Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SYH.V ·

Skyharbour Enters into Agreements to Partner with Hatchet Uranium Corp. on Several of its Uranium Projects Located in the Athabasca Basin, Saskatchewan

Partnerships & JV

Suite 1030 – 505 Burrard Street, Vancouver, BC, Canada, V7X 1M5

www.skyharbourltd.com

TSX-V Trading Symbol: SYH

Email: [email protected]

Telephone: (604) 558-5847

Facsimile: (604) 687-3119

November 4th, 2024

News Release

Skyharbour Enters into Agreements to Partner with Hatchet Uranium Corp. on Several of its

Uranium Projects Located in the Athabasca Basin, Saskatchewan

Vancouver, BC - Skyharbour Resources Ltd . (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt:

SC1P) (“Skyharbour” or the “Company”), is pleased to announce that it has entered into agreements

with a private arm’s-length company, Hatchet Uranium Corp. (the “Hatchet”), whereby Hatchet may

acquire an 80% interest in the Company’s 9,339 ha Highway Uranium Property (the “ Optioned

Property”) and a 100% interest, subject to a claw-back provision for Skyharbour, in the Company’s

Genie, Usam and CBX/Shoe Urani um Projects (the “Purchased Property”) totalling 66,358 ha, all

located in the Athabasca Basin, Northern Saskatchewan, Canada.

Highway, Genie, Usam, CBX and Shoe Project Map:

https://www.skyharbourltd.com/_resources/images/Hatchet-Property-Option.jpg

Jordan Trimble, President and CEO of Skyharbour, commented “ We are excited to enter into this

partnership with Hatchet Uranium Corp. as they advance and fund these exploration properties going

forward. We are confident in the capable team behind Hatchet as they have plenty of experience in

the Athabasca Basin and we look forward to them unlocking value at these projects. We continue to

execute on our strategy by adding value to our uranium project base in the Athabasca Basin through

strategic partnerships and prospect generation, as well as focused exploration at our co -flagship

Russell and Moore Projects.”

Terms of the Optioned Property:

The Optioned Property, Highway, consists of four (4) mineral claims comprising approximately 9,339

hectares. Hatchet may acquire an 80% interest in the Optioned Property by (i) issuing common

shares in the capital of Hatchet (“Shares”) having an aggregate value of CAD $1,050,000; (ii) making

aggregate cash payments of CAD $245,000; and (iii) incurring an aggregate of CAD $2,050,000 in

exploration expenditures on the Optioned Property over a three-year period, as follows:

Date Cash Payments Exploration Expenditures Value of Shares Issued

On or before the first

anniversary of Closing $25,000 $250,000 $25,000(1)

On or before the second

anniversary of Closing $20,000 $300,000 $25,000(1)

On or before the third

anniversary of Closing $200,000 $1,500,000 $1,000,000(1)

TOTAL $245,000 $2,050,000 $1,050,000

(1) Deemed pricing of Shares is based on the twenty (20) day volume weighted average price on the stock exchange in

which Hatchet shall list its Shares for trading, being either the TSX Venture Exchange or the Canadian Securities Exchange

(“Deemed Price”) or the last sale price, if not listed on a stock exchange at the time of issuance

In the event that the issuance of any Shares pursuant to the above would result in the Company

holding 10% or more of the outstanding Shares of Hatchet, Hatchet will issue that number of Shares

which would result in the Company receiving 9.9% of the issued and outstanding Shares post -

issuance and will pay cash in lieu of the Shares for the difference.

The obligations of Hatchet under the option agreement are subject to the following conditions (i)

Hatchet completing a financing for minimum gross proceeds of $1,500,000, (ii) the sale of the of the

Genie, Usam and CBX/Shoe Uranium Projects to Hatchet, and (iii) Hatchet having listed the Hatchet

Shares on the TSX Venture Exchange or the Canadian Securities Exchange or having sold its

interest to or combined with a similarly listed issuer.

The Company shall retain a 2% net smelter returns royalty from minerals mined and removed from

the Optioned Property, of which Hatchet may purchase one -half, being 1%, at any time for

$1,000,000.

