Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SYH.V ·

Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs

Drill Results

Suite 1610 – 777 Dunsmuir Street, Vancouver, BC, Canada, V7Y 1K4

www.skyharbourltd.com

TSX-V Trading Symbol: SYH

Email: [email protected]

Telephone: (604) 687-3376

Facsimile: (604) 687-3119

July 11th, 2024

NEWS RELEASE

Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade

Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt:

SC1P) (the “Company”) is pleased to announce assay results from its 2024 winter diamond drilling

program which totaled 2,864 metres in nine holes at its 100% owned, 35,705 hectare Moore

Uranium Project . The project is located approximately 15 kilometres east of Denison Mine’s

Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake and

McArthur River operations in the Athabasca Basin, Saskatchewan. A highlight from this program

was from hole ML24-08 which intersected 5.0 metres of 4.61% U 3O8 from a relatively shallow

downhole depth of 265.5 metres to 270.5 metres including 10.19% U3O8 over 1.0 metre at the

Main Maverick Zone. Skyharbour plans to continue advancing Moore through additional drilling in

2024 in conjunction with a fully-funded summer drill program to follow-up on the recently reported

Fork target uranium discovery at the Company’s adjacent Russell Lake Uranium Project. The

combined drill campaign this summer is planned to consist of approximately 7,000 - 8,000 metres

with details forthcoming.

Moore Uranium Project Claims Map:

https://skyharbourltd.com/_resources/images/moore-project-map-20221012.jpg

Jordan Trimble, President and CEO of Skyharbour Resources, stated: “The drill results

announced here demonstrate the high -grade, shallow endowment of uranium mineralization at

the Main Maverick Zone. We continue to expand this main zone, and will be drilling this summer

to further delineate the numerous high-grade zones of uranium on the Maverick Corridor taking

advantage of regional infrastructure including the exploration camp at our adjacent Russell Lake

project to bring our costs down. The multi -kilometre Maverick Corridor offers strong discovery

potential along strike and at depth in the underlying basement rocks , and we also plan to test

prospective regional targets that have had limited drill -testing historically. With the recent

discovery of high -grade uranium mineralization at Russell in the Fork Zone, this has been an

exciting season of drilling thus far for Skyharbour with much more news to come at both Moore

and Russell as well as at the various partner-funded projects.”

Highlights:

2

• Hole ML24-08 is one of the better holes drilled at the Main Maverick Zone to date. It

intersected an interval of high-grade mineralization grading 4.61% U3O8 over 5.0m

starting at 265.5m downhole including 3.0m of 7.30% U3O8 and 1.0m of 10.19% U3O8,

with up to 10.8% Ni.

• Hole ML24-03 intersected a broad interval of high-grade mineralization grading 1.11%

U3O8 over 11.5m starting at 266.8m downhole including 2.0 metres of 5.87% U3O8.

• All holes drilled in the Main Maverick Zone during the winter of 2024 intersected

significant uranium mineralization with the goal of further expanding and delineating the

known zone of mineralization.

• There remains expansion potential at both of the high-grade Main Maverick and

Maverick East Zones. Furthermore, substantial portions of the 4.7 kilometre long

Maverick corridor remain to be systematically drill-tested leaving robust discovery

potential along strike as well as at depth in the basement rocks.

• Two exploratory holes drilled in the Grid 19 area tested the Slice Pond and 19 East

Conductors and intersected structurally disrupted graphitic pelitic accompanied by

significantly anomalous pathfinder element geochemistry.

• Preparation for a fully-funded 2,500 - 3,000 metre summer drill program at Moore

focused at the Maverick Zones is underway, as is a follow-up 4,500 – 5,000 metre drill

program at the Russell Lake Project where drilling at the newly discovered Fork Zone

returned high-grade uranium mineralization hosted in the sandstone.

Summary of 2024 Winter Drilling Program at Moore:

Drilling on the Moore Project over the winter of 2024 totaled 2,864 metres in nine holes. Seven

holes (ML24-01 to -04 and ML24-7 to -09) were drilled at the Main Maverick Zone and two holes

were drilled on the Grid 19 target conductors (ML21-05 to -06).

