Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SYH.V ·

Skyharbour Partner Company Azincourt Commences Drill Program at the East Preston Uranium Project

Exploration Programs

Suite 1610 –777 Dunsmuir Street, Vancouver, BC, Canada, V7Y1K4

www.skyharbourltd.com

TSX-V Trading Symbol: SYH

Email: [email protected]

Telephone: (604) 687-3800

Facsimile: (604) 687-3119

February 4th, 2020

News Release

Skyharbour Partner Company Azincourt Commences Drill Program at the East Preston

Uranium Project

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P)

(the “Com pany”) is pleased to announce that its partner company Azincourt Energy Corp.

(“Azincourt”) has commenced drilling at the 25,000+ hectare East Preston Uranium Project located

50 km southeast of Patterson Lake in the Western Athabasca Basin, northern Saskat chewan,

Canada.

Preston Uranium Project Map:

http://skyharbourltd.com/_resources/maps/SYH-Patterson-Lake.pdf

Drilling has begun at pad EP20PADB, which is located along the northern part of the A -Zone

conductor corridor. One hole in the abbreviated 2019 drill campaign targeted a nearby parallel

conductor. Hole EP19003 successfully intersected a graphite -pyrite bearing shear zone that

explains the geophysical conductors determined by previous ground and airborne EM surveys. The

2019 results validate the geophysical interpretation in the Five Island Lakes project area and were

paramount in determining the target priority sequence for the 2020 program.

Drill target prioritization for the current campaign is based on a detailed compilation of results from

the 2019 winter drill program, 2018 and 2019 ground-based EM and gravity surveys, property-wide

helicopter-borne Versatile Time-Domain Electromagnetic (VTEM™ Max) and magnetic surveys.

The approximately $1.2 million drill program is focused on prospective targets in the Five Island

Lakes area with 2000m to 2500m in up to 15 holes of diamond drilling at up to 10 pad locations. The

majority of proposed holes will test multiple subparallel EM conductors (A -zone and B -zone

conductor corridors), in an area of marked structural disruption. Portions of the A -zone were drilled

during the 2019 winter campaign verifying that the conductor hosts significant graphite in strongly

deformed (sheared) host rocks that offer both fluid pathways and a reducing host rock conducive to

uranium deposition.

2020 Drill Targets – East Preston Uranium Project

http://skyharbourltd.com/_resources/maps/2020-Drill-Targets-East-Preston-Uranium-Project.pdf

Initial drilling is also proposed for the Swoosh zone, a 7+ km long east-west structural lineament with

strongly anomalous, spatially consistent geochemical anomalies (lake sediments, radon, soil) and

coincident magnetic and gravity geophysical anomalies. Two holes are proposed for this area near

the upstream terminus of the geochemical anomalies. This zone is located along strike approximately

5 km southwest of the A-zone. The 2020 drill program is being conducted under the guidance and

supervision of Azincourt director Ted O’Connor, M.Sc., P.Geo, and Jarrod Brown, M.Sc., P.Geo,

Chief Geologist and Project Manager with TerraLogic Exploration.

Option Agreement:

Skyharbour and Dixie Gold Inc. entered into an Option Agreement (the “Agreement”) with Azincourt

whereby Azincourt has an earn-in option to acquire a 70% working interest in a portion of the Preston

Uranium Project known as the East Preston Property. Under the Agreement, Azincourt has issued

common shares and will contribute cash and exploration expenditure consideration totaling up to

CAD $3,500,000 in exchange for up to 70% of the applicable property area over three years. Of the

$3,500,000 in project consideration, $1,000,000 will be in cash payments to Skyharbour and Dixie

Gold, as well as $2,500,000 in exploration expenditures over the three-year period.

Project Location – Western Athabasca Basin, Saskatchewan, Canada

http://skyharbourltd.com/_resources/maps/Project-Location-Western-Athabasca-Basin-

Saskatchewan-Canada.pdf

About East Preston:

Extensive regional exploration work at East Preston was completed in 2013 -14, including airborne

electromagnetic (VTEM), magnetic and radiometric surveys. Three prospective conductive, low

magnetic signature corridors have been discovered on the property. The three distinct corridors have

a total strike length of over 25 km, each with multiple EM con ductor trends identified. Ground

prospecting and sampling work completed to date has identified outcrop, soil, biogeochemical and

radon anomalies, which are key pathfinder elements for unconformity uranium deposit discovery.

