Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TCCM.V ·

ASWRF: OTCPK 4.04% Nickel Over 5.76 Metres for Gungnir at Lappvattnet; Highest Grade Nickel Intercept Drilled to Date

Drill Results

News Release GUG: TSX-V

ASWRF: OTCPK

4.04% Nickel Over 5.76 Metres for Gungnir at Lappvattnet;

Highest Grade Nickel Intercept Drilled to Date

Surrey, BC – January 4, 2023 - Gungnir Resources Inc. (TSX-V:GUG)(OTC PINK:ASWRF) (“Gungnir” or the

“Company”) is very pleased to report the highest-grade nickel intercept drilled to date at the Company’s

Lappvattnet nickel deposit in northern Sweden. Hole LAP22-25 drilled 4.04% Ni over 5.76 metres within

a broader interval of 1.49% Ni over 18.28 metres starting at a down-hole depth of 57.72 metres. Click link

to view drill core (see photos).

Table of individual, consecutive assays for the 5.76 metre high -grade nickel interval in hole LAP22 -25

(70.0 to 75.76 metres):

“Another impressive nickel intercept for Gungnir at Lappvattnet , this time the highest-grade nickel

interval drilled to date. All of our hits are less than 100 metres below surface and cover a strike length of

400 metres in the western and central parts of the Lappvattnet deposit. Looking ahead, o ur plan is to

continue defining this high-grade nickel deposit, and the new footwall target, further to the east and at

depth where it has been only sparsely drilled in the past,” commented Jari Paakki, CEO.

Hole LAP22-25 was drilled in the central part of the Lappvattnet nickel resource on section 14E splitting a

50-metre gap between historic holes LAP74292 and LAP76008. The hole appears to have drilled into a

thickened mineralized zone, possibly a fold hinge similar to LAP22-19 drilled on section 16E (80 metres to

the east) which cut 2.35% Ni over 9.0 metres including 3.02% Ni over 5.66 metres starting at a down -

hole depth of 66.0 metres (see news release dated October 18, 2022). The nickel intercept in LAP22-25

(1.49% Ni over 1 8.28 metres from 57.72 to 76.0 metres ) occurs below a 4 -metre jack -straw textured

peridotite unit. It consists of an upper disseminated sulphide interval hosted in sedimentary gneisses from

57.72 metres and a lower, high-grade massive and semi -massive sulphide zon e (4.04% Ni over 5.76

metres) from 70.0 metres down-hole.

Notable, previously reported near -surface, high-grade nickel intersections drilled by Gungnir at

Lappvattnet include: 3.19% Nickel over 4.25 metres within a 10.4-metre interval grading 1.51% Nickel in

From (m) To (m) Length (m) Ni %

70.00 70.51 0.51 4.93

70.51 71.20 0.69 3.73

71.20 72.00 0.80 2.87

72.00 72.86 0.86 3.17

72.86 73.20 0.34 7.18

73.20 73.68 0.48 3.14

73.68 73.86 0.18 5.17

73.86 74.28 0.42 1.13

74.28 74.91 0.63 5.52

74.91 75.14 0.23 5.94

75.14 75.52 0.38 4.15

75.52 75.76 0.24 5.70

News Release GUG: TSX-V

ASWRF: OTCPK

hole LAP21-02 (240 metres west of LAP22-25); 2.62% Nickel over 5.65 metres within a 14.0-metre interval

grading 1.40% Nickel in hole LAP21 -05 ( 200 metres west of LAP22 -25); and 1.74% Nickel over 10.00

metres in hole LAP21-13 (260 metres west of LAP22-25).

See news releases dated November 15 and December 1, 2022 for drill plan map, long section (with hole

LAP22-25 highlighted), a table of all 2021/2022 drill hole co -ordinates, and details on the new footwall

target.

Further results from holes drilled in the central part of Lappvattnet (12 drill holes) are expected to be

reported in January and into early February 2023. Drilling is part of the systematic program at Lappvattnet

with the plan of upgrading and expanding the existing resource following general recommendations

outlined in the 2020 Technical Report (see reference below). Complete 2022 results will be collectively

tabulated once all results are received. To date, the Company has drilled a total of 5,435 metres in 45

holes in 2021 and 2022.

Lengths noted are core length; true width has not been determined as structural interpretations are on-

going. Core was logged and tagged for sampling at the Company’s logging facility in Lycksele , Sweden,

then shipped to ALS Minerals’ Core Services Laboratory in Mala, Sweden. Core was sawed on site in Mala

by ALS staff and prepped sample material was sent to ALS’s Lab in Ireland. Core was analyzed for multi -

elements using code ME-MS41, CuOG46 analysis for >10000 ppm Cu, NiOG46 analysis for >10000 ppm Ni,

and Pt, Pd, and Au were analyzed using fire assay method PGM -ICP27. Blanks, certified standards and

duplicates are routinely included in sample batches for quality assurance and control.

