Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SYH.V ·

Skyharbour Announces Plans for Upcoming Summer 2017 Drill Program and Commences Comprehensive Data Compilation on the Moore Uranium Project

Exploration Programs

Suite 1610 – 777 Dunsmuir Street, Vancouver, BC, Canada, V7Y 1K4

www.skyharbourltd.com

TSX-V Trading Symbol: SYH

Email: [email protected]

Telephone: (604) 687-3376

Facsimile: (604) 687-3119

July 13th, 2017

News Release

Skyharbour Announces Plans for Upcoming Summer 2017 Drill Program and

Commences Comprehensive Data Compilation on the Moore Uranium Project

Vancouver, BC - Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt:

SC1P) (the “Company”) is pleased to announce plans for its upcoming summer 2017 drill program

at its flagship 35,705 hectare Moore Uranium Project, located approx. 15 kilometres east of

Denison Mine's Wheeler River project and near regional infrastructure on the southeast side of

the Athabasca Basin, Saskatchewan . The Company is planning a 2,500 metre diamond drill

program commencing in August to follow up on the success of the recently completed winter 2017

drill program with planned drill targets located on the Maverick Corridor as well as other regional

targets planned for drill testing. The Company is also carrying out a comprehensive data

compilation program at Moore to aggre gate all of the historical and ongoing exploration results

and plans to use new and innovative techniques to analyze this data to enhance the discovery

potential and resource delineation at the project going forward.

Moore Uranium Project Claims Map:

http://skyharbourltd.com/_resources/maps/MooreLakeRegionalTenure.jpg

Upcoming Summer 2017 Dill Program at Moore Uranium Project:

Given the success of Skyharbour’s first phase of drilling at the Moore Project in the winter of 2017,

the Company has planned for a 2,500 metre summer drill program to commence in August. Drill

targets will include several regional targets at the property as well as the Maverick corridor where

previous drilling has intersected high grade uranium mineralization at the Main Maverick Zone

including 6.0% U3O8 over 5.9 metres at 265 metres depth in hole ML-199, as well as the discovery

of new, high grade mineralized lenses along str ike from this Main Maverick Zone. The Maverick

corridor is over 4 kilometres long yet only 1.5 kilometres have been systematically drilled with

most of this drilling and known high grade uranium hosted at or near the unconformity leaving

strong discovery potential along strike but also at depth in the basement rocks.

The Company has received the necessary permits and is fully funded for this upcoming drill

program with over $3.7 million in the treasury. Additional news is forthcoming on the drill program.

Moore Uranium Project Data Compilation and Analysis:

2

Skyharbour is carrying out an extensive data compilation program on its Moore Uranium

Project to aggregate all of the historical and ongoing exploration results and geological

information. Over $35 million in historical exploration has been carried out over several decades

including airborne and ground electromagnetic and magnetic surveys, gr ound gravity, seismic,

IP/resistivity and geochemical surveys, mapping, prospecting, lake sediment sampling programs

and the drilling of more than 380 diamond drill holes. The Company is compiling all of this data

into a comprehensive , modern, user-friendly proprietary database that will help streamline

geological analysis and target evaluation for future exploration programs. Reinterpretation of

historical data led to the new discovery of a high grade uranium lens at the Maverick East Zone

in the 2017 winter drill program which included 4.17% U3O8 over 4.5m in hole ML-202. Skyharbour

will utilize new techniques and innovative analysis with the database to enhance the discovery

potential at Moore going forward.

Moore Uranium Project Regional Drill Targets Map:

http://skyharbourltd.com/_resources/maps/Moore-Lake-Property-Wide.jpg

Winter 2017 Dill Program Results at Moore Uranium Project:

Skyharbour recently reported results from its 5,450 metre, 15 drill hole, winter 2017 diamond

drilling program at its Moore Uranium Project (see May 23 rd, 2017 news release). Multiple drill

holes intersected high grade uranium mineralization at the 4 kilometre long Maverick structural

corridor. Previously reported high grade results included 20.8% U3O8 over 1.5 metres within an

interval returning 6.0% U3O8 over 5.9 metres in hole ML-199; 9.12% U3O8 over 1.4 metres within

an interval returning 4.17% U3O8 over 4.5 metres in hole ML-202; 5.29% U3O8 over 2.5 metres

within an interval returning 2.99% U3O8 over 5.0 metres in hole ML-200; and 2.25% U3O8 over

3.0 metres in hole ML-208. This high grade mineralization within the Maverick corridor is relatively

shallow ranging from 250 metres to 275 metres vertical depth. Also of note is that hole ML -202

represents the discovery of a new high grade mineralized lens on the corridor. Only 1.5 kilometres

of the total 4 kilometre long Maverick corridor have been systematically drill tested leaving robust

discovery potential along strike as well as at depth in the underlying basement rocks which have

seen limited drill testing historically.

