Talamore Reports High Grade Assays from Supremo Extension Infill drilling, including hole 26-SPX-RC105 (12.24 g/t Au over 6.4 m) and 26-SPX-RC199 (6.26 g/t Au over 10.2 m), is targeting resource upgrade and conversion within the pit limits
Talamore Reports High Grade Assays from
Supremo Extension
Infill drilling, including hole 26-SPX-RC105 (12.24 g/t Au over
6.4 m) and 26-SPX-RC199 (6.26 g/t Au over 10.2 m), is targeting
resource upgrade and conversion within the pit limits
Infill assays are materially higher grade than the M&I and Inferred resource grade of 1.18 g/t
and 1.72 g/t, respectively
Vancouver, British Columbia--(Newsfile Corp. - September 8, 2026) - Talamore Mining Corporation
(TSX: TALA) (OTCQB: TALMF) ("
Talamore
" or the "
Company
") is pleased to report results from 30
holes of an ongoing 40,000-metre infill and exploration drilling program at its wholly-owned Coffee Gold
Project in Canada's Yukon Territory. Drilling is currently targeting the higher-grade Supremo Extension
zone (Figures 1 & 2), which presently hosts an Indicated Resource of 2,437 kt at a grade of 1.18 grams
per tonne (g/t) gold for a contained 92,000 ounces of gold, and an Inferred Resource of 6,059 kt at a
grade of 1.72 g/t gold for a contained 335,000 ounces of gold. The Inferred grade at Supremo Extension
is significantly higher than the 1.15 g/t Au grade of the overall Coffee Gold Project resource estimate and
thus provides a compelling target for converting high-grade ounces to the Indicated category for inclusion
in the Feasibility Study currently underway.
Today's release includes assay results from 30 reverse circulation holes totalling 4,356 metres of a
planned 25,000 metres of infill drilling at Supremo Extension. A total of 223 drill holes for approximately
32,852 metres have been completed through July of this year, with results for 100 holes comprising
13,764 metres released to date.
Drilling Highlights
Highlights of the holes reported herein from the Supremo Extension structural system include:
12.24 g/t Au over 6.4 m
estimated true width (ETW) in hole
26-SPX-RC105
6.26 g/t Au over 10.2 m
(ETW) in hole
26-SPX-RC199
5.33 g/t Au over 9.5 m
ETW in hole
26-SPX-RC054
3.84 g/t Au over 7.6 m
ETW in hole
26-SPX-RC067
2.77 g/t Au over 12.8 m
ETW in hole
26-SPX-RC055
Tim Warman, President and CEO of Talamore Mining, commented, "These latest results provide
important confirmation of the high-grade continuity and resource growth potential we see at Supremo
Extension. The intercepts reported today are materially above current resource grades, in some cases
extending beyond the limits of the existing resource pit and continue to support our objective of
converting higher-grade ounces for inclusion in the Feasibility Study now underway. As we advance
Coffee toward a construction decision, results like these reinforce our view that Supremo Extension will
be an important part of the Coffee Gold Project."
Geology and Context of Results
The Coffee Gold Project consists of multiple mineralized structural zones forming the equivalent of a
large vein swarm with individual structural zones from one to over thirty metres in width and extending up
to four-kilometres in strike length (Figure 1). The Supremo Extension portion of the Coffee deposit is at
the intersection of a steep dipping northeasterly trending high grade structure and a shallower east-
dipping structural zone.
The shallow dipping structure is unique relative to the other structural zones in the
Coffee deposit because of the much thicker mineralization, lower trace metal concentrations and higher
silver content. The intersection of these two structural trends creates wide zones of much higher-than-
average grade that become ideal for open pit mining.
Hole
26-SPX-RC199
(Figures 2 & 3) encountered better than expected grade near the bottom of
the current resource pit. This new hole also added mineralization within the current resource pit
with mineralization remaining open at depth. The mineralization cut in this cross section indicates
the potential for expanding the pit especially at depth and to the north, with increasing grade.
