Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SYH.V ·

Skyharbour Partner Company Confirms Priority Targets For Upcoming Drill Program at East Preston Uranium Project

Exploration Programs

Suite 1610 –777 Dunsmuir Street, Vancouver, BC, Canada, V7Y1K4

www.skyharbourltd.com

TSX-V Trading Symbol: SYH

Email: [email protected]

Telephone: (604) 687-3800

Facsimile: (604) 687-3119

December 4th, 2019

News Release

Skyharbour Partner Company Confirms Priority Targets For Upcoming Drill Program at East

Preston Uranium Project

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P)

(the “Com pany”) is pleased to announce that its partner company Azincourt Energy Corp.

(“Azincourt”) has provided an update on plans for the 2020 winter diamond drilling program at the

25,000+ hectare East Preston Uranium Project, located 50km southeast of Patterso n Lake, in the

Western Athabasca Basin, northern Saskatchewan, Canada.

Preston Uranium Project Map:

http://skyharbourltd.com/_resources/maps/SYH-Patterson-Lake.pdf

Drill target prioritization has now been completed, based on the compilation of results from the 2019

winter drill program, the 2018 and 2019 ground -based EM and gravity surveys, and property -wide

helicopter-borne Versatile Time-Domain Electromagnetic (VTEM™ Max) and magnetic surveys.

The upcoming approximately $1.2M drill program will focus on prospective targets in the Five Island

Lakes area with 2000 -2500m (up to 15 holes) of diamond drilling at 8 -to-10 pad locations. The

majority of proposed holes wi ll test multiple subparallel EM conductors (A -zone and B -zone

conductor corridors), in an area of marked structural disruption. Portions of the A -zone were drilled

during the 2019 winter campaign verifying that the conductor hosts significant graphite in s trongly

deformed (sheared) host rocks that offer both fluid pathways and a reducing host rock conducive to

uranium deposition.

Initial drilling is also proposed for the Swoosh zone, a 7+ km long east-west structural lineament with

strongly anomalous, spatially consistent geochemical anomalies (lake sediments, radon, soil) and

coincident magnetic and gravity geophysical anomalies. Two holes are proposed for this area near

the upstream terminus of the geochemical anomalies. This zone is located along strik e -

approximately 5km southwest of the A-zone.

Azincourt’s President and CEO, Alex Klenman stated: “East Preston is a large and highly prospective

uranium exploration project with a comprehensive inventory of compelling drill targets, and we’re

eager to begin testing the target zones .” “Earlier this year a number of factors prevented us from

drilling as much as we had planned. The timing of funding, a late start, and the early onset of warmer

weather cut short our efforts. However, this upcoming campaign has the benefit of not only adequate

funding already in place, but also, we’re significantly ahead of the permitting and preparation process

than we were last time. We will test a number of priority targets this time, so we’re excited to get

going,” continued Mr. Klenman.

2020 Drill Targets – East Preston Uranium Project

http://skyharbourltd.com/_resources/maps/2020-Drill-Targets-East-Preston-Uranium-Project.pdf

Project Location – Western Athabasca Basin, Saskatchewan, Canada

http://skyharbourltd.com/_resources/maps/Project-Location-Western-Athabasca-Basin-

Saskatchewan-Canada.pdf

Option Agreement:

Skyharbour and Clean Commodities entered into an Option Agreement (the “Agreement”) with

Azincourt whereby Azincourt has an earn-in option to acquire a 70% working interest in a portion of

the Preston Uranium Project known as the East Preston Property. Under the Agreement, Azincourt

has issued common shares and will contribute cash and exploration expenditure consideration

totaling up to CAD $3,500,000 in exchange for up to 70% of the applicable property area over three

years. Of the $3,500,000 in project consideration, $1,000,000 will be in cash payments to Skyharbour

and Clean Commodities, as well as $2,500,000 in exploration expenditures over the three -year

period.