Moore Uranium Project Regional Grid Targets Map:

http://skyharbourltd.com/_resources/maps/Moore-Lake-Property-Wide.jpg

Main Maverick Zone Drilling:

Seven holes totalling 2,221 metres were drilled at the Main Maverick Zone to better define and

expand the shallow high-grade mineralized zone. All of these holes were drilled vertically and

intersected significant uranium mineralization at the unconformity centred around 265 .0 metres

to 275.0 metres downhole depth. The majority of the high -grade uranium mineralization at the

Main Maverick Zone is sandstone-hosted situated just above the unconformity.

Main Maverick Zone Drilling Map:

https://www.skyharbourltd.com/_resources/maps/Maverick-Main-Drilling-2024_Magnetics.jpg

The highlight w as hole ML24-08, which intersected 5.0 metres of 4.61% U 3O8 between 265.5

metres and 270.5 metres depth including 3 .0 metres of 7.3 0% U 3O8 between 266.0 metres to

269.0 metres depth. Another notable hole was ML 2 4-03, which intersected a broad interval of

mineralization grading 1.11% U 3O8 over 11.5 metres between 266.8 metres to 278.3 metres

depth, including 5.87% U 3O8 over 2 .0 metres. The results of the drilling are reported in the

following table:

Hole From To Width Assay (% U3O8)

3

ML24-01 274.9 275.4 0.5 0.112

ML24-02 265.0 271.5 6.5 **0.914

ML24-03 266.8 278.3 11.5 1.112

incl 270.3 272.3 2.0 5.87

ML24-04 262.2 267.5 6.2 *0.323

incl 266.0 266.9 0.9 *1.142

ML24-07 267.1 271.1 4.0 0.729

incl 267.10 268.10 1.0 1.870

ML24-08

incl

265.5

266.0

270.5

299.0

5.0

3.0

4.610

7.30

incl

incl

267.5

268.0

268.5

268.5

1.0

0.5

10.19

14.90

ML24-09 270.0 273.1 3.1 *0.330

and 282.5 283.0 0.5 0.127

*Grade Equivalent U3O8 from downhole gamma probing

** Composite of Chemical and Grade Equivalent U3O8

The geology and geochemistry of all the drill holes are typical of the Main Maverick Zone. The

zone is characterized by a subvertical fault intersecting basement rocks consisting primarily of

graphitic and non -graphitic pelitic gneiss along with Hudsonian and Archaean granites,

accompanied by local pegmatite bodies. The overlying sandstone is typically intensely faulted,

de-silicified, clay enriched and highly bleached with sooty pyrite and local silicification. The depth

to the unconformity is approximately 270.0 metres where the sandstone and basement rocks are

clay-altered to -replaced with uranium mineralization and with local intervals of basement-hosted

uranium mineralization. The sandstone column is highly anomalous in Boron (≤3,320 ppm B) with

the basement rocks within and surrounding the mineralization highly anomalous in Vanadium

(≤5,990 ppm V) and Lead (≤5,000 ppm Pb), as well as up to 14.7% Nickel and 1.77% Cobalt in

an individual 0.5 metre mineralized sample in hole ML24-02 at 269.9 metres that also returned

1.18% U3O8. Furthermore, a 0.5 metre sample in hole ML24-08 intersected 10.8% Nickel along

with 14.9% U3O8.

Grid Nineteen Drilling:

Two exploratory holes totalling 643.0 metres were drilled at the Grid 19 target area approximately

10km NE of the Maveri ck Zones, with one hole drilled on the Slice Pond Conductor (ML24-05)

and the other hole on the 19 East conductor (ML24-06).

Grid 19 Zone Drilling Map:

https://www.skyharbourltd.com/_resources/images/Grid-Nineteen-2024-Winter-Drill-Map.jpg

Hole ML24-05 was drilled as a follow-up to the mineralization intersected in ML22-03 on the Slice

Pond target at Grid -19. A moderately bleached, weakly fractured sandstone column was

intersected down to the unconformity at 205.0 metres. Granitic gneiss, silicified metasediments

and quartzite were intersected to 229.5 metres downhole, above locally faulted graphitic pelitic

gneiss with accessory calc-silicate and iron formation down to 258.0 metres. Pink foliated granite

and pegmatite was then intersected until the end of hole at 290.0 metres. The hole intersected

encouraging pathfinder geochemistry including anomalous Cu ( ≤668 ppm), Th ( ≤140 ppm), V

(≤244 ppm) and B (≤1080 ppm) within several of the graphitic faults.