Hole
26-SPX-RC054 and 26-SPX-RC055
(Figure 2 & 4) confirms good grade and width at the
bottom of the pit and continuity of a strong mineralized structure outside the pit. These drill holes
add confidence to the resource at depth and show potential for pit expansion. These drill holes
should also upgrade the resource classification in this area, which is within the current resource pit.
Assays are pending on one shallow drill hole in this cross section which would define the near
surface extent of the mineralized structure. This cross section provides evidence that the pit could
expand at depth to include a historical high-grade intercept below the current pit.
Hole
26-SPX-RC067
(Figures 2 & 5) helps to confirm the current resource model interpretation
and shows grade increasing within the main mineralized structure.
This hole intercepted
mineralization within the current resource pit and adds confidence to the continuity of good grade.
Assays are pending on three drill holes on this section, which should add continuity to the main
mineralized structures and define the bottom of the pit.
Hole
26-SPX-RC105
(Figures 2 & 6) helps to confirm the current resource model and shows high-
grade continuity with the adjacent drill hole intercepts. This hole also adds mineralization within the
current resource pit and both major structures remain open at depth. These drill results in the low
angle structure are exceptionally good grade which should increase the block grades in this part of
the structure.
These 30 drill holes continue the campaign to infill between existing completed cross sections on the
Supremo Extension target, to increase drill density and upgrade resources from Inferred to Indicated for
inclusion in the Feasibility Study currently underway. Infill and/or expansion drilling has also started on the
Supremo and Latte zones.
Figure 1.
Known mineralized systems and existing drill holes at the Coffee Gold Project. Resource pit
outlines in Figures 1 through 6 are based on the report entitled "NI 43-101 Technical Report for the
2025 Mineral Resource Estimate Update on the Coffee Gold Project, Yukon, Canada" prepared for
Fuerte Metals Corporation by Micon International, with an effective date of August 21, 2025, and an
issue date of October 6, 2025.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_001full.jpg
Figure 2.
Location of drill holes and cross-sections from the current release, Supremo Extension.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_002full.jpg
Figure 3.
Cross-section A-A' through the Supremo Extension showing increasing grade and width at
depth.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_003full.jpg
Figure 4.
Cross-section B-B' through the Supremo Extension showing high-grade intercepts, with
potential to expand the pit to include significant intercepts below the current resource pit shell.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_004full.jpg
Figure 5.
Cross-section C-C' through the Supremo Extension showing intercepts within the shallower
eastward-dipping mineralized structure, adding confidence to the existing model and opportunity to
upgrade the resource classification in this area.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_005full.jpg
Figure 6.
Cross-section D-D' through the Supremo Extension showing high-grade continuity on the
shallow eastward-dipping structure.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_006full.jpg
Table 1.
Drill Results
Drill Hole
From
(m)
To
(m)
Drill Length
(m)
True Width
(m)
Au g/t
Zone
26-SPX-RC004
19.8
29.0
9.2
7.1
0.84
Supremo Extension
26-SPX-RC015
4.6
15.2
10.7
10.2
2.00
Supremo Extension
26-SPX-RC018
105.2
117.4
12.2
9.6
2.75
