden. Gungnir’s key project, Knaften, which hosts a

developing intrusion-hosted gold system, and VMS (zinc-copper) and copper-nickel targets, all of which

are open for expansion and further discovery. East of Knaften, t he Company holds two nickel -copper-

cobalt deposits, Lappvattnet and Rormyrberget . Further information about the Company and its

properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Jari Paakki, CEO and Director

For further information contact:

Head Office/Investor Relations

Phone: +1-604-683-0484

Jari Paakki, CEO

Email: [email protected]

Chris Robbins, CFO

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute “forward -looking information” within the meaning of

applicable securities laws (also known as forward -looking statements). Forward -looking information involves

known and unknown risks, uncertainties and other factors, and may ca use actual results, performance or

achievements or industry results, to be materially different from any future results, performance or achievements

or industry results expressed or implied by such forward -looking information. Forward -looking information

generally can be identified by the use of terms and phrases such as “anticipate”, “believe”, “could”, “estimate”,

“expect”, “feel”, “intend”, “may”, “plan”, “predict”, “project”, “subject to”, “will”, “would”, and similar terms and

phrases, including refere nces to assumptions. Some of the specific forward -looking information in th is news

releases include s, but is not limited to, statements with respect to: the belief of the bedrock source is partially

identified at Knaften 300 and the expectation of more gol d to be found in situ; Gungnir’s plans and on-going work;

News Release GUG: TSX-V

ASWRF: OTCPK

plans for future exploration and development of its properties and the timing thereof; Gungnir’s plan for future

disclosure relating to exploration and development of its properties within the timel ines set out above or at all.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir,

including, without limitation: the COVID -19 pandemic impact on the Canadian and global economy and Gungnir’s

business, and t he extent and duration of such impact; no change to laws or regulations that negatively affect

Gungnir’s business; there will be a demand for Gungnir’s services and products in the future; Gungnir will be able to

operate its business as planned ; and Gungni r’s plans for future exploration and development of its properties is

reasonable and will be possible within the anticipated timelines . Although the forward -looking information

contained in these two news releases is based upon what Gungnir believes to be reasonable assumptions, it cannot

assure investors that actual results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management’s current

expectations and pl ans relating to the future and readers are cautioned that such statements may not be

appropriate for other purposes. Forward -looking information involves significant risks and uncertainties and should

not be read as a guarantee of future performance or res ults as actual results may differ materially from those

expressed or implied in such forward -looking information. Those risks and uncertainties include, among other

things, risks related to: no certainty that any economically viable mineral deposit will be located on Gungnir’s

properties; that Gungnir may not be able to complete its work plans and exploration programs as anticipated or at

all; the impacts of the COVID -19 pandemic on the Canadian and global economy, Gungnir’s industry and its

business, which may negatively impact, and may continue to negatively impact, Gungnir and may materially

adversely affect its investments, results of operations, financial condition and Gungnir’s ability to obtain additional

equity or debt financing, and satisfy its fina ncial obligations; general economic conditions; future growth potential;

common share prices; liquidity; tax risk; tax laws currently in effect remaining unchanged; ability to access capital

markets; environmental matters; changes in legislation or regulat ions; and resource estimates may not be accurate

and may differ significantly from actual mineral resources . Management believes that the expectations reflected in

the forward -looking information contained herein are based upon reasonable assumptions and i nformation

currently available; however, management can give no assurance that actual results will be consistent with such

forward-looking information.

The forward-looking information contained this news release and in Gungnir’s other news release dissemin ated as

of today’s date is expressly qualified in its entirety by this cautionary statement. Forward -looking information

reflects management's current beliefs and is based on information currently available to Gungnir. The forward -

looking information is st ated as of the date of this news release and Gungnir assumes no obligation to update or

revise such information to reflect new events or circumstances, except as may be required by applicable law.