Hole ML24-06 was drilled on the 19 East Conductor to follow-up on structurally disrupted graphitic

gneisses and anomalous geochemistry previously encountered in ML21 -08. Weakly to

moderately bleached sandstone was drilled to 170 .0 metres becoming moderately to strongly

bleached and limonitic down to the unconformity at 193.2 metres. Bleached, hematized, and

chloritized garnet-bearing granite was intersected until 211.8 metres followed by locally sheared

4

and faulted graphitic metasediments intercalated with granite and accessory calc -

silicate, amphibolite, and iron formation until the end of hole at 353.0 metres. Major graphitic

structures were encountered within the basement and determined to be congruent with similar

structures in ML21 -08. Encouraging pathfinder geochemistry was identified within the graphitic

shears, including anomalous B (≤338 ppm), V (≤185 ppm), Ni (≤379 ppm) and Cu (≤340 ppm).

2024 Summer and Fall Drilling Plans:

The Company is planning for an additional fully-funded 2,500 - 3,000 metres of drilling in seven

to nine holes at the Main Maverick and Maverick East Zones to further expand, characterize and

define the extents of the mineralized zones. Both of these high-grade zones are open along strike

and at depth with less historical drilling testing the underlying basement rocks. This drilling will

take place in conjunction with a 4,500 – 5,000 metre diamond drilling program at the adjacent

Russell Lake Project, where the recently completed winter drilling program identified a significant

new zone of uranium mineralization at the Fork Zone . Drill hole RSL24 -02 in that program

intersected 0.721% U3O8 over 2.5 metres including 2.99% U 3O8 over 0.5 metres, approximately

500 metres from Highway 914. Both drilling programs will be run using the Company’s McGowan

Lake camp on Highway 914 as a base of operations making exploration at both properties very

cost effective.

Moore Uranium Project Overview:

In June 2016, Skyharbour secured an option to acquire Denison Mine's Moore Uranium Project,

on the southeastern side of the Athabasca Basin, in northern Saskatchewan and has since fulfilled

its earn in. The project consists of 12 contiguous claims totaling 35,705 hectares located 42

kilometres northeast of the Key Lake mill, approx. 15 kilometres east of Denison’s Wheeler River

project, and 39 kilometres south of Cameco’s McArthur River uranium mine. Unconformity-hosted

uranium mineralization was discovered on the Moore Project at the Maverick Zone with historical

drill highlights consisting of 4.03% eU3O8 over 10 metres, including 20% eU3O8 over 1.4 metres,

in ML-161. In 2017, Skyharbour announced drill results of 6.0% U 3O8 over 5.9 metres, including

20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres, in hole ML-199. In addition to the

Main and East Maverick Zones, the project hosts other mineralized targets with strong discovery

potential which the Company plans to test with future drill programs. The project is fully accessible

via winter and ice roads which simplifies logistics and lowers costs. Large proportion s of the

property are accessible in the summer as well.

Moore Lake Uranium Project Geophysics Map:

http://skyharbourltd.com/_resources/maps/MooreLake-Basic-geo-revamp.jpg

QA/QC, Radiometric Equivalent Grades and Spectrometer Readings:

All drill intervals above are downhole length and sampling procedures and QA/QC protocols for

geochemical results as well as a description of downhole gamma probe grade calculations and

protocols are below. All drill core samples are shipped to the Saskatchewan Research Council

Geoanalytical Laboratories (SRC) in Saskatoon, Saskatchewan under the care of Skyharbour

personnel for preparation, processing, and multi-element analysis by ICP-MS and ICP-OES using

total (HF:NHO3:HClO4) and partial digestion (HNO3:HCl), boron by fusion, and U3O8 wt% assay

by ICP -OES using higher grade standards. Assay samples are chosen based on downhole

probing radiometric equivalent uranium grades and scintillometer (Radiation Solutions RS -125)

peaks. Assay sample intervals compri se 0.5 metre continuous half -core split samples over the

mineralized interval. These samples may also be selected for density determination using the lost

wax method. With all assay samples, one half of the split sample is retained and the other sent to

the SRC for analysis. The SRC is an ISO/IEC 17025/2005 and Standards Council of Canada

certified analytical laboratory. Blanks, standard reference materials, and repeats are inserted into

the sample stream at regular intervals by Skyharbour and the SRC in ac cordance with

5

Skyharbour’s quality assurance/quality control (QA/QC) procedures. Geochemical assay data

are subject to verification procedures by qualified persons employed by Skyharbour prior to

disclosure.