Supremo Extension
26-SPX-RC025
18.3
25.9
7.6
2.6
1.60
Supremo Extension
26-SPX-RC027
57.9
61.0
3.1
2.8
4.10
Supremo Extension
26-SPX-RC027
70.1
74.7
4.6
4.4
1.13
Supremo Extension
26-SPX-RC028
71.6
88.4
16.8
11.6
2.11
Supremo Extension
26-SPX-RC029
125.0
146.3
21.3
16.4
0.95
Supremo Extension
26-SPX-RC054
118.9
131.1
12.2
9.5
5.33
Supremo Extension
26-SPX-RC055
135.6
161.5
25.9
12.8
2.77
Supremo Extension
26-SPX-RC067
99.1
108.2
9.1
7.6
3.84
Supremo Extension
26-SPX-RC079
68.6
74.7
6.1
4.9
4.61
Supremo Extension
26-SPX-RC081
97.5
102.1
4.6
2.6
7.38
Supremo Extension
26-SPX-RC086
62.5
70.1
7.6
3.0
0.62
Supremo Extension
26-SPX-RC086
138.7
146.3
7.6
5.7
1.54
Supremo Extension
26-SPX-RC088
42.7
47.2
4.6
3.6
1.82
Supremo Extension
26-SPX-RC092
111.3
123.4
12.2
8.5
2.32
Supremo Extension
26-SPX-RC097
NSV
Supremo Extension
26-SPX-RC099
120.4
128.0
7.6
6.9
1.13
Supremo Extension
26-SPX-RC103
106.7
109.7
3.1
2.5
5.80
Supremo Extension
26-SPX-RC104
126.5
129.5
3.1
2.2
4.40
Supremo Extension
26-SPX-RC105
99.1
106.7
7.6
6.2
0.70
Supremo Extension
26-SPX-RC105
157.0
164.6
7.6
6.4
12.24
Supremo Extension
26-SPX-RC106
88.4
93.0
4.6
2.9
3.09
Supremo Extension
26-SPX-RC107
70.1
77.7
7.6
5.8
3.96
Supremo Extension
26-SPX-RC113
NSV
Supremo Extension
26-SPX-RC118
50.3
76.2
25.9
22.9
1.21
Supremo Extension
26-SPX-RC193
111.3
117.4
6.1
4.0
3.05
Supremo Extension
26-SPX-RC194A
158.5
160.0
1.5
1.1
3.76
Supremo Extension
26-SPX-RC195
149.4
172.2
22.9
21.0
1.48
Supremo Extension
26-SPX-RC196
68.6
77.7
9.1
7.6
0.70
Supremo Extension
26-SPX-RC196
150.9
169.2
18.3
15.8
1.54
Supremo Extension
26-SPX-RC197
33.5
36.6
3.1
2.7
1.55
Supremo Extension
26-SPX-RC199
96.0
108.2
12.2
10.2
6.26
Supremo Extension
26-SPX-RC199
118.9
125.0
6.1
2.5
1.88
Supremo Extension
NSV - No Significant Values
Table 2.
Drill Hole Locations
Drill Hole
Easting
Northing
Elevation
(masl)
Azimuth
Dip
Hole Depth
(m)
26-SPX-RC004
584299
6975920
936.6
356.8
46.1
152.4
26-SPX-RC015
584175
6975974
927.1
343.0
48.6
120.4
26-SPX-RC018
584162
6975907
949.4
307.9
75.8
201.2
26-SPX-RC025
584136
6975972
930.6
310.9
44.8
167.6
26-SPX-RC027
584125
6975903
948.0
135.2
44.4
91.4
26-SPX-RC028
584125
6975904
948.0
134.2
65.4
100.6
26-SPX-RC029
584125
6975907
947.7
314.3
45.3
187.5
26-SPX-RC054
584025
6975903
934.8
141.8
49.8
150.9
26-SPX-RC055
584025
6975903
934.8
142.4
68.7
190.5
26-SPX-RC067
583991
6975878
931.4
312.7
78.4
172.2
26-SPX-RC079
583918
6975777
931.5
137.5
43.4
96.0
26-SPX-RC081
583918
6975777
931.5
137.7
65.0
111.3
26-SPX-RC086
583914
6975839
918.8
140.8
56.3
166.1
26-SPX-RC088
583913
6975843
918.8
317.3
47.9
131.1
26-SPX-RC092
583899
6975787
923.8
142.0
62.8
157.0
26-SPX-RC097
583876
6975701
932.3
199.0
54.2
65.5
26-SPX-RC099
583857
6975794
909.6
138.3
52.3
160.0
26-SPX-RC103
583854
6975772
912.2
146.6
49.1
134.1
26-SPX-RC104
583853
6975767
912.6
147.1
62.9
178.3
26-SPX-RC105
583852
6975767
912.5
305.2
54.6
181.4
26-SPX-RC106
583848
6975730
916.7
137.6
58.9
120.4
26-SPX-RC107
583848
6975730
916.7
162.0
44.7
91.4
26-SPX-RC113
583822
6975762
901.9
157.0
46.2
131.1
26-SPX-RC118
583807
6975851
885.2
310.2
44.7
160.0
26-SPX-RC193
583848
6975730
916.7
197.2
61.2
140.2
26-SPX-RC194A
583836
6975822
899.3
146.0
56.0
201.2
26-SPX-RC195
583918
6975775
931.8
318.7
46.8
201.2
26-SPX-RC196
583959
6975794
939.8
334.4
63.2
181.4
26-SPX-RC197
584148
6975885
953.5
135.3
46.7
61.0
26-SPX-RC199
584300
6975880
951.9
328.1
57.6
152.4
Coordinate system NAD83 Zone 7N
The goal of targeting the higher-grade infill portion within the main Supremo Extension is to increase
both the size and the grade of the resource for inclusion in the current Feasibility Study work. The current
open-pit mineral resource estimate comprises:
Table 3.
