Skyharbour Completes UAV-MAGTM Airborne Geophysics Surveying and Plans Upcoming Drill Program on its High Grade Moore Uranium Project
Suite 1610 – 777 Dunsmuir Street, Vancouver, BC, Canada, V7Y 1K4
www.skyharbourltd.com
TSX-V Trading Symbol: SYH
Email: [email protected]
Telephone: (604) 687-3376
Facsimile: (604) 687-3119
September 25th, 2019
NEWS RELEASE
Skyharbour Completes UAV-MAGTM Airborne Geophysics Surveying and Plans
Upcoming Drill Program on its High Grade Moore Uranium Project
Vancouver, BC - Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt:
SC1P) (the “Company”) is pleased to announce the completation of an Unmanned Aerial Vehicle
Magnetometer Survey (“UAV-MAGTM Survey”) by Pioneer Aerial Surveys Ltd. (“Pioneer”) on the
Company’s 35,705 hectare Moore Uranium Project, located approx. 15 km east of Denison Mine’s
Wheeler River project on the southeast side of the Athabasca Basin, Saskatchewan. The survey
was flown over the Maverick structural corridor and has aided in refining drill targets related to
basement rocks. The Company also announces plans for an upcoming diamond drill program at
the Moore Project. The Maverick structural corridor is host to several high grade uranium zones
including the Main Maverick Zone where previous drilling has returned 6.0% U3O8 over 5.9 metres
including 20.8% U3O8 over 1.5 metres in hole ML-199.
Moore Uranium Project Claims Map:
http://skyharbourltd.com/_resources/maps/MooreLakeRegionalTenure.jpg
Jordan Trimble, President and CEO of Skyharbour Resources, stated: “We are keen to continue
exploring and drilling our flagship Moore Uranium Project as we have recently discovered new
high grade uranium mineralization in the underlying basement rock along the Maverick corridor,
and have made new regional discoveries requiring follow up work. I have personally been buying
more shares of the Company in the market recently. We are well positioned to benefit from an
improving uranium market with strong di scovery potential and ample upcoming news flow from
our drilling at Moore, as well as recently announced and upcoming exploration programs from our
partner companies’ Orano Canada Inc. and Azincourt Energy.”
The UAV-MAGTM survey has successfully identified high-priority, cross-cutting features and
structures along the Maverick corridor. Identification of these features has helped refine and
identify current and additional drill targets for the upcoming fall/winter diamond drilling program at
Moore. Only 2 km of the total 4 km long Maverick structural corridor have been systematically drill
tested leaving robust discovery potential along strike as well as at depth in the underlying
basement rocks which have seen limited drill testin g. With this survey, Skyharbour continues to
unlock the discovery potential at Moore through value -add, systematic and cutting-edge
exploration techniques.
Moore Uranium Project Maverick Corridor:
2
http://skyharbourltd.com/_resources/maps/Moore-Lake-Maverick-Corridor-Map-v1.jpg
Pioneer has extensive experience flying Unmanned Aerial Vehicle (“UAV”) based magnetometer
and remote sensing surveys for the mining and exploration sector and has successfully flown over
12,000 line kms in surveys across North America. Pioneer is leading the industry in UAV remote
sensing for mineral exploration, mine site surveys and safety inspections. Their UAV systems are
some of the most advanced in the world, custom built in Canada and capable of long flights and
diverse sensor payloads.
Upcoming Drill Program Plans:
Skyharbour is planning a 2,500 metre diamond drilling program slated to commence later in the
year / early next year. This drill program will test both unconformity and basement targets along
the high grade Maverick structural corridor, as well as prospective regional targets identified by
Skyharbour’s technical team. Of particular interest are potential underlying basement feeder
zones to the unconformity-hosted high grade uranium present along the Maverick corridor. These
targets have seen limited historical drill testing. Additional drilli ng will also be undertaken,
dependent on local field conditions, on the landward portions of the recently discovered Otter
Zone targets along strike of hole ML19-04.
