Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

TALA.V ·

Talamore Reports High Grade Assays from Supremo Extension Infill drilling, including hole 26-SPX-RC105 (12.24 g/t Au over 6.4 m) and 26-SPX-RC199 (6.26 g/t Au over 10.2 m), is targeting resource upgrade and conversion within the pit limits

Drill Results

Talamore Reports High Grade Assays from

Supremo Extension

Infill drilling, including hole 26-SPX-RC105 (12.24 g/t Au over

6.4 m) and 26-SPX-RC199 (6.26 g/t Au over 10.2 m), is targeting

resource upgrade and conversion within the pit limits

Infill assays are materially higher grade than the M&I and Inferred resource grade of 1.18 g/t

and 1.72 g/t, respectively

Vancouver, British Columbia--(Newsfile Corp. - September 8, 2026) - Talamore Mining Corporation

(TSX: TALA) (OTCQB: TALMF) ("

Talamore

" or the "

Company

") is pleased to report results from 30

holes of an ongoing 40,000-metre infill and exploration drilling program at its wholly-owned Coffee Gold

Project in Canada's Yukon Territory. Drilling is currently targeting the higher-grade Supremo Extension

zone (Figures 1 & 2), which presently hosts an Indicated Resource of 2,437 kt at a grade of 1.18 grams

per tonne (g/t) gold for a contained 92,000 ounces of gold, and an Inferred Resource of 6,059 kt at a

grade of 1.72 g/t gold for a contained 335,000 ounces of gold. The Inferred grade at Supremo Extension

is significantly higher than the 1.15 g/t Au grade of the overall Coffee Gold Project resource estimate and

thus provides a compelling target for converting high-grade ounces to the Indicated category for inclusion

in the Feasibility Study currently underway.

Today's release includes assay results from 30 reverse circulation holes totalling 4,356 metres of a

planned 25,000 metres of infill drilling at Supremo Extension. A total of 223 drill holes for approximately

32,852 metres have been completed through July of this year, with results for 100 holes comprising

13,764 metres released to date.

Drilling Highlights

Highlights of the holes reported herein from the Supremo Extension structural system include:

12.24 g/t Au over 6.4 m

estimated true width (ETW) in hole

26-SPX-RC105

6.26 g/t Au over 10.2 m

(ETW) in hole

26-SPX-RC199

5.33 g/t Au over 9.5 m

ETW in hole

26-SPX-RC054

3.84 g/t Au over 7.6 m

ETW in hole

26-SPX-RC067

2.77 g/t Au over 12.8 m

ETW in hole

26-SPX-RC055

Tim Warman, President and CEO of Talamore Mining, commented, "These latest results provide

important confirmation of the high-grade continuity and resource growth potential we see at Supremo

Extension. The intercepts reported today are materially above current resource grades, in some cases

extending beyond the limits of the existing resource pit and continue to support our objective of

converting higher-grade ounces for inclusion in the Feasibility Study now underway. As we advance

Coffee toward a construction decision, results like these reinforce our view that Supremo Extension will

be an important part of the Coffee Gold Project."

Geology and Context of Results

The Coffee Gold Project consists of multiple mineralized structural zones forming the equivalent of a

large vein swarm with individual structural zones from one to over thirty metres in width and extending up

to four-kilometres in strike length (Figure 1). The Supremo Extension portion of the Coffee deposit is at

the intersection of a steep dipping northeasterly trending high grade structure and a shallower east-

dipping structural zone.

The shallow dipping structure is unique relative to the other structural zones in the

Coffee deposit because of the much thicker mineralization, lower trace metal concentrations and higher

silver content. The intersection of these two structural trends creates wide zones of much higher-than-

average grade that become ideal for open pit mining.

Hole

26-SPX-RC199

(Figures 2 & 3) encountered better than expected grade near the bottom of

the current resource pit. This new hole also added mineralization within the current resource pit

with mineralization remaining open at depth. The mineralization cut in this cross section indicates

the potential for expanding the pit especially at depth and to the north, with increasing grade.