Terms of the Purchased Property:

The Purchased Property consists of twenty-five (25) mineral claims comprising approximately 66,358

hectares across the Genie, Usam and CBX/Show projects. Hatchet may acquire a 100% interest in

the Purchased Property by, on the date of closing (the “Closing Date”), paying the Company $25,000

and issuing to the Company such number of units in the capital of Hatchet (“Hatchet Units”) equal to

9.9% of the issued and outstanding Shares immediately following issuance. Each Hatchet Unit shall

be comprised of one Share and one share purchase warrant, entitling Skyharbour to purchase one

additional Share for a period of three years at a price that is a 25% premium to the deemed value of

the Shares in both years 1 and 2, and then increases to a 50% premium to the issuance value of the

Shares in year 3.

The Company shall retain a claw-back provision whereby, within 90 days after the 3rd anniversary of

the Closing Date, the Company may elect by written notice to Hatchet of its intention to purchase

back a twenty-five percent (25%) interest in the Purchased Property by, within 90 days of delivery of

such notice, incurring exploration expenditures or paying cash in lieu of to fund future exploration,

equivalent to fifty percent (50%) of the total amount that Hatchet had spent during the term that is

three years from the Closing Date in exploration expenditures on the Purchased Property. If Hatchet

has not incurred any exploration expenditures during the three years following the closing date, then

Skyharbour shall automatically receive the 25% interest in the Property.

The obligation of Hatchet to acquire the Purchased Property is subject to the following conditions (i)

Hatchet completing a financing for minimum gross proceeds of $1,500,000, (ii) the closing of the

Option of the Highway Uranium Property from Skyharbour to Hatchet, and (iii) Hatchet having listed

the Hatchet Shares on the TSX Venture Exchange or the Canadian Securities Exchange or having

sold its interest to or combined with a similarly listed issuer. If the conditions listed in items (i) and

(iii) above are not completed within 18 months, Hatchet’s right to acquire the Purchased Property

will terminate. If, after 12 months, the conditions listed in items (i) and (iii) above are not satisfied,

Hatchet shall pay Skyharbour a monthly fee of $10,000 until such conditions are satisfied or an

aggregate of $60,000 has been paid, whichever occurs first.

The Company shall also retain a 2% net smelter returns royalty from minerals mined and removed

from the Purchased Property, of which Hatchet may purchase one-half, being 1%, at any time for

$2,000,000.

Highway Property Summary:

The Highway Uranium Project consists of four claims covering 9,339 hectares, approximately 41 km

south of the Rabbit Lake Mine and 11 km southwest of Uranium Energy Corp.’s (UEC, formerly UEX)

West Bear U and Co-Ni Deposits. Highway 905 runs through the property, providing excellent access

for exploration and the project is in close proximity to regional infrastructure. There has been limited

modern exploration carried out on the project but there is the potential for high -grade basement-

hosted and unconformity-related uranium mineralization.

Highway Property Map:

https://www.skyharbourltd.com/_resources/images/Location-Map-Highway-Property.jpg

The project is underlain by Wollaston Supergroup metasedimentary gneisses (pelitic to

psammopelitic and psammitic to meta-arkosic) folded around and overlying an Archean felsic gneiss

dome which outcrops in the southwestern portion of the property and cores a northeast trending

antiformal fold nose. The Highway Project is located approximately 7 km east of the present -day

margin of the Athabasca Basin but is believed to have been covered by Athabasca sandstone in the

past.

Genie Property Summary:

The Genie property consists of five claims totalling 16,930 ha, and is located approximately 48 km

northeast of Cameco’s Eagle Point Uranium Mine (Rabbit Lake Operation) and 40 km north of

Wollaston Lake Post. The project is underlain by Wollaston Superground metasedimentary gneisses

and Archean granitoids, with highly prospective pelitic to psammopelitic gneisses (including graphitic

varieties) and several north-trending faults related to the Tabbernor fault system being mapped on

the property. The project lies outside the current extent of the Athabasca Basin, but is believed to

have been overlain by now-eroded Athabasca sandstones in the past and has the potential for high-

grade basement-hosted and unconformity-related uranium mineralization. The property is underlain

by a series of linear magnetic highs (interpreted as granitoids) and magnetic lows (interpreted a s

metasedimentary gneisses), cross-cut by a highly magnetic northwest-trending Mackenzie Diabase

dyke.