Maverick East Target:
Drilling is planned to test new targets related to the northeastern extension of the Maverick East
Zone and within the Maverick East Zone itself. The focus will be on down dip and strike extensions
of the Maverick East target. Past drilling has confirmed the pres ence of uranium mineralization
over broad intervals in excess of 80 metres strike length in both the sandstone and basement
rocks. It appears that the mineralization is plunging in a northeasterly direction and tends to be
basement dominated to the northeast. Highlights of the Maverick East zone include: hole ML-202
which returned 1.79% U3O8 over 11.5 metres, including 4.17% U3O8 over 4.5 metres and 9.12%
U3O8 over 1.4 metres as well as hole ML19-06 which returned 0.62% U 3O8 over 12.0 metres,
including 2.31% U3O8 over 2.5 metres.
Refinement of the company’s geological and structural model regarding the northward plunging
mineralized zones of the Maverick East is nearing completion. This work will greatly assist in the
discovery of additional high grade mineralization in the basement rocks of the Maverick East
Zone, along strike and down dip of the current mineralization. This new model will be utilized for
the upcoming drilling programs on the Moore project.
Maverick Structural Corridor - Northeast Extension:
Additional drilling is also planned to the northeast of the Maverick and Maverick East mineralized
zones and within the remaining 2 km of the Maverick Structural Corridor, including the Viper target
area. A large proportion of this trend has been tested by a series of broadly spaced drill fences
with significant untested gaps between fences or within the individual fences. Virtually all of these
holes exhibited extensive sandstone and basement alterat ion and geochemical enrichment
similar to that found within the Maverick and Maverick East Zones. Narrow intercepts of uranium
mineralization were identified in numerous locations along this portion of the corridor. Many of
these mineralized intercepts were identified at the unconformity, but in a few key areas significant
strongly altered basement structures within prospective graphitic and metasedimentary units were
the host for this mineralization.
Several new targets within these relatively untested a reas of the corridor have been highlighted
by the recently completed UAV Magnetic survey which successfully identified notable, cross -
cutting features and structures along the Maverick corridor. This survey, in concert with the
historic drill results and knowledge gleaned from the aforementioned Maverick East
geological/structural model will greatly benefit Skyharbour’s exploration efforts along this portion
3
of the Maverick Structural Corridor. The upcoming drilling program will be planned to
take full advantage of this newly integrated data.
Otter Zone Target:
A drilling program to follow up on last winter’s successful inaugural program is planned for the
Otter Zone. No drilling has occurred in the Otter Zone since the 1980’s when three preliminary
holes identified significant structural disruption and geochemical enrichment. In the winter of 2019,
hole ML19-04 intersected prospective intrusive and graphitic lithologies in the basement rocks
accompanied by uranium values up to 0.15% U3O8 over 0.5 metres and anomalous B, Th, Ni, Cu
and Mo. Two other holes (ML19-02, -03) intersected similar lithologic packages with ML19 -02
intersecting highly clay altered and tourmalinized pegmatites containing up to 1.26% boron,
indicative of a high level of prospectivity for the discovery of high grade uranium mineralization.
Analysis of the regional geophysical and geological data from the Otter Zone area indicate that it
is part of a c omplex series of graphitic metasedimentary packages folded around and within
Hudsonian granitic assemblages.
Detailed analysis of all of the existing, geophysical, geological and drilling data sets in conjunction
with a newly developed surficial lineamen t analysis is ongoing for this area. This work will be
completed in the near term and will be used to develop new drill targets for upcoming drilling
programs, including targets on the landward portion of the Otter Zone which may be accessed in
all seasons.