Hole

26-SPX-RC054 and 26-SPX-RC055

(Figure 2 & 4) confirms good grade and width at the

bottom of the pit and continuity of a strong mineralized structure outside the pit. These drill holes

add confidence to the resource at depth and show potential for pit expansion. These drill holes

should also upgrade the resource classification in this area, which is within the current resource pit.

Assays are pending on one shallow drill hole in this cross section which would define the near

surface extent of the mineralized structure. This cross section provides evidence that the pit could

expand at depth to include a historical high-grade intercept below the current pit.

Hole

26-SPX-RC067

(Figures 2 & 5) helps to confirm the current resource model interpretation

and shows grade increasing within the main mineralized structure.

This hole intercepted

mineralization within the current resource pit and adds confidence to the continuity of good grade.

Assays are pending on three drill holes on this section, which should add continuity to the main

mineralized structures and define the bottom of the pit.

Hole

26-SPX-RC105

(Figures 2 & 6) helps to confirm the current resource model and shows high-

grade continuity with the adjacent drill hole intercepts. This hole also adds mineralization within the

current resource pit and both major structures remain open at depth. These drill results in the low

angle structure are exceptionally good grade which should increase the block grades in this part of

the structure.

These 30 drill holes continue the campaign to infill between existing completed cross sections on the

Supremo Extension target, to increase drill density and upgrade resources from Inferred to Indicated for

inclusion in the Feasibility Study currently underway. Infill and/or expansion drilling has also started on the

Supremo and Latte zones.

Figure 1.

Known mineralized systems and existing drill holes at the Coffee Gold Project. Resource pit

outlines in Figures 1 through 6 are based on the report entitled "NI 43-101 Technical Report for the

2025 Mineral Resource Estimate Update on the Coffee Gold Project, Yukon, Canada" prepared for

Fuerte Metals Corporation by Micon International, with an effective date of August 21, 2025, and an

issue date of October 6, 2025.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_001full.jpg

Figure 2.

Location of drill holes and cross-sections from the current release, Supremo Extension.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_002full.jpg

Figure 3.

Cross-section A-A' through the Supremo Extension showing increasing grade and width at

depth.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_003full.jpg

Figure 4.

Cross-section B-B' through the Supremo Extension showing high-grade intercepts, with

potential to expand the pit to include significant intercepts below the current resource pit shell.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_004full.jpg

Figure 5.

Cross-section C-C' through the Supremo Extension showing intercepts within the shallower

eastward-dipping mineralized structure, adding confidence to the existing model and opportunity to

upgrade the resource classification in this area.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_005full.jpg

Figure 6.

Cross-section D-D' through the Supremo Extension showing high-grade continuity on the

shallow eastward-dipping structure.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7505/313150_f00b79c4445a9a6b_006full.jpg

Table 1.

Drill Results

Drill Hole

From

(m)

To

(m)

Drill Length

(m)

True Width

(m)

