Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SYH.V ·

Skyharbour Intersects Additional Uranium Mineralization at High-Grade Moore Lake Project and Plans for Upcoming Winter Drill Programs

Drill Results

Suite 1610 – 777 Dunsmuir Street, Vancouver, BC, Canada, V7Y 1K4

www.skyharbourltd.com

TSX-V Trading Symbol: SYH

Email: [email protected]

Telephone: (604) 687-3376

Facsimile: (604) 687-3119

October 13th, 2022

NEWS RELEASE

Skyharbour Intersects Additional Uranium Mineralization at High-Grade Moore Lake

Project and Plans for Upcoming Winter Drill Programs

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt:

SC1P) (the “Company”) is pleased to announce assay results from the 2022 spring diamond

drilling program at its 100% owned, 35,705 hectare Moore Uranium Project , located

approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to

regional infrastructure for Cameco’s Key Lake and McArthur River operations in the Athabasca

Basin, Saskatchewan. Skyharbour plans to continue advancing Moore through additional drilling

in conjunction with the fully funded, multi-phased drill programs being planned at the Company’s

recently acquired Russell Lake Uranium Project. News is forthcoming on the details of these drill

programs.

Moore Uranium Project Claims Map:

https://skyharbourltd.com/_resources/images/moore-project-map-20221012.jpg

Jordan Trimble, President and CEO of Skyharbour Resources, stated: “We continue to discover

and delineate new zones of uranium mineralization at our high-grade Moore Project and have

plans for future drilling and exploration at the property. This will be tied in with the inaugural drill

program at our newly optioned Russell Lake Uranium Project where we are plann ing to

commence the first of several phases of drilling shortly. We are fully funded for our largest-ever

drill campaign over the next twelve months at our core projects, and additional news flow will be

generated at several of our secondary projects funded by our partner companies Azincourt

Energy, Valor Resources, Basin Uranium Corp., Medaro Mining, and Yellow Rocks Energy, as

they commence follow -up drill ing and exploration programs at these respective projects.

Skyharbour is very well positioned to benefit from the accelerating uranium market resurgence

with a catalyst-rich year ahead.”

Highlights:

• Hole ML22-07 was drilled within the western part of the Maverick East Zone. It intersected

5.0 metres of unconformity- and basement-hosted mineralization returning 0.13% U 3O8

starting at 275.9 m etres. The mineralization was associated with significant structural

disruption and strong alteration of the sandstone and upper basement and anomalous U,

with uranium -bearing fractures encountered approximately 25 metres below the

unconformity.

2

• Drilling in the newly identified Grid Nineteen area continue d to intersect structurally

disrupted, altered, and geochemically anomalous sandstone and basement rocks,

including variably graphitic pelitic gneisses. All four holes drilled in 2022 showed

enrichment in uranium, boron, and other pathfinder elements , with up to 382 ppm U

encountered in hole ML22-03 within graphitic pelitic gneisses. A significant unconformity

offset was also discovered between holes ML21-07 and ML22-02, which is believed to be

related to the strong structural disruption of the sandstone seen in three out of the four

holes dri lled here in 2022. The results of drilling along the Grid Nineteen conductors

continue to be encouraging and further work is recommended to follow up on the

anomalous structures along strike and at depth as the geochemistry, structure and

alteration are suggestive of unconformity -related uranium mineralization in the area.

Significant untested targets remain on both conductors in this area.

• Drilling in the Viper area continued to show that this part of the Maverick conduct ive

corridor is geochemical ly anomalous with uranium mineralization of 0.11% U 3O8

encountered over 1.0 metres in the basement of ML22 -05. Anomalous uranium of ≤314

ppm U was also encountered in hole ML22-06.

• Substantial portions of the Maverick corridor remain to be systematically drill tested

leaving robust discovery potential along strike as well as at depth in the basement rocks.

Skyharbour is planning a fully -funded winter drill program which will include follow-up

drilling at the Moore Project.

Summary of 2022 Drilling Program:

Drilling on the Moore Uranium Project over the spring of 2022 totalled 2,467 metres in seven

diamond drill holes. Four exploratory holes (ML22-01 to -04) were drilled at the Grid Nineteen

target conductors, two exploratory holes (ML22-05 and -06) were drilled in the Viper target area,

and one hole (ML22-07) was drilled at the Maverick East Zone.

Moore Uranium Project Regional Grid Targets Map:

http://skyharbourltd.com/_resources/maps/Moore-Lake-Property-Wide.jpg

Future drill programs will continue to test targets identified by modelling down plunge of the

Maverick East Zone, targets along the Grid Nineteen conductors where anomalous geochemistry

and geology have been identified, and test other regional targets at the project where the

geochemistry/pathfinders and geology are strongly indicative of potentially uraniferous

mineralizing systems.

