Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SXL.V ·

SLAM DRILLING COPPER NICKEL SULPHIDE ZONE S Stepping Out From 60 Meter Copper Nickel Core Interval

Drill Results

N AQ

TSXV: SXL

SLAM DRILLING COPPER NICKEL SULPHIDE ZONE S

Stepping Out From 60 Meter Copper Nickel Core Interval

For Release 7:30 AM EST October 24, 2024

Miramichi, New Brunswick ‐ SLAM Exploration Ltd. (“SLAM” or the “Company”)

(TSXV-SXL) is pleased to announce preliminary drilling results from holes GW24- 06 and

GW24-07 on its wholly owned Goodwin Project located 35 kilometers south of the Caribou mine

and mill complex in the Bathurst Mining Camp (“BMC”) of New Brunswick.

GW24-06 intersected a 47.6 meter zone of sulphide mineralization from 45.45 meters to 93.05

meters. The Company has sawn 56 samples from this hole for shipment to ALS Chemex in

Moncton. This mineralization is similar to the zone in hole GW24- 03 that intersected 1.17%

copper equivalent over 60.60 meters as reported August 12, 2024. Hole GW24-06 is a 40 meter

step-out southeast of GW24-05 as shown on Figure 1. The summary log reads as follows:

Interval Meters Description Mineralization Hole GW24-06

0.00–11.87 Casing

11.87-45.45 Gabbro

45.45-62.43 Mineral Zone - Gabbro Pyrrhotite 15% to 20%

62.43-63.60 Mafic Dyke

63.60-92.55 Mineral Zone – Gabbro Pyrrhotite 15% to 20%

92.55-93.05 Mineral Zone - Massive

Sulphides

Pyrrhotite 85%

93.05-119.00 Gabbro

GW24-07 intersected a 39.48 meter zone of sulphide mineralization from 18.05 meters to 57.53

meters and another zone of 14.53 meters from 72.12 meters to 88.65 meters. The Company is

sawing 61 samples from this hole for shipment to ALS Chemex in Moncton. Th e mineralization

in GW 24-07 is more massive than the zone in hole GW24- 03 that intersected 1.17% copper

equivalent over 60.60 meters as reported August 12, 2024. Hole GW24-07is a 40 meter step out

to northwe st of GW24-04. All 5 Farquharson holes have been drilled at a dip of - 50 degrees

toward an azimuth of 040 degrees. The summary log reads as follows:

2

Interval Meters Description Mineralization Hole GW24-07

0.00 – 12.00 Casing

12.00-35.90 Gabbro Pyrrhotite 0.5%

35.90-106.40 Mineral Zone - Gabbro Pyrrhotite 10% to 30%

106.40-110.00 Mineralized Gabbro Pyrrhotite 1-3%

110.00-131.00 Gabbro Pyrrhotite-Pyrite 1-2%

131.00 End Of Hole

Figure 1 shows the Farquharson zone drilling plan over a background of gradient aeromagnetics.

Previous diamond drill hole GW24-03 is shown in black. Four holes shown in green were drilled

in the current campaign. All 4 holes cut Farquharson zone intercepts over a strike length of 120

meters. Assays are pending on holes GW24-04 and GW24- 05. Logging and sampling are near

completion on GW24-06 and GW24-07. After hole GW24-07, the drill was moved 1,100 meters

northwest to test the Logan zone.

Figure 1 Farquharson Aeromagnetic Gradient, Diamond Drilling Plan

3

Click SLAM_NAI500_YouTube to view SLAM President & CEO Mike Taylor discuss ing the

Goodwin copper nickel project in a recent interview with Gilbert Chan of NAI 500.

Figure 2 Hole GW24-06 Pyrrhotite Mineralization

QA-QC Procedures: The core was delivered to a secure facility in Bathurst New Brunswick for

detailed logging and sampling. The core descriptions and the summary log for hole s GW24-04

and GW24-05 are based on visual observations of the core. The results for holes GW24- 01 to

GW24-03 were previously reported by SLAM in news releases dated between July 30, 2024 and

August 12, 2024. The historic results from previous workers are derived from New Brunswick

assessment files that predate NI43-101 regulations. They can only be validated by additional

drilling.