During active exploration programs drillholes are radiometrically logged using calibrated

downhole Mount Sopris HLP -2375 or 2GHF probes of varying sensitivities which collect

continuous readings along the length of the drillhole. Preliminary radiometric equivalent uranium

grades (“eU 3O8”) are then calculated from the downhole radiometric results. The probe is

calibrated using an algorithm calculated from the calibration of the probe at the Saskatchewan

Research Council facility in Saskatoon and from the comparison of probe results against

geochemical analyses. In the case where core recovery within a mineralized intersection is poor

or non-existent, radiometric grades are considered to be more representative of the mineralized

intersection and may be reported in the place of assay grades. Ra diometric equivalent probe

results are subject to verification procedures by qualified persons employed by Skyharbour prior

to disclosure.

Qualified Person:

The technical information in this news release has been prepared in accordance with the

Canadian regulatory requirements set out in National Instrument 43 -101 and reviewed and

approved by David Billard, P.Geo., a Consulting Geologist for Skyharbour as well as a Qualified

Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca

Basin and is well positioned to benefit from improving uranium market fundamentals with twenty-

nine projects, ten of which are drill-ready, covering over 587,000 hectares (over 1.4 million acres)

of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the

Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east of

Denison's Wheeler River project and 39 kilometres south of Cameco's McAr thur River uranium

mine. Moore is an advanced -stage uranium exploration property with high -grade uranium

mineralization at the Maverick Zone that returned drill results of up to 6.0% U3O8 over 5.9 metres

including 20.8% U 3O8 over 1.5 metres at a vert ical depth of 265 metres. Adjacent to the Moore

Uranium Project is Skyharbour’s recently optioned Russell Lake Uranium Project from Rio Tinto,

which hosts several high-grade uranium drill intercepts over a large property area with robust

exploration upside potential. The Company is actively advancing these projects through

exploration and drill programs.

Skyharbour has joint -ventures with industry -leader Orano Canada Inc., Azincourt Energy and

Thunderbird Resources (previously Valor) at the Preston, East Preston and Hook Lake Projects,

respectively. The Company also has several active earn-in option partners including: CSE-listed

Basin Uranium Corp. at the Mann Lake Uranium Project; CSE-listed Medaro Mining Corp. at the

Yurchison Project; North Shore Uranium at the Falcon Project; and TSX -V listed Tisdale Clean

Energy at the South Falcon East Project which is host to the Fraser Lakes Zone B Uranium and

Thorium Deposit. In aggregate , Skyharbour has now signed earn -in option agreements with

partners that total to over $33 million in partner-funded exploration expenditures, over $27 million

worth of shares being issued and over $ 20 million in cash payments coming into Skyharbour,

assuming that these partner companies complete their entire earn-ins at the respective projects.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed

long-term partnerships, and the advancement of exploration projects in geopolitically favourable

jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:

6

https://www.skyharbourltd.com/_resources/images/SKY_SaskProject_Locator_2024-02-

14_V2.jpg

To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website

at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble

President and CEO

For further information contact myself or:

Nicholas Coltura

Investor Relations Manager

Skyharbour Resources Ltd.

Telephone: 604-558-5847

Toll Free: 800-567-8181

Facsimile: 604-687-3119

Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER

ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF

THIS NEWS RELEASE.

The securities offered have not been, and will not be, registered under the United States

Securities Act of 1933, as amended (the "U.S. Securities Act") or any U.S. state securities laws,

and may not be offered or sold in the United States or to, or for th e account or benefit of, United

States persons absent registration or an applicable exemption from the registration requirements

of the U.S. Securities Act and applicable U.S. state securities laws. This press release does not

constitute an offer to sell o r the solicitation of an offer to buy securities in the United States, nor

in any other jurisdiction.

This release includes certain statements that may be deemed to be "forward-looking statements".

All statements in this release, other than statements of historical facts, that address events or

developments that management of the Company expects, are forwa rd-looking statements,

including the Private Placement. Although management believes the expectations expressed in

such forward-looking statements are based on reasonable assumptions, such statements are not

guarantees of future performance, and actual results or developments may differ materially from

those in the forward-looking statements. The Company undertakes no obligation to update these

forward-looking statements if management's beliefs, estimates or opinions, or other factors,

should change. Factors that could cause actual results to differ materially from those in forward-

looking statements, include market prices, exploration and development successes, regulatory

approvals, continued availability of capital and financing, and general economic, mar ket or

business conditions. Please see the public filings of the Company at www.sedar.com for further

information.