Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

SYH.V ·

Skyharbour’s Partner Mustang Energy Corp. Announces Results of TDEM Survey Over the 914W Property Vancouver, BC - Skyharbour Resources Ltd . (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt: SC1P) (“Skyharbour” or the “Company”) is pleased to announce that partner company Mustang

Exploration Programs

Suite 1030 – 505 Burrard Street, Vancouver, BC, Canada, V7X1M5

www.skyharbourltd.com

TSX-V Trading Symbol: SYH

Email: [email protected]

Telephone: (604) 558-5847

Facsimile: (604) 687-3119

November 6th, 2025

News Release

Skyharbour’s Partner Mustang Energy Corp. Announces Results of TDEM Survey Over the

914W Property

Vancouver, BC - Skyharbour Resources Ltd . (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt:

SC1P) (“Skyharbour” or the “Company”) is pleased to announce that partner company Mustang

Energy Corp. (“Mustang”) received the results of a high resolution HTDEM survey at the 914W

Uranium Project (the “Project”), totaling 136 line -kms. The Project has road access and is in a

prospective region known for its mineral potential south of the Athabasca Basin. The 914W TDEM

survey successfully defined a well-developed conductive zone within the project. The geometry and

strength of the anomaly are consistent with graphitic basement rocks or fault-bound alteration zones,

both favorable for unconformity -type uranium mineralization. Mustang Energy may acquire a 75%

interest in the Project by issuing common shares having an aggregate value of CAD $480,000,

making aggregate cash payments of $275,000 to Skyharbour, and incurring an aggregate of

$800,000 in exploration expenditures on the property over a three-year period.

914W Property Map:

https://skyharbourltd.com/_resources/projects/914W-image2.jpg

The Xcite™ helicopter-borne Time Domain Electromagnetic (TDEM) survey was flown by Axiom

Exploration Group Ltd. over the Project, covering approximately 136 line -km. The survey

simultaneously collected electromagnetic, magnetic, and radiometric data to map conductive,

magnetic, and radiometric variations related to prospective uranium-bearing structures. The survey

was flown in addition to Mustang’s nearby Spur project TDEM survey.

Early-time channels (0.014–0.045 ms) show strong, high -amplitude EM responses along the east -

central portion of the 914W block, indicating shallow conductive zones near surface. This conductor

persists through mid-to-late time channels (0.12–0.56 ms) and may represent graphitic horizons or

fault-controlled alteration zones, a key uranium pathfinder feature in the Athabasca Basin margin

setting. The intensity and continuity of the anomaly diminish slightly with later decay times, consistent

with a discrete subsurface conductor rather than surficial noise.

HTDEM Survey Shows High-Amplitude EM Responses Along East-Central 914W Block:

https://www.skyharbourltd.com/_resources/maps/Airborne-HTDEM-survey-over-914W-2.png

The inversion modelling from 50 m to 350 m depth shows consistent conductive features. From 50

– 150 m the depth slices show a strong, laterally continuous conductive zone trending east-northeast

across the east-central portion of the property. The 250 to 350 m depth slices show the conductivity

anomaly persists at depth.

2025 914W Soil Sampling Results:

A one-week prospecting and soil sampling program was carried out on claim 914W in May of 2025.

In total, 25 rock samples and 142 soil samples were collected. The soil sampling focused on the

northwest corner of the property immediately south of the Scurry Rainbow E Zone and the Don Lake

Trenches where no outcrop exposure is present. Rock sampling was limited by the scarcity of

exposed outcrop across the property.

Conductivity Depth Slice (150m) Shows Strong EM Response in East-Central 914W Block:

https://www.skyharbourltd.com/_resources/maps/Airborne-HTDEM-survey-over-914W-1.png

Although the program did not identify any new significant discoveries, particularly in the southern

portion of the Project, the northern soil grid returned anomalous uranium values. In this program, five

soil samples from the southern portion of the grid exceeded 4 ppm U, which would be considered

slightly elevated.

Prospecting efforts did not confirm elevated uranium values in the southwestern part of the grid,

likely due to limited outcrop exposure. However, anomalous uranium values were identified in the

northeastern portion of the soil grid, including a granitic gneiss sample that returned 42.3 ppm U.

Sampling Methods:

Samples were submitted to SRC Laboratories in Saskatoon, SK, for analysis. Both rock and soil

samples were tested using ICP-MS with four-acid digestion, ICP total four-acid digestion, and U₃O₈

assays by ICP reported in weight percent.

Horizon A soil samples were collected by removing surface vegetation with a trowel and sampling

the uppermost layer of topsoil. Rock samples were taken from exposed basement boulders or

granitic outcrops that returned elevated counts per second (cps) readings.

2025 914W Project Soil and Rock Sample Assay Results – U Ppm:

https://www.skyharbourltd.com/_resources/maps/914W-project-soil-and-rock-sample.png

914W Property Summary:

The 914W Project consists of one claim covering 1,260 hectares approximately 48 km southwest of

Cameco’s Key Lake Operation. Highway 914 runs through the western edge of the project, providing

excellent access for exploration. Historical geological mapping of the property and the surrounding

area has shown that the project is predominantly underlain by prospective Wollaston Supergroup

pelitic and psammitic to arkosic gneisses of the Western Wollaston Domain, which hosts significant

unconformity-related uranium mineralization in the Athabasca Basin as well as pegmatite -hosted

uranium mineralization elsewhere in the Wollaston Domain.