Moore Uranium Project Overview:
In June 2016, Skyharbour secured an option to acquire Denison Mine's Moore Uranium Project,
on the southeastern side of the Athabasca Basin, in northern Saskatchewan. The project , now
100% owned by the Company, consists of 12 contiguous claims totaling 35,705 hectares located
42 kilometres northeast of the Key Lake mill, approx. 15 kilometres east of Denison’s Wheeler
River project, and 39 kilometres south of Cameco’s McArthur River uranium mine. Unconformity
style uranium mineralization was discovered on the Moore Project at the Maverick Zone in April
2001. Historical drill highlights include 4.03% eU3O8 over 10 metres including 20% eU3O8over 1.4
metres, and in 2017, Skyharbour announced drill results including 6.0% U3O8 over 5.9 metres
including 20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres. In addition to the Maverick
Zone, the project hosts other mineralized targets with strong discovery potential which the
Company plans to test with future drill programs. The project is accessible via winter and ice roads
which simplifies logistics and lowers costs.
Moore Lake Uranium Project Geophysics Map:
http://skyharbourltd.com/_resources/maps/MooreLake-Basic-geo-revamp.jpg
Qualified Person:
The technical information in this news release has been prepared in accordance with the
Canadian regulatory requirements set out in National Instrument 43 -101 and r eviewed and
approved by Richard Kusmirski, P.Geo., M.Sc., Skyharbour’s Head Technical Advisor and a
Director, as well as a Qualified Person.
About Skyharbour Resources Ltd.:
Skyharbour holds an extensive portfolio of uranium and thorium exploration projects in Canada's
Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals
with six drill -ready projects . Skyharbour has acquired from Denison Mines, a large strategic
shareholder of the Company, a 100% interest in th e Moore Uranium Project which is located 15
kilometres east of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur
River uranium mine. Moore is an advanced stage uranium exploration property with high grade
uranium mineralization at the Maverick Zone with drill results returning up to 6.0% U3O8 over 5.9
4
metres including 20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres. Skyharbour has
signed option agreements with Orano Canada Inc. and Azincourt Energy whereby Orano and
Azincourt can earn in up to 70% of the Preston Project through a combined $9,800,000 in total
exploration expenditures, as well as $1,700,000 in total cash payments and Azincourt shares.
Preston is a large, geologically prospective property proximal to Fiss ion Uranium's Triple R
deposit as well as NexGen Energy's Arrow deposit. The Company also owns a 100% interest in
the Falcon Point Uranium Project on the eastern perimeter of the Basin which contains a NI 43 -
101 inferred resource totaling 7.0 million pounds of U3O8 at 0.03% and 5.3 million pounds of ThO2
at 0.023%. The Company's 100% owned Mann Lake Uranium project on the east side of the
Basin is strategically located adjacent to the Mann Lake Joint Venture operated by Cameco,
where high -grade uranium mine ralization was recently discovered. Skyharbour's goal is to
maximize shareholder value through new mineral discoveries, committed long-term partnerships,
and the advancement of exploration projects in geopolitically favourable jurisdictions.
Skyharbour’s Uranium Project Map in the Athabasca Basin:
http://skyharbourltd.com/_resources/SYH_Landpackage_2014.jpg
To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website
at www.skyharbourltd.com.
SKYHARBOUR RESOURCES LTD.
“Jordan Trimble”
Jordan Trimble
President and CEO
For further information contact myself or:
Simon Dyakowski
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-639-3850
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: [email protected]
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER
ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS
NEWS RELEASE.
This release includes certain statements that may be deemed to be "forward -looking statements". All
statements in this release, other than statements of historical facts, that address events or developments
that management of the Company expects, are forwa rd-looking statements. Although management
believes the expectations expressed in such forward -looking statements are based on reasonable
assumptions, such statements are not guarantees of future performance, and actual results or
developments may differ materially from those in the forward-looking statements. The Company undertakes
no obligation to update these forward -looking statements if management's beliefs, estimates or opinions,
or other factors, should change. Factors that could cause actual results to differ materially from those in
forward-looking statements, include market prices, exploration and development successes, continued
availability of capital and financing, and general economic, market or business conditions. Please see the
public filings of the Company at www.sedar.com for further information.