Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TCCM.V ·

Gungnir Extends Key Knaften Gold Licence and Highlights Regional Exploration Potential

Corporate Updates

News Release GUG: TSX-V

ASWRF: OTCPK

Gungnir Extends Key Knaften Gold Licence and Highlights

Regional Exploration Potential

Surrey, BC – January 24, 2024 - Gungnir Resources Inc. (GUG: TSX -V, ASWRF: OTCPK) (“Gungnir” or the

“Company”) is pleased to report that it has received approval from Sweden’s Inspector of Mines to extend

a key licence, Knaften nr 600, for a further three years. The 18.8 km2 licence covers the southern part of a

gold-hosting intrusion and strong , untested Induced Polarization (IP) chargeability anomalies up to 40

mV/V. See accompanying maps (Figure 1).

All of Gungnir’s projects (115 km 2) are situated in Sweden’s Vasterbotten District which hosts over ten

million ounces of gold delineated in existing and mined resources, including several past-producing and

producing volcanogenic massive sulphide (VMS) base metal mines in the well -known Skellefte Belt .

Gungnir’s nickel resources are located in the eastern part of the district , including its key asset ,

Lappvattnet. Currently, the Company is reviewing geophysical options at Lappvattnet focused on the

eastern down -plunge potential of high -grade nickel sulphides (see most recent drill section in news

release dated September 28, 2023 ; https://www.gungnirresources.com/_resources/news/nr20230928-

fig1.pdf?v=0.581).

Initial Work Plans

Two-fold objective of continuing to advance its Lappvattnet high -grade nickel project and increase

exploration coverage across the Company’s entire property portfolio. In addition to evaluating

geophysical options (and completing if viable) at Lappvattnet to guide future drilling, the planned 2024

regional work program will have a n emphasis on prospecting and geological mapping to potentially

generate new targets along side already defined IP chargeability anomalies at Knaften nr 600. A multi-

year, updated work plan permit (2024-25) for Knaften nr 600, inclusive of drilling, is being prepared. The

start of field work is expected in the second quarter of 2024 as conditions allow.

Background

The newly extended licence forms part of Gungnir’s larger Knaften -Hemberget project located along the

south end of the “Gold Line” covering up-ice of one of the largest gold -in-till anomalies in Sweden. The

bedrock source is believed to be partially identified at the Knaften 300 Gold Zone (held by Gungnir , see

below), but based on the sheer size of the anomaly it is conceivable to expect more gold to be found in

situ. Other gold-in-till anomalies in the district are related to either current and past-producing gold mines

or known gold resources.

The Knaften -Hemberget area is interpreted to represent a partially preserved structural dome where

geologic units, and importantly potential mineralization, may be repeated along its current outer margins.

This new geological model bodes well for potential new discoveries at Hemberget, including gold and base

metals. At present, four zones/occurrences are known on the Knaften property, three of which were

discovered by Gungnir. Please refer to the Company’s website for all news releases related to Knaften and

Hemberget and refer to accompanying maps:

News Release GUG: TSX-V

ASWRF: OTCPK

(1) The Knaften 300 Gold Zone (“Knaften 300”) is an intrusion-hosted gold zone situated within the

northern part of a 4 x 5 -km quartz diorite. It consists of apparently shallow-dipping, stacked

disseminated arsenopyrite zones extending from near -surface down -dip for more than 400

metres, and remains open in all directions . It was originally discovered in 1996 , followed by

further drilling in the mid-2000’s by Lappland Goldminers. Gungnir staked the licence in late-2016

and proceeded to commence drilling in 2017, completing 20 holes for 4,089 metres from 2017 to

2021. Recognizing larger intrusion-hosted gold potential, Gungnir staked Knaften nr 600 (the

newly extended licence) to cover the entire quartz diorite intrusion in 2020. The Company

initiated an IP survey over just a portion of the Knaften nr 600 licence resulting in new, significant

IP chargeability anomalies; the strongest anomalies in the survey (up to 40 mV/V) are first-priority

targets (see news release dated July 7, 2021). Previous surveys by prior operators at Knaften 300

have produced comparable IP responses.

Knaften 300 Gold Zone intersections by prior operators and Gungnir (2017 to 2021) include:

• 14.07 g/t Au over 4.25 m (from 138.75 to 143.00 m) in hole KN19-06

- includes 59.6 g/t Au over 1.00 m

• 5.39 g/t Au over 2.00 m (from 98.00 to 100.00 m) in hole KN19-09

• 3.45 g/t Au over 10.75 m (from 67.05 to 77.80 m) in hole 96009

• 3.20 g/t Au over 10.00 m (from 83.50 to 93.50 m) in hole 200707

• 2.92 g/t Au over 13.00 m (from 81.5 to 94.50 m) in re-sample 200707

• 3.11 g/t Au over 8.00 m (from 135.80 to 143.80 m) in hole 200714

• 2.13 g/t Au over 14.45 m (from 55.00 to 69.45 m) in hole KNA01001

• 2.01 g/t Au over 6.70 m (from 190.50 to 197.20 m) in hole 200710

• 2.89 g/t Au over 5.00 m (from 118.80 to 123.80 m) in hole 200715

(2) Gabbro-hosted, copper-nickel mineralization was discovered at Knaften by Gungnir drill-testing

ground electromagnetic/magnetic anomalies. Thick intervals of gabbro were cut in two drill holes

in 2017 and 2018 yielding up to 0.38% CuEq over 14.4m. Mineralization consists of disseminated,

blebby, patchy and erratically banded pyrrhotite with lesser chalcopyrite. At Hemberget, a much

larger-scale gabbro unit (11-km strike length as mapped by the Swedish Geological Survey, SGU),

and presumed same magmatic suite, offers an expansive exploration target.