Au g/t

Zone

26-SPX-RC004

19.8

29.0

9.2

7.1

0.84

Supremo Extension

26-SPX-RC015

4.6

15.2

10.7

10.2

2.00

Supremo Extension

26-SPX-RC018

105.2

117.4

12.2

9.6

2.75

Supremo Extension

26-SPX-RC025

18.3

25.9

7.6

2.6

1.60

Supremo Extension

26-SPX-RC027

57.9

61.0

3.1

2.8

4.10

Supremo Extension

26-SPX-RC027

70.1

74.7

4.6

4.4

1.13

Supremo Extension

26-SPX-RC028

71.6

88.4

16.8

11.6

2.11

Supremo Extension

26-SPX-RC029

125.0

146.3

21.3

16.4

0.95

Supremo Extension

26-SPX-RC054

118.9

131.1

12.2

9.5

5.33

Supremo Extension

26-SPX-RC055

135.6

161.5

25.9

12.8

2.77

Supremo Extension

26-SPX-RC067

99.1

108.2

9.1

7.6

3.84

Supremo Extension

26-SPX-RC079

68.6

74.7

6.1

4.9

4.61

Supremo Extension

26-SPX-RC081

97.5

102.1

4.6

2.6

7.38

Supremo Extension

26-SPX-RC086

62.5

70.1

7.6

3.0

0.62

Supremo Extension

26-SPX-RC086

138.7

146.3

7.6

5.7

1.54

Supremo Extension

26-SPX-RC088

42.7

47.2

4.6

3.6

1.82

Supremo Extension

26-SPX-RC092

111.3

123.4

12.2

8.5

2.32

Supremo Extension

26-SPX-RC097

NSV

Supremo Extension

26-SPX-RC099

120.4

128.0

7.6

6.9

1.13

Supremo Extension

26-SPX-RC103

106.7

109.7

3.1

2.5

5.80

Supremo Extension

26-SPX-RC104

126.5

129.5

3.1

2.2

4.40

Supremo Extension

26-SPX-RC105

99.1

106.7

7.6

6.2

0.70

Supremo Extension

26-SPX-RC105

157.0

164.6

7.6

6.4

12.24

Supremo Extension

26-SPX-RC106

88.4

93.0

4.6

2.9

3.09

Supremo Extension

26-SPX-RC107

70.1

77.7

7.6

5.8

3.96

Supremo Extension

26-SPX-RC113

NSV

Supremo Extension

26-SPX-RC118

50.3

76.2

25.9

22.9

1.21

Supremo Extension

26-SPX-RC193

111.3

117.4

6.1

4.0

3.05

Supremo Extension

26-SPX-RC194A

158.5

160.0

1.5

1.1

3.76

Supremo Extension

26-SPX-RC195

149.4

172.2

22.9

21.0

1.48

Supremo Extension

26-SPX-RC196

68.6

77.7

9.1

7.6

0.70

Supremo Extension

26-SPX-RC196

150.9

169.2

18.3

15.8

1.54

Supremo Extension

26-SPX-RC197

33.5

36.6

3.1

2.7

1.55

Supremo Extension

26-SPX-RC199

96.0

108.2

12.2

10.2

6.26

Supremo Extension

26-SPX-RC199

118.9

125.0

6.1

2.5

1.88

Supremo Extension

NSV - No Significant Values

Table 2.

Drill Hole Locations

Drill Hole

Easting

Northing

Elevation

(masl)

Azimuth

Dip

Hole Depth

(m)