Moore Uranium Project Winter 2017 Drill Program Map:

http://skyharbourltd.com/_resources/projects/Moore-Lake-Drilling-Update_20170515.pdf

Qualified Person:

The technical information in this news release has been prepared in accordance with the

Canadian regulatory requirements set out in National Instrument 43 -101 and reviewed and

approved by Richard Kusmirski, P.Geo., M.Sc., Skyharbour’s Head Technical Adviso r and a

Director, as well as a Qualified Person.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium and thorium exploration projects in Canada's

Athabasca Basin and is well positioned to benefit from improving uranium ma rket fundamentals

with five drill-ready projects. In July 2016, Skyharbour acquired an option from Denison Mines, a

large strategic shareholder of the Company, to acquire 100% of the Moore Uranium Project which

is located approx. 15 kilometres east of Denison's Wheeler River project and 39 kilometres south

of Cameco's McArthur River uranium mine. Moore is an advanced stage uranium exploration

property with high grade uranium mineralization at the Maverick Zone with drill results returning

6.0% U3O8 over 5.9 metres including 20.8% U3O8 over 1.5 metres at a vertical depth of 265

metres. Skyharbour recently signed option agreements with AREVA Resources Canada and

Azincourt Uranium whereby AREVA and Azincourt can earn in 70% on the Preston Project

through a combined $9,800,000 in total exploration expenditures, as well as $1,700,000 in total

cash payments and 4,500,000 Azincourt shares. Preston is a large, geologically prospective

property proximal to Fission Uranium's Triple R deposit as well as NexGen Energy's Arrow

3

deposit. The Company also owns a 100% interest in the Falcon Point Uranium Project on

the eastern perimeter of the Basin which contains an NI 43 -101 inferred resource totaling 7.0

million pounds of U3O8 at 0.03% and 5.3 million pounds of ThO2 at 0.02 3%. The project also

hosts a high grade surface showing with up to 68% U3O8 in grab samples from a massive

pitchblende vein, the source of which has yet to be discovered. The Company's 100% owned

Mann Lake Uranium project on the east side of the Basin is s trategically located adjacent to the

Mann Lake Joint Venture operated by Cameco, where high grade uranium mineralization was

recently discovered. Skyharbour's goal is to maximize shareholder value through new mineral

discoveries, committed long-term partnerships, and the advancement of exploration projects in

geopolitically favourable jurisdictions.

Skyharbour’s Uranium Project Map in the Athabasca Basin:

http://skyharbourltd.com/_resources/SYH_Landpackage_2014.jpg

To find out more about Skyharbour Resources Ltd. (TSX -V: SYH) visit the Company’s website

at www.skyharbourltd.com.

SKYHARBOUR RESOURCES LTD.

“Jordan Trimble”

Jordan Trimble

President and CEO

For further information contact myself or:

Nick Findler

Corporate Development and Communications

Skyharbour Resources Ltd.

Telephone: 604-639-3850

Toll Free: 800-567-8181

Facsimile: 604-687-3119

Email: [email protected]

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER

ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS

NEWS RELEASE.

This release includes certain statements that may be deemed to be "forward -looking statements". All

statements in this release, other than statements of historical facts, that address events or dev elopments

that management of the Company expects, are forward -looking statements. Although management

believes the expectations expressed in such forward -looking statements are based on reasonable

assumptions, such statements are not guarantees of future p erformance, and actual results or

developments may differ materially from those in the forward-looking statements. The Company undertakes

no obligation to update these forward -looking statements if management's beliefs, estimates or opinions,

or other fact ors, should change. Factors that could cause actual results to differ materially from those in

forward-looking statements, include market prices, exploration and development successes, continued

availability of capital and financing, and general economic, market or business conditions. Please see the

public filings of the Company at www.sedar.com for further information.