Despite the project’s proximity to Highway 914 and prospective geology, the project has seen limited

modern exploration work. The earliest work on the 914W property included airborne EM and

magnetic surveys and ground geological reconnaissance in 1968 -1970, lake water and sediment

sampling in 1976, ground VLF -EM, magnetic, and radiometric surveys, geological map ping,

trenching, as well as sampling on the project and surrounding areas. Immediately to the north of the

914W property, prospecting led to the discovery of the Scurry Rainbow Zone E (SMDI1961) and the

Don Lake Trenches (SMDI 1983), where up to 1,288 ppm U was encountered in drill hole ML -1

(SMDI1961) in a pyroxene-rich unit, and surface prospecting revealed up to 0.64% U3O8 in a trench

at Don Lake Zone E (SMDI 1983). More recently, the project has seen airborne geophysical

coverage by helicopter-borne VTEM (southern half) in 2005 and Tempest TDEM (northern half) in

2007, with prospecting, geological mapping, rock/sediment sa mpling and lake sediment sampling

occurring on the project and surrounding areas in 2005 -2007. The project remains underexplored

and prospective for unconformity-related and pegmatite-hosted uranium and REE’s.

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Serdar

Donmez, P.Geo., VP of Exploration for Skyharbour as well as a Qualified Person.

About Mustang Energy Corp.:

Mustang Energy is a Canadian mineral exploration company focused on the discovery and

development of high-potential uranium and critical mineral assets. The company holds a portfolio of

147,153 hectares of strategically located properties in Saskatchewan's Athabasca Basin—one of the

world’s premier uranium districts. Mustang is advancing early -stage exploration through modern

techniques and a disciplined, data -driven approach. The Company is committed to building long -

term value through responsible explorat ion and a focus on high -impact targets in underexplored

areas.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca

Basin and is well positioned to benefit from improving uranium market fundamentals with interest in

thirty-seven projects covering over 616,000 hectares (over 1.5 million acres) of land. Skyharbour has

acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the

Moore Uranium Project, which is located 15 kilometres east of Denison's Wheeler River project and

39 kilometres south of Cameco's McArthur River uranium mine. Moore is an advanced -stage

uranium exploration property with high -grade uranium mineralization in several zones at the

Maverick Corridor. Adjacent to the Moore Project is the Russell Lake Uranium Project, in which

Skyharbour is operator with joint -venture partner RTEC. The project hosts widespread uranium

mineralization in drill intercepts over a large property area with exploration upside potential. The

Company is actively advancing these projects through exploration and drilling programs.

Skyharbour also has joint ventures with industry leader Orano Canada Inc., Azincourt Energy, and

Thunderbird Resources at the Preston, East Preston, and Hook Lake Projects, respectively. The

Company also has several active earn-in option partners, including CSE-listed Basin Uranium Corp.

at the Mann Lake Uranium Project; TSX-V listed North Shore Uranium at the Falcon Project; UraEx

Resources at the South Dufferin and Bolt Projects; Hatchet Uranium at the Highway Project; CSE -

listed Mustang Energy at the 914W Project; and TSX-V listed Terra Clean Energy at the South Falcon

East Project.

In aggregate, Skyharbour has now signed earn-in option agreements with partners that total to over

$36 million in partner-funded exploration expenditures, over $20 million worth of shares being issued,

and $14 million in cash payments coming into Skyharbour, assuming that these partner companies

complete their entire earn-ins at the respective projects.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed

long-term partnerships, and the advancement of exploration projects in geopolitically favourable

jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:

https://skyharbourltd.com/_resources/news/SKY_SaskProject_Locator_2025_07_16_v1.jpg

To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website

at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble

President and CEO

For further information contact myself or:

Nicholas Coltura

Investor Relations Manager

Skyharbour Resources Ltd.

Telephone: 604-558-5847

Toll Free: 800-567-8181

Facsimile: 604-687-3119

Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER

ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF

THIS NEWS RELEASE.

The securities offered have not been, and will not be, registered under the United States Securities

Act of 1933, as amended (the "U.S. Securities Act") or any U.S. state securities laws, and may not

be offered or sold in the United States or to, or for th e account or benefit of, United States persons

absent registration or an applicable exemption from the registration requirements of the U.S.

Securities Act and applicable U.S. state securities laws. This press release does not constitute an

offer to sell o r the solicitation of an offer to buy securities in the United States, nor in any other

jurisdiction.

This release includes certain statements that may be deemed to be "forward -looking statements".

All statements in this release, other than statements of historical facts, that address events or

developments that management of the Company expects, are forward-looking statements, including

the Private Placement. Although management believes the expectations expressed in such forward-

looking statements are based on reasonable assumptions, such statements are not guarantees of

future performance, and actual re sults or developments may differ materially from those in the

forward-looking statements. The Company undertakes no obligation to update these forward-looking

statements if management's beliefs, estimates or opinions, or other factors, should change. Factors

that could cause actual results to differ materially from those in forward-looking statements, include

market prices, exploration and development successes, regulatory approvals, continued availability

of capital and financing, and general economic, market or business conditions. Please see the public

filings of the Company at www.sedar.com for further information.