Genie Property Map:

https://www.skyharbourltd.com/_resources/images/Location-Map-Genie-Property.jpg

Previous work on the Genie project includes limited diamond drilling ( three historical drill holes, of

which one was abandoned in overburden) and a variety of airborne and ground geophysical surveys,

prospecting, geological mapping, lake sediment and overburden sampling, and soil sampling. Most

of this exploration work took place between 1966 to 1980, prior to the advent of modern geophysical

methods and geological models, but in 2014 part of the Genie property was covered by a helicopter-

borne DIGHEM magnetic, electromagnetic, and radiometric survey . The survey showed a strong

central EM conductor following a magnetically inferred contact on the two northeastern most claims,

which is locally disrupted by several moderately conductive N-S trending structural breaks, inferred

to be faults. This strong conductor is highly prospective for uranium mineralization, and drilling done

in 1969 and 1971 has confirmed the presence of graphitic and sulfide-containing pelitic gneisses on

the property. Lake sediment samples also collected at Genie during the 2014 exploration program,

contained up to 63.3 ppm U, further showcasing the prospectivity of the property.

Usam Property Summary:

The Usam Project consists of twelve claims totalling 40,041 ha and is located approximately 16 km

northeast of Cameco’s Eagle Point Mine (Rabbit Lake Operation). The project has numerous EM

conductors that are associated with significant magnetic lows of the Wollaston Domain. While the

project is outside the current confines of the Athabasca Basin, the area was overlain by Athabasca

sandstones historically. Basement rocks on the property include Wollaston Supergroup

metasediments and Archean granitoid gneis ses, with highly prospective pelitic to psammopelitic

gneisses (including graphitic varieties) making up the largest proportion of the basement rocks.

Several north-trending faults related to the Tabbernor fault system cross-cut the property.

Usam Property Map:

https://www.skyharbourltd.com/_resources/images/Location-Map-Usam-Property.jpg

Previous work on the project includes diamond drilling (12 holes), lake sediment sampling, soil

sampling, geological mapping, ground and airborne geophysics, marine seismic, prospecting, and

other geochemical sampling, the majority of which was done in the 1980’s and 1970’s. Modern

exploration of the property has been limited to geophysics and ground prospecting. As such there is

a significant untested potential on the project. Trenching on Cleveland Island uncovered up to 0.31%

U3O8 in mineralized pegmatite, and diamond drilling on Gilles Island intersected anomalous uranium,

indicating that the basement rocks underling the Usam property are fertile sources of uranium in

addition to containing pegmatite - and granite -hosted U -Th-REE mineralization. There are also

several sedimentary -hosted base metals (i.e. Cu and Zn) showings on the project and in the

surrounding area, which show similarities to the sedimentary -hosted Cu mineralization previously

discovered by Rio Tinto and its partners at the Janice Lake Project further southwest in the Wollaston

Domain.

CBX/Shoe Property Summary:

The CBX property has been recently expanded through staking to include five additional claims

adjoining the previously staked CBX and Shoe properties, which have been combined to include a

total of seven claims covering 8,777 hectares. The 609 ha Shoe property has remained unchanged,

with both CBX and Shoe now consisting of eight non-contiguous claims totalling 9,386 hectares.

CBX/Shoe Property Map:

https://www.skyharbourltd.com/_resources/images/Location-Map-CBX-Shoe-Properties.jpg

The new claims lie approximately 6.5 km to 25 km northeast of the Eagle Point uranium mine and

cover the northern shore of Wollaston Lake including parts of Cunning Bay. Outcrop exposure on

the property is poor, but historical mapping and drilling shows that the newly expanded CBX project

is underlain by a mixture of Wollaston Supergroup metasedimentary gneisses, Hudsonian intrusives,

and Archean felsic gneisses of the Western Wollaston Domain. Similar lithologies host uranium

mineralization at the Rabbit Lake oper ation, including the Eagle Point deposit, and other uranium

deposits in the Athabasca Basin and surrounding regions. The CBX and Shoe properties have had

historical exploration, including airborne and ground geophysical surveys, lake sediment, soil, and

spruce geochemical surveys, till sampling, prospecting, geological mapping, and a marine seismic

survey, but the majority of this work took place in the 1960’s to 1980’s, with limited modern

exploration work being carried out on a small portion of the CBX and Shoe properties.