Nickel Resources

Gungnir’s nickel sulphide resources in Sweden include Lappvattnet and Rormyrberget. In 2020, the

Company updated both resources which collectively total 177 million pounds of nickel. The properties are

accessible year-round with good transportation and indu strial infrastructure including shipping facilities

and are located about an hour drive from Boliden’s mill complex.

• Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5

million kg) of nickel.

• Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs

(70 million kg) of nickel.

The NI 43-101 Technical Report entitled “TECHNICAL REPORT on the LAPPVATTNET and RORMYRBERGET

DEPOSITS, NORTHERN SWEDEN ” was prepared by Reddick Con sulting Inc. Qualified Persons are John

Reddick, M.Sc., P.Geo., and Thomas Lindholm, M.Sc., Fellow AusIMM. The Effective Date is November 17,

2020.

The technical information in this news release has been prepared, verified and approved by Jari Paakki,

P.Geo., CEO, and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument

43-101.

News Release GUG: TSX-V

ASWRF: OTCPK

About Gungnir Resources

Gungnir Resources Inc. is a Canadian -based TSX -V listed mineral exploration company (GUG: TSX -V,

ASWRF: OTCPK) with gold and base metal projects in northern Sweden. Gungnir’s assets include two

nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, b oth with updated nickel resources, and

the Knaften project which hosts a developing intrusion -hosted gold system, and VMS (zinc -copper) and

copper-nickel targets, all of which are open for expansion and further discovery. The Company has also

recently added the Hemberget property to its Swedish Property Portfolio which covers an 11 km long

gabbro-ultramafic intrusion, a greenfield copper -nickel target. Further information about the Company

and its properties may be found at www.gungnirresources.com or at www.sedar.com.

On behalf of the Board,

Jari Paakki, CEO and Director

For further information contact:

Head Office/Investor Relations

Phone: +1-604-683-0484

Jari Paakki, CEO

Email: [email protected]

Chris Robbins, CFO

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information

Certain statements in this news release may constitute “forward -looking information” within the meaning of

applicable securities laws (also known as forward-looking statements). Forward-looking information involves known

and unknown risks, uncertainties and other factors, and may cause actual results, performance or achievements or

industry results, to be materially different from any future results, performance or achievements or industry results

expressed or implied by such for ward-looking information. Forward -looking information generally can be identified

by the use of terms and phrases such as “anticipate”, “believe”, “could”, “estimate”, “expect”, “feel”, “intend”, “may”,

“plan”, “predict”, “project”, “subject to”, “will”, “ would”, and similar terms and phrases, including references to

assumptions. Some of the specific forward -looking information in this news release includes, but is not limited to,

statements with respect to: plans to continue defining certain parts of the Lappvattnet deposit and the timing thereof;

the possible structure of any mineralized zones ; the receipt of assay results and timing of reports relating to same;

and plans for advancement of its properties and the timing thereof.

Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including,

without limitation: expectations of expanding and defining the existing resource s are reasonable and possible;

Gungnir will be able to receive and report assay results as expected; access to the resource will remain available ;

transportation and infrastructure will remain available as anticipated; the COVID -19 pandemic impact on the

Canadian and global e conomy and Gungnir’s business, and the extent and duration of such impact; no change to

laws or regulations that negatively affect Gungnir’s business; there will be a demand for Gungnir’s services and

products in the future; Gungnir will be able to operate its business as planned; Gungnir will be able to access capital

News Release GUG: TSX-V

ASWRF: OTCPK

markets on and successfully complete financings on terms it determines to be reasonable; and Gungnir’s plans for

future exploration and development of its properties is reasonable and will be possible within the anticipated

timelines. Although the forward -looking information contained in this news release is based upon what Gungnir

believes to be reasonable assumptions, it cannot assure investors that actual results will be consistent with suc h

information.

Forward-looking information is provided for the purpose of presenting information about management’s current

expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate

for other purposes. Forward -looking information involves significant risks and uncertainties and should not be read

as a guarantee of future performance or results as actual results may differ materially from those expressed or

implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related

to: expectations related to upgrading and expanding existing resources may not be accurate in part or at all; no

certainty that any economically viable mineral deposit will be located on Gungnir’s properties; that Gungnir may not

be able to complete its planned drilling as anticipated; the impacts of the COVID -19 pandemic; the impacts of war

and/or other international conflicts; ability to access capital markets and complete successful financings on terms

Gungnir determines to be reasonable; environmental matters; changes in legislation or regulations; receipt of

required licenses, permits and approvals; and resource estimates may not be accurate and may differ significantly

from actual mineral resou rces. Management believes that the expectations reflected in the forward -looking

information contained herein are based upon reasonable assumptions and information currently available; however,

management can give no assurance that actual results will be consistent with such forward-looking information. The

forward-looking information contained this news release is expressly qualified in its entirety by this cautionary

statement. Forward-looking information reflects management's current beliefs and is based on information currently

available to Gungnir. The forward -looking information is stated as of the date of this news release and Gungnir

assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be

required by applicable law.