Maverick East Zone Drilling:

The final hole of the drill program, hole ML22 -07 was drilled to test mineralization between

historical holes ML-211 (which intersected 8.5m of 0.13% U 3O8) and ML-212 (which intersected

3.4 m of 0.19% U 3O8). It successfully intersected 5.0 m of 0.13% U 3O8 starting at 275.9 m,

straddling the unconformity and extending into the basement rocks to a depth of 280.9 m. There

is also enrichment in Ni (≤2090 ppm Ni), Cu (≤2250 ppm Cu), Zn (≤4450 ppm Zn), As (≤1510 ppm

As), Co (≤399 ppm Co), and V (≤2000 ppm V) associated with the mineralization. The hole

contained structurally disrupted and clay altered to replaced sand stone, graphitic pelitic gneiss,

granitic pegmatite, and Archean granite. The mineralization was also accompanied by anomalous

uranium in the entire sandstone column, local boron enrichment (≤2740 ppm B) in the sandstone,

and local elevated pathfinders in the basement, including nickel, arsenic, uranium, vanadium,

zinc, and boron. Of note is the existence of fractures containing uranium minerals associated with

strong clay and bleaching and uranium (≤413 ppm U), nickel (≤201 ppm Ni), and boron (≤2040

3

ppm B) enrichment about 30 m below the unconformity at a depth of 304.8 m. This hole

further defined this portion of the Maverick East Zone, providing additional information for future

drilling.

Moore Uranium Project Maverick East Zone Drilling Map:

https://skyharbourltd.com/_resources/images/2022-10-Maverick-East-Drilling.jpg

Grid Nineteen Drilling:

The first four holes of the 2022 drill program were drilled on at the relatively new Grid Nineteen

target, approx. 9.5 km NE of the Main Maverick Zone, to follow up on the promising alteration,

structure, and geochemistry encountered in holes ML21-07, -08, and -09. The first hole, ML22-

01, was testing the up -dip projection of the conductor in hole ML21-09 and appears to have

overshot the target, since no graphitic units were encountered. The sandstone in hole ML22-01

contained multiple fault zones with local strong chlorite, tourmaline veins, and druzy quartz/pyrite

filled fractures. There is local uranium enrichment and anomalous boron (≥100 ppm B) throughout

most of the sandstone with a max of 804 ppm B just above the unconformity . The basement in

this hole consisted of variably altered intrusives and pelitic gneiss with local significant boron

enrichment (≤2360 ppm B) associated with dravite and quartz veins, faulting and variable chlorite

alteration.

Moore Uranium Project - Grid Nineteen Drilling:

https://skyharbourltd.com/_resources/images/2022-10-Grid-19-Drilling.jpg

Hole ML22-02 was drilled to test the up -dip projection to the unconformity of the uranium

mineralization encountered in hole ML21-07. The sandstone contained prospective structure and

alteration associated with an apparent 4 0 m offset of the unconformity between holes ML22-02

and ML -21-07. The sandstone has local boron ( ≤1610 ppm B) and uranium (≤14.9 ppm U)

enrichment associated with faulting and the unconformity. The basement rocks consisted of

strongly chloritized psammitic gneiss and anatexite followed by relatively fresh granite and granitic

gneiss with local boron ( ≤485 ppm B) and arsenic ( ≤32 ppm As) enrichment , as well as U

enrichment (≤147 ppm U) . The significant unconformity offset between ML21 -07 and ML22-02,

anomalous mineralization in ML21 -07, and prospective alteration and geochemistry are very

encouraging as they are common features of uranium deposits in the Athabasca Basin.

Hole ML22-03 was drilled 300 m north of ML22 -02 and ML21 -07 in orde r to follow up the

anomalous structure and uranium associated with the Slice Pond structure along strike. While the

sandstone in hole ML22-03 was relatively non -descript, anomalous uranium (392 ppm U) was

intersected in the basement at the contact between the graphitic pelitic gneiss conductor and an

overlying intrusive unit . The graphitic pelitic gneiss is significantly faulted with variable clay,

chlorite, and graphite alteration and boron enrichment (≤365 ppm B). The top 4.5 m of t he

underlying Archean granitic gneiss also is strongly sudoite altered.