About East Preston:

Extensive regional exploration work at East Preston was completed in 2013 -14, including airborne

electromagnetic (VTEM), magnetic and radiometric surveys. Three prospective conductive, low

magnetic signature corridors have been discovered on the property. The three distinct corridors have

a total strike length of over 25 km, each with multiple EM conductor trends identified. Ground

prospecting and sampling work completed to date has identified o utcrop, soil, biogeochemical and

radon anomalies, which are key pathfinder elements for unconformity uranium deposit discovery.

Azincourt completed a winter geophysical exploration program in January -February 2018 that

generated a significant amount of ne w drill targets within the previously untested corridors while

refining additional targets near previous drilling along the Swoosh corridor. Ground -truthing work

confirmed the airborne conductive trends and more accurately located the conductor axes for future

drill testing. The gravity survey identified areas along the conductors with a gravity low signature,

which is often associated with alteration, fault/structural disruption and potentially, uranium

mineralization. The combination/stacking of positive features has assisted in prioritizing targets.

The Main Grid shows multiple long linear conductors with flexural changes in orientation and offset

breaks in the vicinity of interpreted fault lineaments – classic targets for basement -hosted

unconformity uranium deposits. These are not just simple basement conductors; they are clearly

upgraded/enhanced prospectivity targets because of the structural complexity.

The targets are basement-hosted unconformity related uranium deposits similar to NexGen’s Arrow

deposit and Cameco’s Eagle Point mine. East Preston is near the southern edge of the western

Athabasca Basin, where targets are in a near surface environment without Athabasca sandstone

cover – therefore they are relatively shallow targets but can have grea t depth extent when

discovered. The project ground is located along a parallel conductive trend between the PLS-Arrow

trend and Cameco’s Centennial deposit (Virgin River-Dufferin Lake trend).

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43 -101 and reviewed and approved by

Richard Kusmirski, P.Geo., M.Sc., Skyharbour's Head Technical Advisor and a Qualified Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium and thorium exploration projects in Canada's

Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with

six drill-ready projects. Skyharbour has acquired from Denison Mines, a large strategic shareholder

of the Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east

of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium

mine. Moore is an advanced stage uranium exploration property with high grade uranium

mineralization at the Maverick Zone with drill results returning up to 6.0% U 3O8 over 5.9 metres

including 20.8% U 3O8 over 1.5 metres at a vertical depth of 265 metres. Skyharbour has signed

option agreements with Orano Canada Inc. and Azincourt Energy whereby Orano and Azincourt can

earn in up to 70% of the Preston Project through a combined $9,800,000 in total exploration

expenditures, as well as $1,700,000 in total cash payments and Azincourt shares. Preston is a large,

geologically prospective property proximal to Fission Uranium's Triple R deposit as well as NexGen

Energy's Arrow deposit. The Company also owns a 100% interest in the Falcon Point Uranium

Project on the eastern perimeter of the Basin which contains a NI 43-101 inferred resource totaling

7.0 million pounds of U 3O8 at 0.03% and 5.3 million pounds of ThO 2 at 0.023%. The project also

hosts a high-grade surface showing with up to 68% U3O8 in grab samples from a massive pitchblende

vein, the source of which has yet to be discovered. The Company's 100% owned Mann Lake

Uranium project on the east side of the Basin is strategically located adjacent to the Mann Lake Joint

Venture operated by Cameco, where high -grade uranium mineralization was recently discovered.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed

long-term partnerships, and the advancement of exploration projects in geopolitically favourable

jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:

http://skyharbourltd.com/_resources/SYH_Landpackage_2014.jpg

To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website

at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble

President and CEO

For further information contact myself or:

Simon Dyakowski

Corporate Development

Skyharbour Resources Ltd.

Telephone: 604-687-3800

Toll Free: 800-567-8181

Facsimile: 604-687-3119

Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be "forward -looking statements". All

statements in this release, other than statements of historical facts, that address events or developments that

management of the Company expects, are forwa rd-looking statements. Although management believes the

expectations expressed in such forward -looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance, and actual results or developments may differ materially

from those in the forward-looking statements. The Company undertakes no obligation to update these forward-

looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors

that could cause actual results to differ materially from those in forward -looking statements, include market

prices, exploration and development successes, continued availability of capital and financing, and general

economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for

further information.