Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TCCM.V ·

Gungnir Announces Start of Second Phase Drill Program at Lappvattnet High-Grade Nickel Project

Exploration Programs

News Release GUG: TSX-V

ASWRF: OTCPK

Gungnir Announces Start of Second Phase Drill Program

at Lappvattnet High-Grade Nickel Project

Surrey, BC – April 27, 20 22 - Gungnir Resources Inc. (GUG: TSX -V, ASWRF: OTCPK) (“Gungnir” or the

“Company”) is pleased to announce that drilling is expected to commence early next week at the

Company’s Lappvattnet high-grade nickel project in northern Sweden . Drilling will continue to focus on

upgrading and expanding the existing nickel resource. Approximately 4,000 metres of drilling is planned.

“Our first phase program at Lappvattnet, completed in Q4 2021, was highly successful , delivering

consistent shallow drill hits of high -grade and wide -grade nickel sulphide mineralization,” commented

Jari Paakki, CEO of Gungnir. “This year we are planning to expand our drill efforts with more metres to

further define potential high-grade nickel shoots along the deposit plus drill-testing the “twin” north EM

geophysical conductor we identified late last year.”

Lappvattnet Project Highlights from 2021:

 Phase one drill program covered 20% of the total strike length of Lappvattnet

 Shallow drill hits of high-grade and wide zones of nickel mineralization, include:

­ 3.19% Nickel over 4.25 metres within a 10.4-metre interval grading 1.51% Nickel in

drill hole LAP21-02 (from 45 metres)

­ 2.62% Nickel over 5.65 metres within a 14.0-metre interval grading 1.40% Nickel in

drill hole LAP21-05 (from 60 metres)

­ 1.74% Nickel over 10.00 metres in drill hole LAP21-13 (from 21 metres)

­ 36.00 metres grading 0.93% Nickel in drill hole LAP21-04 (from 49 metres)

 EM (electromagnetic) geophysical survey outlined a near-surface untested EM conductor

located 100 metres north of the Lappvattnet nickel resource

Nickel Resources:

Gungnir’s nickel sulphide resources in Sweden include Lappvattnet and Rormyrberget. In 2020, the

Company updated both resources which collectively total 177 million pounds of nickel. The properties

are accessible year -round with good transportation and industrial infrastructure including shipping

facilities and are located about an hour drive from Boliden’s mill complex.

 Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 m illion lbs (10.5

million kg) of nickel.

 Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs

(70 million kg) of nickel.

The NI 43-101 Technical Report entitled “TECHNICAL REPORT on the LAPPVATTNET and RORMYRBERGET

DEPOSITS, NORTHERN SWEDEN ” was prepared by Reddick Consulting Inc. Qualified Persons are John

Reddick, M.Sc., P.Geo. , and Thomas Lindholm, M.Sc., Fellow AusIMM. The Effective Date is November

17, 2020.

The technical information in this news release has been prepared and approved by Jari Paakki, P.Geo.,

CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.

News Release GUG: TSX-V

ASWRF: OTCPK

About Gungnir Resources

Gungnir Resources Inc. is a Canadian -based TSX -V listed mineral exploration company (GUG: TSX -V,

ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir’s assets include two

nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, b oth with updated nickel resources, and

the Knaften project which hosts a developing intrusion -hosted gold system, and VMS (zinc -copper) and

copper-nickel targets, all of which are open for expansion and further discovery. The Company has also

recently added the Hemberget property to its Swedish Property Portfolio which covers an 11 km long

gabbro-ultramafic intrusion, a greenfield copper -nickel target. Further information about the Company

and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Jari Paakki, CEO and Director

For further information contact:

Head Office/Investor Relations

Phone: +1-604-683-0484

Jari Paakki, CEO

Email: [email protected]

Chris Robbins, CFO

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute “forward -looking information” within the meaning of

applicable securities laws (also known as forward -looking statements). Forward -looking information involves

known and unknown risks, uncertainties an d other factors, and may cause actual results, performance or

achievements or industry results, to be materially different from any future results, performance or achievements

or industry results expressed or implied by such forward -looking information. Fo rward-looking information

generally can be identified by the use of terms and phrases such as “anticipate”, “believe”, “could”, “estimate”,

“expect”, “feel”, “intend”, “may”, “plan”, “predict”, “project”, “subject to”, “will”, “would”, and similar terms an d

phrases, including references to assumptions. Some of the specific forward -looking information in this news release

includes, but is not limited to, statements with respect to: the intended allocation of available exploration funds;

planned drilling locations and expected targets; extent of drilling and quantity of drilling holes; planned exploration

program including anticipated drilling and the timing thereof ; and Gungnir’s plan for development of its properties

and the timing thereof.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir,

including, without limitation: access to the resources will remain available year -round; transportation and

infrastructure will remain available as antici pated; the COVID -19 pandemic impact on the Canadian and global

economy and Gungnir’s business, and the extent and duration of such impact; no change to laws or regulations

News Release GUG: TSX-V

ASWRF: OTCPK

that negatively affect Gungnir’s business; there will be a demand for Gungnir’s serv ices and products in the future;

Gungnir will be able to operate its business as planned; Gungnir will be able to access capital markets on and

successfully complete financings on terms it determines to be reasonable; and Gungnir’s plans for future

exploration and development of its properties is reasonable and will be possible within the anticipated timelines.

Although the forward-looking information contained in this news release is based upon what Gungnir believes to be

reasonable assumptions, it cannot assure investors that actual results will be consistent with such information.

Forward-looking information is provided for the purpose of presenting information about management’s current

expectations and plans relating to the future and readers are cautio ned that such statements may not be

appropriate for other purposes. Forward -looking information involves significant risks and uncertainties and should

not be read as a guarantee of future performance or results as actual results may differ materially from those

expressed or implied in such forward -looking information. Those risks and uncertainties include, among other

things, risks related to: no certainty that any economically viable mineral deposit will be located on Gungnir’s

properties; that Gungnir ma y not be able to complete its planned drilling as anticipated; the impacts of the COVID -

19 pandemic; the impacts of war and/or other international conflicts ; ability to access capital markets and

complete successful fi nancings on terms Gungnir determines to be reasonable; environmental matters; changes in

legislation or regulations; receipt of required licenses, permits and approvals; and resource estimates may not be

accurate and may differ significantly from actual mineral resources. Management believes that the expectations

reflected in the forward -looking information contained herein are based upon reasonable assumptions and

information currently available; however, management can give no assurance that actual results will be consistent

with such forwar d-looking information. The forward -looking information contained this news release is expressly

qualified in its entirety by this cautionary statement. Forward -looking information reflects management's current

beliefs and is based on information currently available to Gungnir. The forward -looking information is stated as of

the date of this news release and Gungnir assumes no obligation to update or revise such information to reflect

new events or circumstances, except as may be required by applicable law .