About SLAM Exploration Ltd: SLAM Exploration Ltd. is a public resource company with a

substantial portfolio of mineral claim holdings in the mineral- rich province of New Brunswick.

The Company recently completed three diamond drill holes on the Goodwin copper -nickel

project in the BMC of New Brunswick. Highlights include:

• A 60.60-meter core interval grading 1.17% copper equivalent in hole GW24-03

• A 64.90-meter core interval grading 2.14% copper equivalent in hole GW24-02

• A 35-meter core interval grading 1.36% copper equivalent in hole GW24-01

Based on these drilling intercepts, the Company has expanded the Goodwin Project which now

comprises 194 units covering 4,239 hectares. Drilling resumed on October 10, 2024.

SLAM has discovered multiple gold veins on its wholly owned Menneval gold project. The

Company has reported gold- bearing core intervals, including 162.5 g/t gold over 0.2 meters and

56.90 g/t gold over 0.5 meters (news releases dated December 13, 2021, and November 22,

4

2022). Additionally, the Company reported quartz float grading up to 39.2 g/t gold on its Jake

Lee project, located near the Clarence Stream gold deposit, where Galway Metals Inc. is working

on a 2.3-million-ounce gold deposit in southern New Brunswick.

SLAM also owns the Mine Road copper -zinc-silver project, adjacent to the former producing

Heath Steele Mines property in the BMC. Previous workers have reported successful diamond

drill holes at Mine Road, including IL2014- 003, which intersected a 9 -meter core interval

grading 14.51% zinc, 5.86% lead, 0.67% copper, and 139.9 g/t silver in the volcanogenic

massive sulphide Railroad Zone (Doe Run Canadian Exploration ULC; 2015, New Brunswick

Assessment Files, Report of Work 477877). The Railroad Zone is located 7,000 meters east of

the 20-million-tonne former producing Heath Steele B Zone.

The Company is a project generator and has received significant cash and share payments over

the last nine months, including:

• $150,000 cash and 50,000 shares from S2 Minerals Inc. (STWO) on December 19, 2023,

pursuant to the Reserve Creek gold agreement.

• 534,000 shares and 333,000 warrants (exercisable at $0.01) from Nine Mile Metals Inc.

(NINE) on March 1, 2024, pursuant to the Wedge Project agreement.

• $25,000 cash plus 2,500,000 shares of Lode Gold Resources Inc. (LOD) pursuant to the

Ramsay Gold agreement.

The Company holds NSR royalties and expects additional cash and share payments from the

Wedge copper-zinc project and the Ramsay, Reserve Creek, and Opikeigen gold projects.

To view SLAM’s corporate presentation, click SXL -Presentation. Additional information is

available on SLAM’s website and on SEDAR+ at www.sedarplus.ca . Follow us on X

@SLAMGold.

Qualifying Statements: Mike Taylor P.Geo, President and CEO of SLAM Exploration Ltd., is a

qualified person as defined by National Instrument 43- 101, and has approved the contents of this

news release.

Certain information in this press release may constitute forward -looking information, including

statements regarding mineral resources and the Company’s plans with respect to the exploration and

development of its properties. This information is based on current expectations that are subject to

significant risks and uncertainties that are difficult to predict. Actual results might differ materially from

results suggested in any forward -looking statements. The Company assumes no obligation to update the

forward-looking statements, or to update the reasons why actual results could differ from those reflected

in the forward looking-statements unless and until required by securities laws applicable to the Company.

There are a number of risk factors that could cause future results to differ materially from those

described herein. Information identifying risks and uncertainties is contained in the Company's filings

with the Canadian securities regulators, which filings are available at www.sedarplus.ca . Neither the

5

TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts

responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Mike Taylor, President & CEO

Contact: 506-623-8960 [email protected]

Eugene Beukman, CFO

Contact: 604-687-2038 [email protected] SEDAR+: 00012459