2025 Coffee Gold Project Mineral Resource Estimate
Resource Category
Tonnage
(kt)
Gold Grade
(g/t)
Metal Content
(gold koz)
Measured
1,200
1.80
69
Indicated
78,846
1.14
2,888
Measured + Indicated
80,046
1.15
2,957
Inferred
21,200
1.17
800
Notes to Table 3:
1
.
Economic parameters used in the resource are a gold price of US$2,500/oz; heap leach average recoveries for the individual metallurgical
domains of 86.3% for Oxide, 76.0% for Upper Transition, 54.5% for Middle Transition and 31.4% for Lower Transition; a mining cost of
C$3.27-$3.50/t, processing costs of C$6.64/t, and general and administrative costs of C$6.0/t. A CAD:USD exchange rate of 1.35 was also
assumed.
2
.
The calculated cut-off grades vary between 0.13 g/t Au and 0.48 g/t Au, depending on the metallurgical domain. The global weighted
average cut-off grade is 0.18 g/t Au, with domain tonnage contributions comprising 64% Oxide, 18% Upper Transition, 5% Middle Transition,
and 13% Lower Transition.
3
.
Pit slope angles vary between 45.0 and 48.8 degrees depending on the pit area.
4
.
Pit optimization was done on 12x12x10 m re-block model with a minimum of 4x4x5 m regularized SMU.
5
.
Numbers have been rounded to the nearest for thousand tonnes and ounces. Differences may occur in totals due to rounding.
6
.
The mineral resources described above have been prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum
Standards and Practices.
7
.
Messrs. Alan J. San Martin, P.Eng. and Charley Murahwi, P.Geo. from Micon International Limited are the Qualified Person (QP) for this
Mineral Resource Estimate.
8
.
Mineral resources are not mineral reserves as they have not demonstrated economic viability. The quantity and grade of reported Indicated
and Inferred mineral resources in this news release are uncertain in nature and there has been insufficient exploration to define any
measured resource; however, it is reasonably expected that a significant portion of Inferred Mineral Resources could be upgraded into
Indicated Mineral Resources with further exploration.
9
.
Micon's QPs have not identified any legal, political, environmental, or other factors that could materially affect the potential development of
the mineral resource estimate.
Quality Assurance and Quality Control Procedures
RC samples are collected at the drill rig by a qualified subcontractor in conjunction with rock chips for
logging. Samples are collected every 5 ft (~1.52 m) for the entire hole, with the exception of the first
sample of each hole where intervals may be longer depending on recovery while casing is set. Large
retention bags (36"x24") are marked with the depth of the interval and small sample bags (12"x 20") are
marked with a sample ID corresponding to a sample tag book where depth interval and hole information
are recorded. The sample is collected in a clean bucket from under the cyclone. The full sample and
bucket are weighed and then the sample is split using a riffle splitter (1/8 split) into a retention bag and a
sample bag. The retention and sample bags are weighed on a scale, and the total weight, retention bag
weight, and sample bag weight are recorded in the corresponding sample tag book.
A representative spear sample is taken from the waste bucket and is dry and wet sieved on site. Chips
from the sieved sample are placed in a chip tray marked with the corresponding depth interval. Retention
bags are folded over and are stacked neatly at the drill site; sample bags are closed and arranged into
sample shipments at the drill site. A geologist regularly checks in on each drill to ensure sample integrity,