26-SPX-RC004

584299

6975920

936.6

356.8

46.1

152.4

26-SPX-RC015

584175

6975974

927.1

343.0

48.6

120.4

26-SPX-RC018

584162

6975907

949.4

307.9

75.8

201.2

26-SPX-RC025

584136

6975972

930.6

310.9

44.8

167.6

26-SPX-RC027

584125

6975903

948.0

135.2

44.4

91.4

26-SPX-RC028

584125

6975904

948.0

134.2

65.4

100.6

26-SPX-RC029

584125

6975907

947.7

314.3

45.3

187.5

26-SPX-RC054

584025

6975903

934.8

141.8

49.8

150.9

26-SPX-RC055

584025

6975903

934.8

142.4

68.7

190.5

26-SPX-RC067

583991

6975878

931.4

312.7

78.4

172.2

26-SPX-RC079

583918

6975777

931.5

137.5

43.4

96.0

26-SPX-RC081

583918

6975777

931.5

137.7

65.0

111.3

26-SPX-RC086

583914

6975839

918.8

140.8

56.3

166.1

26-SPX-RC088

583913

6975843

918.8

317.3

47.9

131.1

26-SPX-RC092

583899

6975787

923.8

142.0

62.8

157.0

26-SPX-RC097

583876

6975701

932.3

199.0

54.2

65.5

26-SPX-RC099

583857

6975794

909.6

138.3

52.3

160.0

26-SPX-RC103

583854

6975772

912.2

146.6

49.1

134.1

26-SPX-RC104

583853

6975767

912.6

147.1

62.9

178.3

26-SPX-RC105

583852

6975767

912.5

305.2

54.6

181.4

26-SPX-RC106

583848

6975730

916.7

137.6

58.9

120.4

26-SPX-RC107

583848

6975730

916.7

162.0

44.7

91.4

26-SPX-RC113

583822

6975762

901.9

157.0

46.2

131.1

26-SPX-RC118

583807

6975851

885.2

310.2

44.7

160.0

26-SPX-RC193

583848

6975730

916.7

197.2

61.2

140.2

26-SPX-RC194A

583836

6975822

899.3

146.0

56.0

201.2

26-SPX-RC195

583918

6975775

931.8

318.7

46.8

201.2

26-SPX-RC196

583959

6975794

939.8

334.4

63.2

181.4

26-SPX-RC197

584148

6975885

953.5

135.3

46.7

61.0

26-SPX-RC199

584300

6975880

951.9

328.1

57.6

152.4

Coordinate system NAD83 Zone 7N

The goal of targeting the higher-grade infill portion within the main Supremo Extension is to increase

both the size and the grade of the resource for inclusion in the current Feasibility Study work. The current

open-pit mineral resource estimate comprises:

Table 3.

2025 Coffee Gold Project Mineral Resource Estimate

Resource Category

Tonnage

(kt)

Gold Grade

(g/t)

Metal Content

(gold koz)

Measured

1,200

1.80

69

Indicated

78,846

1.14

2,888

Measured + Indicated

80,046

1.15

2,957

Inferred

21,200

1.17

800

Notes to Table 3:

1

.

Economic parameters used in the resource are a gold price of US$2,500/oz; heap leach average recoveries for the individual metallurgical

domains of 86.3% for Oxide, 76.0% for Upper Transition, 54.5% for Middle Transition and 31.4% for Lower Transition; a mining cost of

C$3.27-$3.50/t, processing costs of C$6.64/t, and general and administrative costs of C$6.0/t. A CAD:USD exchange rate of 1.35 was also

assumed.

2

.

The calculated cut-off grades vary between 0.13 g/t Au and 0.48 g/t Au, depending on the metallurgical domain. The global weighted

average cut-off grade is 0.18 g/t Au, with domain tonnage contributions comprising 64% Oxide, 18% Upper Transition, 5% Middle Transition,

and 13% Lower Transition.

3

.

Pit slope angles vary between 45.0 and 48.8 degrees depending on the pit area.

4

.

Pit optimization was done on 12x12x10 m re-block model with a minimum of 4x4x5 m regularized SMU.

5

.

Numbers have been rounded to the nearest for thousand tonnes and ounces. Differences may occur in totals due to rounding.

6

.

The mineral resources described above have been prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum

Standards and Practices.

7

.

Messrs. Alan J. San Martin, P.Eng. and Charley Murahwi, P.Geo. from Micon International Limited are the Qualified Person (QP) for this

Mineral Resource Estimate.

8

.

Mineral resources are not mineral reserves as they have not demonstrated economic viability. The quantity and grade of reported Indicated

and Inferred mineral resources in this news release are uncertain in nature and there has been insufficient exploration to define any

measured resource; however, it is reasonably expected that a significant portion of Inferred Mineral Resources could be upgraded into

Indicated Mineral Resources with further exploration.

9

.

Micon's QPs have not identified any legal, political, environmental, or other factors that could materially affect the potential development of

the mineral resource estimate.

Quality Assurance and Quality Control Procedures

RC samples are collected at the drill rig by a qualified subcontractor in conjunction with rock chips for

logging. Samples are collected every 5 ft (~1.52 m) for the entire hole, with the exception of the first

sample of each hole where intervals may be longer depending on recovery while casing is set. Large

retention bags (36"x24") are marked with the depth of the interval and small sample bags (12"x 20") are

marked with a sample ID corresponding to a sample tag book where depth interval and hole information

are recorded. The sample is collected in a clean bucket from under the cyclone. The full sample and

bucket are weighed and then the sample is split using a riffle splitter (1/8 split) into a retention bag and a

sample bag. The retention and sample bags are weighed on a scale, and the total weight, retention bag

weight, and sample bag weight are recorded in the corresponding sample tag book.

A representative spear sample is taken from the waste bucket and is dry and wet sieved on site. Chips

from the sieved sample are placed in a chip tray marked with the corresponding depth interval. Retention

bags are folded over and are stacked neatly at the drill site; sample bags are closed and arranged into

sample shipments at the drill site. A geologist regularly checks in on each drill to ensure sample integrity,