The final hole drilled in the Grid Nineteen area, ML22-04, was drilled to further test the conductor

and unconformity offset between ML21 -07 and ML22 -02. Hole ML22-04 encountered str ong

structural disruption of the sandstone below 82.0 m and had uranium and pathfinder element

enrichment (≤5.2 ppm Co, ≤10.2 ppm Cu, ≤35.7 ppm Ni, ≤68.8 ppm V, and ≤63.7 ppm Zn) just

above the unconformity. Faulted metasediments with strong sudoite /chlorite alteration and local

carbonaceous matter were also intersected in the basement. Of note, a strong clay altered fault

zone at the contact between the metasedimentary package and underlying granitoids was

enriched in uranium (≤230 ppm U) and other pathfinder elements (≤2040 ppm Ni, ≤1620 ppm Zn,

and ≤792 ppm B).

Viper Drilling:

Two holes (ML22-05 and -06) were drilled in the Viper area near historical hole ML -525, which

had intersected 4.5 m of uranium mineralization grading 0.23% U3O8 at a depth of 289.4 m. The

4

first hole, ML22-05, tested 10 m east of hole ML- 525 along strike, and intersected 1.0 m of 0.11%

U3O8 in a pegmatite with anomalous Mo (≤182 ppm Mo), Pb (≤147 ppm Pb), Th (≤1260 ppm Th),

and B (≤147 ppm B). Additional uranium enrichment was present at the unconformity (347 ppm

in the 0.5 m immediately below the unconformity) at a depth of 297.7 m. The lower half of the

sandstone in ML22-05 is anomalous in uranium in a sandstone composite at 270 -280 m and in

the basal 0.5 m immediately above the unconformity. Associated with the uranium enrichment is

anomalous boron (≤1850 ppm B). The basement rocks in hole ML22-05 also show local pathfinder

element enrichment with ≤357 ppm Ni, ≤126 ppm Co, ≤192 ppm Cu, ≤136 ppm As, ≤483 ppm Pb,

≤580 ppm V, ≤200 ppm Zn, and ≤315 ppm B.

Moore Uranium Project - Viper Drilling:

https://skyharbourltd.com/_resources/images/2022-10-Viper-Drilling.jpg

The second hole, ML22-06, was drilled to follow up a boron anomaly 20 m north of hole ML-525.

Local anomalous uranium (≤314 ppm U) was encountered within the basement cordierite graphitic

pelitic gneiss es. The graphitic pelitic gneiss also had local pathfinder element enrichment,

including elevated B (≤2560 ppm B), Cu (≤ 736 ppm Cu), Ni (≤ 442 ppm Ni), V (≤326 ppm), Zn

(≤300 ppm Zn), Co (≤168 ppm Co), and As (≤63 ppm As). Associated with the anomalous uranium

is sudoite alteration and quartz veining. The sandstone in ML22 -06 is only locally structurally

disturbed, with a fracture zone from 228.0 m to 232.8 m associated with increased clay and

bleaching, but it contained anomalous uranium below 50.0 m depth. There was also local

anomalous B (≤771 ppm B) in the sandstone below 210.0 m.

Moore Uranium Project Overview:

In June 2016, Skyharbour secured an option to acquire Denison Mine's Moore Uranium Project,

on the southeastern side of the Athabasca Basin, in northern Saskatchewan and has fulfilled its

earn in. The project consists of 12 contiguous claims totaling 35,705 hectares located 42

kilometres northeast of the Key Lake mill, approx. 15 kilometres east of Denison’s Wheeler River

project, and 39 kilometres south of Cameco’s McArthur River uranium mine. Unconformity -type

uranium mineralization was discovered on the Moore Project at the Maverick Zone in April 2001.

Historical drill highlights include 4.03% eU 3O8 over 10 metres, including 20% eU 3O8 over 1.4

metres, in ML-161. In 2017, Skyharbour announced drill results of 6.0% U 3O8 over 5.9 metres,

including 20.8% U 3O8 over 1.5 metres at a vertical depth of 265 metres, in hole ML -199. In

addition to the Maverick Zone, the project hosts othe r mineralized targets with strong discovery

potential which the Company plans to test with future drill programs. The project is fully accessible

via winter and ice roads which simplifies logistics and lowers costs. Large proportions of the

property are accessible in the summer as well.

