Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TAJ.V ·

Tajiri Commences Drilling at the advanced Morley Prospect, Burkina Faso

Exploration Programs

Tajiri Commences Drilling at the advanced

Morley Prospect, Burkina Faso

VANCOUVER, BC,

Sept. 21, 2020

/CNW/ -

Tajiri Resources Corp.

(the "Company") (TSXV: TAJ)

is pleased to announce that reverse circulation drilling commenced

September 18, 2020

at the

advanced Morley Prospect situated on the Company's wholly owned ~1,100km

2

Reo Project,

located 150 km west northwest of the capital of

Burkina Faso

, Ouagdougou.

At

Morley

, where historic drilling, conducted between 2008 and 2012, intersected shallow high-grade

gold intersections such as:

32m

@ 17.5g/t

from

2m

,

6m

@ 38.9g/t

from

8m

,

2m

@ 18.0g/t

from

17m

,

10m

@ 9.6g/t

from

74m

,

1m

@ 75.5.5g/t

from

33m

,

6m

@ 4.1g/t

from

60m

,

8m

@ 9.4g/t

from

16m

,

10m

@ 7.6g/t

from

16m

;

Gold mineralisation is hosted by low sulphidation quartz veins in granodiorite situated ~400m from a

regional scale contact between the granodiorite and greenstones. Modelling of mineralisation at

Morley

by Tajiri suggests that the orientation of mineralisation is parallel to a set of late tensional

structures that are disposed at an high angle to regional belt strike and such structures elsewhere in

Burkina host significant high grade gold mineralisation e.g.

Rox Gold's

Yaramoko Mine and West

African Resources' M1 South Deposit.

The purposes of the current

3,600m

drill program are several:

to test strike and dip continuity of mineralisation over a

400m

strike x

130m

down dip portion of

mineralisation;

to test the possibility for stacked lodes within a

400m

(l) x

250m

(w) x

130m

(d) volume mostly

above the main interpreted lode which strikes NW and dips 35-60˚ to the NE;

to obtain samples for preliminary cyanide bottle roll tests;

to delineate any higher grade shoots and their orientation within the broader mineralised

envelope;

to lay a solid foundation for step out drilling, along strike, across strike and down dip; and

to advance the

Morley

prospect toward an initial inferred resource estimate.

Tajiri expects to release first results from its maiden drill program at

Morley

within the next 3 to 4

weeks and expects to complete drilling within 5 to 6 weeks. After which the contracted rig will move

20km south to the K4-K5 prospect where a further

4,000m

of RC drilling is planned.

The Company also wishes to clarify finder fee amounts paid on the closing of a non-brokered

private placement, as reported in news released

August 19

th

, 2020 and updated

September 3

rd

,

2020; being that total finders warrants issued in relation to the offering were 1,116,933 while cash

consideration was

$191,620

. All other details remain the same.

On Behalf of the Board,

Tajiri Resources Corp.

Graham Keevil

,

President, CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

This news release may contain forward-looking statements based on assumptions and judgments of management regarding future events or results. Such statements are

subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements. The

Company disclaims any intention or obligation to revise or update such statements.

SOURCE

Tajiri Resources Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2020/21/c1193.html

%SEDAR: 00027091E

For further information:

Tajiri Resources Corp., Graham Keevil, President, CEO, 604-642-0115 or

Toll Free 866-345-0115604-642-0116 (FAX), [email protected], www.tajirigold.com

CO: Tajiri Resources Corp.

CNW 18:06e 21-SEP-20