Azincourt completed a winter g eophysical exploration program in January -February 2018 that

generated a significant amount of new drill targets within the previously untested corridors while

refining additional targets near previous drilling along the Swoosh corridor. Ground -truthing work

confirmed the airborne conductive trends and more accurately located the conductor axes for future

drill testing. The gravity survey identified areas along the conductors with a gravity low signature,

which is often associated with alteration, fault/str uctural disruption and potentially, uranium

mineralization. The combination/stacking of positive features has assisted in prioritizing targets.

The Main Grid shows multiple long linear conductors with flexural changes in orientation and offset

breaks in t he vicinity of interpreted fault lineaments – classic targets for basement -hosted

unconformity uranium deposits. These are not just simple basement conductors; they are clearly

upgraded/enhanced prospectivity targets because of the structural complexity.

The targets are basement-hosted unconformity related uranium deposits similar to NexGen’s Arrow

deposit and Cameco’s Eagle Point mine. East Preston is near the southern edge of the western

Athabasca Basin, where targets are in a near surface environment wi thout Athabasca sandstone

cover – therefore they are relatively shallow targets but can have great depth extent when

discovered. The project ground is located along a parallel conductive trend between the PLS-Arrow

trend and Cameco’s Centennial deposit (Virgin River-Dufferin Lake trend).

In early 2019 Azincourt conducted a small initial di amond drill program totaling 552m . The results

confirmed the prospectivity of the East Preston project, as basement lithologies and graphitic

structures intersected at East Preston were found to be very similar and appear to be analogous to

the Patterson Lake South-Arrow-Hook Lake/Spitfire uranium deposit host rocks and setting.

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43 -101 and reviewed and approved by

Richard Kusmirski, P.Geo., M.Sc., Skyharbour's Head Technical Advisor and a Qualified Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium and thorium exploration projects in Canada's

Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with

six drill-ready projects. Skyharbour has acquired from Denison Mines, a large strategic shareholder

of the Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east

of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium

mine. Moore is an advanced stage uranium exploration property with high grade uranium

mineralization at the Maverick Zone with drill results returning up to 6.0% U 3O8 over 5.9 metres

including 20.8% U 3O8 over 1.5 metres at a vertical depth of 265 metres. Skyharbour has signed

option agreements with Orano Canada Inc. and Azincourt Energy whereby Orano and Azincourt can

earn in up to 70% of the Preston Pro ject through a combined $9,800,000 in total exploration

expenditures, as well as $1,700,000 in total cash payments and Azincourt shares. Preston is a large,

geologically prospective property proximal to Fission Uranium's Triple R deposit as well as NexGen

Energy's Arrow deposit. The Company also owns a 100% interest in the Falcon Point Uranium

Project on the eastern perimeter of the Basin which contains a NI 43 -101 inferred resource totaling

7.0 million pounds of U 3O8 at 0.03% and 5.3 million pounds of ThO 2 at 0.023%. The project also

hosts a high-grade surface showing with up to 68% U3O8 in grab samples from a massive pitchblende

vein, the source of which has yet to be discovered. The Company's 100% owned Mann Lake

Uranium project on the east side of the Basin is strategically located adjacent to the Mann Lake Joint

Venture operated by Cameco, where high -grade uranium mineralization was recently discovered.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed

long-term partnerships, and the advancement of exploration projects in geopolitically favourable

jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:

http://skyharbourltd.com/_resources/SYH_Landpackage_2014.jpg

To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website

at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble

President and CEO

For further information contact myself or:

Simon Dyakowski

Corporate Development

Skyharbour Resources Ltd.

Telephone: 604-687-3800

Toll Free: 800-567-8181

Facsimile: 604-687-3119

Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be "forward -looking statements". All

statements in this release, other than statements of historical facts, that address events or developments that

management of the Company expects, are forwa rd-looking statements. Although management believes the

expectations expressed in such forward -looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance, and actual results or developments may differ materially

from those in the forward-looking statements. The Company undertakes no obligation to update these forward-

looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors

that could cause actual results to differ materially from those in forward -looking statements, include market

prices, exploration and development successes, continued availability of capital and financing, and general

economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for

further information.