Moore Lake Uranium Project Geophysics Map:

http://skyharbourltd.com/_resources/maps/MooreLake-Basic-geo-revamp.jpg

Qualified Person:

The technical information in this news release has been prepared in accordance with the

Canadian regulatory requirements set out in National Instrument 43 -101 and reviewed and

approved by David Billard, P.Geo., a Consulting Geologist for Skyharbour as well as a Qualified

Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca

Basin and is well positioned to benefit from improving uranium market fundamentals with fifteen

projects, ten of which are drill -ready, covering over 450,000 hect ares of land. Skyharbour has

acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in

the Moore Uranium Project which is located 15 kilometres east of Denison's Wheeler River project

and 39 kilometres south of Cameco's McArthur River uranium mine. Moore is an advanced-stage

5

uranium exploration property with high -grade uranium mineralization at the Maverick Zone

that returned drill results of ≤ 6.0% U3O8 over 5.9 metres including 20.8% U 3O8 over 1.5 metres

at a vertical depth of 265 metres. Adjacent to the Moore Uranium Project is Skyharbour’s recently

optioned Russell Lake Uranium Project from Rio Tinto, which hosts historical high -grade drill

intercepts over a large property area with robust exploration upside potential. The Company is

actively advancing these projects through exploration and drill programs.

Skyharbour has a joint -venture with industry -leader Orano Canada Inc. at the Preston Project

whereby Orano has earned a 51% interest in the project through explorati on expenditures and

cash payments. Skyharbour now owns a 24.5% interest in the Project. Skyharbour also has a

joint venture with Azincourt Energy at the East Preston Project whereby Azincourt has earned a

70% interest in the project through exploration expenditures, cash payments and share issuance.

Skyharbour now owns a 15% interest in the Project. Preston and East Preston are large,

geologically prospective properties proximal to Fission Uranium's Triple R deposit as well as

NexGen Energy's Arrow deposit. Furthermore, the Company owns a 100% interest in the South

Falcon Point Uranium Project on the eastern perimeter of the Basin, which contains a NI 43-101

inferred resource totaling 7.0 million pounds of U 3O8 at 0.03% and 5.3 million pounds of ThO 2 at

0.023%.

Skyharbour has several active option partners including: ASX-listed Valor Resources on the Hook

Lake Uranium Project whereby Valor can earn-in 80% of the project through CAD $3,500,000 in

exploration expenditures, $475,000 in cash payments over three years and an initial share

issuance; CSE-listed Basin Uranium Corp. on the Mann Lake Uranium Project whereby Basin

Uranium can earn-in 75% of the project through $4,000,000 in exploration expenditures, $850,000

in cash payments as well as share issuances over three years; CSE-listed Medaro Mining Corp.

on the Yurchison Project whereby Medaro can earn -in an initial 70% of the project through

$5,000,000 in exploration expenditures, $800,000 in cash payments as well as share issuances

over three years followed by the option to acquire the remaining 30% of the project through a

payment of $7,500,000 in cash and $7,500,000 worth of shares ; and private Australian entity

Yellow Rocks Energy at the Wallee and Usam Island Uranium Properties whereby Yellow Rocks

can earn-in a maximum 80% interest of the properties through AUD $ 50,000 in cash payments,

AUD $4,500,000 in exploration expenditures as well as share issuances over 3 years, subject to

TSX-V approval.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed

long-term partnerships, and the advancement of exploration projects in geopolitically favourable

jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:

http://www.skyharbourltd.com/_resources/images/SKY-SaskProject-Locator-20220324.jpg

To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website

at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble

President and CEO

For further information contact myself or:

Nicholas Coltura

Corporate Development and Communications

Skyharbour Resources Ltd.

Telephone: 604-949-3807

Toll Free: 800-567-8181

6

Facsimile: 604-687-3119 Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER

ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF

THIS NEWS RELEASE.

The securities offered have not been, and will not be, registered under the United States

Securities Act of 1933, as amended (the "U.S. Securities Act") or any U.S. state securities laws,

and may not be offered or sold in the United States or to, or for the account or benefit of, United

States persons absent registration or an applicable exemption from the registration requirements

of the U.S. Securities Act and applicable U.S. state securities laws. This press release does not

constitute an offer to sell or the solicitation of an offer to buy securities in the United States, nor

in any other jurisdiction.

This release includes certain statements that may be deemed to be "forward-looking statements".

All statements in this release, other than stateme nts of historical facts, that address events or

developments that management of the Company expects, are forward -looking statements,

including the Private Placement. Although management believes the expectations expressed in

such forward-looking statements are based on reasonable assumptions, such statements are not

guarantees of future performance, and actual results or developments may differ materially from

those in the forward-looking statements. The Company undertakes no obligation to update these

forward-looking statements if management's beliefs, estimates or opinions, or other factors,

should change. Factors that could cause actual results to differ materially from those in forward-

looking statements, include market prices, exploration and developme nt successes, regulatory

approvals, continued availability of capital and financing, and general economic, market or

business conditions. Please see the public filings of the Company at www.sedar.com for further

information.