Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SXL.V ·

SLAM DRILLS MASSIVE SULPHIDE ZONE Logan Zone Extensions At Depth Of 200 Meters In GW24-14

Drill Results

N AQ

TSXV: SXL

SLAM DRILLS MASSIVE SULPHIDE ZONE

Logan Zone Extensions At Depth Of 200 Meters In GW24-14

For Immediate Release November 20th, 2024

Miramichi, New Brunswick ‐ SLAM Exploration Ltd. (“SLAM” or the “Company”)

(TSXV-SXL) is pleased to announce it has drilled massive sulphides at the bottom of a 62 meter

zone of net textured sulphides in hole GW -14. The Company also reports a 30 meter mineral

zone in hole GW24- 13. Both holes were drilled on the Logan zone These are the latest results

from Slam’s wholly owned Goodwin P roject located 35 kilometers south of the Caribou mine

and mill complex in the Bathurst Mining Camp (“BMC”) of New Brunswick.

GW24-13 intersected a 30 meter zone of disseminated to net -textured sulphide mineralization .

Hole GW24-13 was 35 meter step ahead of hole GW24 -09. Hole GW24-14 intersected a 9.30

meter zone of 40% to 85% sulphides at the bottom of a 62.00 meter mineral zone of net textured

pyrrhotite. GW24-14 was set up 60 meter s behind hole GW24-09 and designed to test the depth

extent of the mineral zone previously reported in GW24- 09. Assays are pending on 166 samples

from holes GW24-13 and GW24014. The summary logs are tabled below:

Hole

Number

From-To

Meters

Interval

Meters

Description Mineralization

GW24-13 0.00–9.00 9.00 Casing

GW24-13 9.00-75.00 66.00 Gabbro 1-3% Sulphides

GW24-13 75.00-92.00 17.00 Mineral Zone-Gabbro 5-10% Sulphides

GW24-13 92.00-105.00 13.00 Mineral Zone-Gabbro 20-30% Sulphides

GW24-13 105-121.50 16.50 Gabbro 1-3% Sulphides

GW24-13 121.50-140.00 18.50 Gabbro 0.5% Sulphides

GW24-13 140.00 End Of Hole

GW24-14 0.00–2.60 2.60 Casing

GW24-14 2.60-144.40 141.80 Mafic Volcanic (MV) 1-3% Sulphides

GW24-14 144.40-157.50 13.10 Mineral Zone-Gabbro 12-15% Sulphides

GW24-14 157.50-170.39 12.89 Mineral Zone-Gabbro 30-40% Sulphides

GW24-14 170.39-198.70 28.31 Mineral Zone-MV 5-10% Sulphides

GW24-14 198.70-203.25 4.55 Mineral Zone-MV 40% Sulphides

GW24-14 203.25-208.00 4.75 Mineral Zone 75-85% Sulphides

GW24-14 208.00-246.00 38.00 Mafic Volcanic 0.5% Sulphides

GW24-14 246.00-262.50 16.5 Gabbro 1-3% Sulphides

GW24-14 262.50-265.50 3.00 Felsic Dike 0.5% Sulphides

GW24-14 265.50-267.80 2.30 Breccia 1% Sulphides

2

GW24-14 267.80-272.00 4.20 Gabbro

GW24-14 272.00 End of Hole

Figure 1 shows the mineral zone in diamond drill hole GW24-14 from 197 meters to 207 meters.

Figure 1 GW24-14 Core Interval 197 to 209 Meters

Figure 2 shows the Logan zone drilling plan over a color background of aeromagnetics. Assays

are pending on holes GW24-08, GW24-09, GW24-13 and GW24-14. After hole 14, the drill was

moved 50 meters southeast to drill GW24-15.

Figure 2 Logan Zone Aeromagnetics, Diamond Drilling Plan

3

Click SLAM_NAI500_YouTube to view SLAM President & CEO Mike Taylor discussing the

Goodwin copper nickel project in a recent interview with Gilbert Chan of NAI 500.

QA-QC Procedures: The core was delivered to a secure facility in Bathurst New Brunswick for

detailed logging and sampling. The core descriptions and the summary log for hole s GW24-13

and GW24-14 are based on visual observations of the core. The results for holes GW24- 01 to

GW24-03 were previously reported by SLAM in news releases dated between July 30, 2024 and

August 12, 2024. The historic results from previous workers are derived from New Brunswick

assessment files that predate NI43-101 regulations. They can only be validated by additional

drilling.

About SLAM Exploration Ltd: About SLAM Exploration Ltd: SLAM Exploration Ltd. is a

public resource company with a substantial portfolio of mineral claim holdings in the mineral -

rich province of New Brunswick. The Company recently completed three diamond drill holes on

the Goodwin copper-nickel project in the BMC of New Brunswick. Highlights include:

• A 60.60-meter core interval grading 1.17% copper equivalent in hole GW24-03

• A 64.90-meter core interval grading 2.14% copper equivalent in hole GW24-02

The Company has reported additional holes drilled in a follow -up program currently in progress

at Goodwin. Assays are pending.

4

SLAM has discovered multiple gold veins on its wholly owned Menneval gold project. The

Company has reported gold- bearing core intervals, including 162.5 g/t gold over 0.2 meters and

56.90 g/t gold over 0.5 meters (news releases dated December 13, 2021, and November 22,

2022). Additionally, the Company reported quartz float grading up to 39.2 g/t gold on its Jake

Lee project, located near the Clarence Stream gold deposit, where Galway Metals Inc. is working

on a 2.3-million-ounce gold deposit in southern New Brunswick.

SLAM also owns the Mine Road copper -zinc-silver project, adjacent to the former producing

Heath Steele Mines property in the BMC. Previous workers have reported successful diamond

drill holes at Mine Road, including IL2014- 003, which intersected a 9- meter core interval

grading 14.51% zinc, 5.86% lead, 0.67% copper, and 139.9 g/t silver in the volcanogenic

massive sulphide Railroad Zone (Doe Run Canadian Exploration ULC; 2015, New Brunswick

Assessment Files, Report of Work 477877). The Railroad Zone is located 7,000 meters east of

the 20-million-tonne former producing Heath Steele B Zone.

Slam is a project generator and has received significant cash and share payments over the past

year. The Company holds NSR royalties and expects additional cash and share payments from

the Wedge copper-zinc project and the Ramsay, Reserve Creek, and Opikeigen gold projects.

To view SLAM’s corporate presentation, click SXL -Presentation. Additional information is

available on SLAM’s website and on SEDAR+ at www.sedarplus.ca . Follow us on X

@SLAMGold. .

Qualifying Statements: Mike Taylor P.Geo, President and CEO of SLAM Exploration Ltd., is a

qualified person as defined by National Instrument 43- 101, and has approved the contents of this

news release.

Certain information in this press release may constitute forward -looking information, including

statements regarding mineral resources and the Company’s plans with respect to the exploration and

development of its properties. This information is based on current expectations that are subject to

significant risks and uncertainties that are difficult to predict. Actual results might differ materially from

results suggested in any forward -looking statements. The Company assumes no obligation to update the

forward-looking statements, or to update the reasons why actual results could differ from those reflected

in the forward looking-statements unless and until required by securities laws applicable to the Company.

There are a number of risk factors that could cause future results to differ materially from those

described herein. Information identifying risks and uncertainties is contained in the Company's filings

with the Canadian securities regulators, which filings are available at www.sedarplus.ca . Neither the

TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts

responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Mike Taylor, President & CEO

Contact: 506-623-8960 [email protected]

5

Eugene Beukman, CFO

Contact: 604-687-2038 [email protected] SEDAR+: 00012459