(3) Unsourced, larger cluster of gold bearing boulders discovered by Gungnir’s prospectors in 2014.

Assays up to 8.52 g/t Au were yielded from disseminated pyrrhotite and arsenopyrite mineralized

felsic volcanic breccias. Although no felsic volcanics are mapped on a regional -scale at Knaften,

ample felsic rock units, including fragmentals, are mapped on Hemberget which are planned to

be the prime prospecting targets for this style of mineralization.

(4) Volcanogenic Massive Sulphide ( VMS) style mineralization was discovered by Gungnir in 2018

testing new ground electromagnetic (EM) anomalies . Drilling encountered widespread metal -

enrichment (Zn, Cu, Ag) with associated hydrothermal alteration, a traceable marker horizon

containing sphalerite (zinc sulphide) , decimetre-scale bedded compact Fe -sulphides and

News Release GUG: TSX-V

ASWRF: OTCPK

occasional sphalerite clasts. Felsic volcanics rocks mapped on Hemberget may offer potential to

host new VMS mineralization as well as gold-bearing targets noted above.

The technical information in this news release has been prepared, verified and approved by Jari Paakki,

P.Geo., CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument

43-101.

About Gungnir Resources

Gungnir Resources Inc. is a Canadian -based TSX -V listed mineral exploration company (GUG: TSX -V,

ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir’s assets include two

nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, both with updated nickel resources, and

the Knaften -Hemberget project which hosts a developing intrusion -hosted gold system, VMS-style

mineralization, copper-nickel targets, and disseminated felsic volcanic breccia-hosted gold boulders all of

which are open for expansion and further discovery. Further information about the Company and its

properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Jari Paakki, CEO and Director

For further information contact:

Head Office/Investor Relations

Phone: +1-604-683-0484

Email: [email protected]

Jari Paakki, CEO

Email: [email protected]

Chris Robbins, CFO

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute “forward -looking information” within the meaning of

applicable securities laws (also known as forward-looking statements). Forward-looking information involves known

and unknown risks, uncertainties and other factors, and may cause actual results, performance or achievements or

industry results, to be materially different from any future results, performance or achievements or industry results

expressed or implied by such forward -looking information. Forward-looking information generally can be identified

by the use of terms and phrases such as “anticipate”, “believe”, “could”, “estimate”, “expect”, “feel”, “intend”, “may”,

“plan”, “predict”, “project”, “subject to”, “will”, “would”, and similar terms an d phrases, including references to

assumptions. Some of the specific forward -looking information in this news release includes, but is not limited to,

statements with respect to: timing of all planned exploration work and future drilling; timing of any required work

permit submissions and approvals; and Gungnir’s plan for development of its properties and the timing thereof.

News Release GUG: TSX-V

ASWRF: OTCPK

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including,

without limitation : access to the projects will remain available ; transportation and infrastructure will remain

available as anticipated; the COVID -19 pandemic impact on the Canadian and global economy and Gungnir’s

business, and the extent and duration of such impact; no change to laws or regulations that negatively affect

Gungnir’s business; there will be a demand for Gungnir’s services and products in the future; Gungnir will be able to

operate its business as planned and extend certain licences; Gungnir will be able to acc ess capital markets on and

successfully complete financings on terms it determines to be reasonable; and Gungnir’s plans for future exploration

and development of its properties is reasonable and will be possible within the anticipated timelines. Although the

forward-looking information contained in this news release is based upon what Gungnir believes to be reasonable

assumptions, it cannot assure investors that actual results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management’s current

expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate

for other purposes. Forward-looking information involves significant risks and uncertainties and should not be read

as a guarantee of future performance or results as actual results may differ materially from those expressed or

implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related

to: no certainty that any economically viable mineral deposit will be located on Gungnir’s properties; that Gungnir

may not be able to complete its planned work as anticipated; the impacts of the COVID-19 pandemic; the impacts of

war and/or other international conflicts; ability to access capital markets and complete successful financings on

terms Gungnir determines to be reasonable; environmental matters; changes in legislation or regulations; receipt of

required licences, permits and approvals; and resource estimates may not be accurate and may differ significantly

from actual mineral resources. Management believes that the expectations reflected in the forward -looking

information contained herein are based upon reasonable assumptions and information currently available; however,

management can give no assurance that actual results will be consistent with such forward-looking information. The

forward-looking information containe d this news release is expressly qualified in its entirety by this cautionary

statement. Forward-looking information reflects management's current beliefs and is based on information currently

available to Gungnir. The forward -looking information is stated as of the date of this news release and Gungnir

assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be

required by applicable law.