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101 and reviewed and approved by David

Billard, P.Geo., a Consulting Geologist for Skyharbour as well as a Qualified Person. Mr. Billard has

verified the data disclosed, which includes a review of the sampling, analytical and test data

underlying the information and opinions contained herein.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca

Basin and is well positioned to benefit from improving uranium market fundamentals with interest in

twenty-nine projects, ten of which are drill -ready, covering over 580,000 hectares (over 1. 4 million

acres) of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the

Company, a 100% interest in the Moore Uranium Project , which is located 15 kilometres east of

Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium mine.

Moore is an advanced-stage uranium exploration property with high-grade uranium mineralization at

the Maverick Zone that returned drill results of up to 6.0% U 3O8 over 5.9 metres, including 20.8%

U3O8 over 1.5 metres at a vertical depth of 265 metres (see news release dated February 27th, 2017,

titled: “Skyharbour Intersects 20.8% U3O8 over 1.5 Metres in First Drill Hole at Maverick Zone and

Discovers New High-Grade Uranium Lens on Moore Lake Uranium Project”). Adjacent to the Moore

Project is the Russell Lake Uranium Project , in which Skyharbour is an operator with joint -venture

partner RTEC. The project hosts several high -grade uranium drill intercepts over a large property

area with robust exploration upside potential. The Company is actively advancing these projects

through exploration and drill programs.

Skyharbour also has joint ventures with industry leader Orano Canada Inc., Azincourt Energy, and

Thunderbird Resources (previously Valor) at the Preston, East Preston, and Hook Lake Projects

respectively. The Company also has several active earn -in option partners , including CSE-listed

Basin Uranium Corp. at the Mann Lake Uranium Project; CSE -listed Medaro Mining Corp. at the

Yurchison Project; TSX-V listed North Shore Uranium at the Falcon Project; UraEx Resources at the

South Dufferin and Bolt Projects; Hatchet Uranium at the Highway Project and TSX-V listed Terra

Clean Energy (previously Tisdale) at the South Falcon East Project which hosts the Fraser Lakes

Zone B uranium and thorium deposit. In aggregate, Skyharbour has now signed earn -in option

agreements with partners that total over $40 million in partner-funded exploration expenditures, over

$30 million worth of shares being issued , and over $2 2 million in cash payments coming into

Skyharbour, assuming that these partner companies complete their entire earn-ins at the respective

projects.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed

long-term partnerships, and the advancement of exploration projects in geopolitically favourable

jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:

https://www.skyharbourltd.com/_resources/images/SKY_SaskProject_Locator_2024-02-14_V2.jpg

To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website

at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble

President and CEO

For further information contact myself or:

Nicholas Coltura

Investor Relations Manager

Skyharbour Resources Ltd.

Telephone: 604-558-5847

Toll Free: 800-567-8181

Facsimile: 604-687-3119

Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER

ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF

THIS NEWS RELEASE.

Forward-Looking Information

This news release contains “forward ‐looking information or statements” within the meaning of

applicable securities laws, which may include, without limitation, completing ongoing and planned

work on its projects including drilling and the expected timing of such work programs, other

statements relating to the technical, financial and business prospects of the Company, its projects

and other matters. All statements in this news release, other than statements of historical facts, that

address events or developments that the Company expects to occur, ar e forward -looking

statements. Although the Company believes the expectations expressed in such forward -looking

statements are based on reasonable assumptions, such statements are not guarantees of future

performance and actual results may differ materially from those in the forward -looking statements.

Such statements and information are based on numerous assumptions regarding present and future

business strategies and the environment in which the Company will operate in the future, including

the price of uranium, the ability to achieve its goals, that general business and economic conditions

will not change in a material adverse manner, that financing will be available if and when needed

and on reasonable terms. Such forward -looking information reflects the Company’s views with

respect to future events and is subject to risks, uncertainties and assumptions, including the risks

and uncertainties relating to the interpretation of exploration results, risks related to the inherent

uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses,

and those filed under the Company’s profile on SEDAR+ at www.sedarplus.ca. Factors that could

cause actual results to differ materially from those in forward looking statements include, but are not

limited to, continued availability of capital and financing and general economic, market or business

conditions, adverse weather or c limate conditions, failure to obtain or maintain all necessary

government permits, approvals and authorizations, failure to obtain or maintain community

acceptance (including First Nations), decrease in the price of uranium and other metals, increase in

costs, litigation, and failure of counterparties to perform their contractual obligations. The Company

does not undertake to update forward‐looking statements or forward‐looking information, except as

required by law.