Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SXL.V ·

SLAM DIAMOND DRILLING FOR GOLD Drilli ng To Test Multiple Gold Veins

Exploration Programs

TSXV: SXL

SLAM DIAMOND DRILLING FOR GOLD

Drilli ng To Test Multiple Gold Veins

For Immediate Release, September 29, 2021

Miramichi, New Brunswick ‐ SLAM Exploration Ltd. (“SLAM” or the “ Company” on TSXV: SXL ) is

pleased to announce it has completed 10 diamond drill holes for a total of 7 19 metres at its wholly-

owned Menneval gold project located in the mineral -rich province of New Brunswick . The first 4 holes

numbered BG21-09 TO BG21-12 tested the No. 18 vein where the Company reported visible gold with

assay results grading up to 3,955 g/t gold over 0.10 m thick from a trench sample as reported by the

Company on December 03, 2020.

Hole BG21-12 tested the original No. 9 vein. Holes BG21 -13 to BG21 -18 tested vein No . 22 over an 80

metre strike length. All 10 holes intersected quartz veins. Visible gold was noted in one hole. Logging

and sampling are in progress as drilling continues. To date 102 samples sawn from holes BG21 -09 to

BG21-14 have been submitted to the lab. The drill is currently set up to test the No. 2 vein where assays

up to 353 g/t gold were reported October 07, 2020 from trenching results. For additional information

and maps visit Menneval Gold Project.

The Menneval Project: The Menneval Gold project is SLAM’s flagship project , the Company intends to

focus on testing the strike and depth extent of the swarm of new gold veins discovered in 2020. The

expanded property is comprised of 572 mineral claim units covering 12,390 hectares located in

northwestern New Brunswick. The Company holds a 100% interest in these claims with the exception of

4 claim units covering 105 hectares that are subject to a 1.5% NSR. The Company can buy down 0.5% of

the NSR for $500,000 and it has the right of first refusal on the remaining 1% NSR.

About SLAM Exploration Ltd:

SLAM is a project -generating resource company focused on is its flagship Menneval Gold project where

the 2021 trenching program is underway. The Company intends to conduct preliminary prospecting and

geochemistry on the Gold Brook, Birch Lake gold, Wilson gold and Ramsay gold projects in the vicinity of

the Millstream Break in northern New Brunswick. SLAM also expects to conduct preliminary programs

on the Jake Lee, Mount Victor and other gold properties on the flanks of the Sawyer Brook and Wheaton

Bay faults in southern New Brunswick . SLAM owns the Reserve Creek, Opikeigen and Miminiska gold

projects in Ontario and the Mount Uniacke gold project in Nova Scotia. The Company owns a portfolio of

base metal properties in the Bathurst Mining Camp (“BMC”) that is subject to an option agreement .

SLAM holds NSR royalties on the Superjack, Nash Creek and Coulee zinc-lead-copper-silver properties in

the BMC.

The Company has generated cash from the sale of securities received from mineral property option

agreements with other companies and has sufficient funds for the work currently in progress. The

2

Company has applied for funding assistance u p to $100,000 under the New Brunswick Junior Mining

Assistance Program in support of a proposed 2021 drilling program. Additional information about SLAM

and its projects is available at www.slamexploration.com or from SEDAR filings at www.sedar.com.

Follow us on twitter @SLAMGold.

QA‐QC Sampling Procedures

The trenching and soil geochemical results referenced above were previously reported as were the QA -

QC Sampling Procedures.

Qualifying Statements: Mike Taylor P.Geo, President and CEO of SLAM Exploration Ltd., a qualified

person as defined by National Instrument 43 -101, approves the technical information contained in this

news release.

Certain information in this press release may constitute forward- looking information, including statements

that address the Pri vate Placement, the closing of the Private Placement, future production, reserve

potential, exploration and development activities and events or developments that the Company expects.

This information is based on current expectations that are subject to si gnificant risks and uncertainties

that are difficult to predict. Actual results might differ materiall y from results suggested in any forward-

looking statements. The Company assumes no obligation to update the forward- looking statements, or to

update the reasons why actual results could differ from those reflected in the forward looking- statements

unless and until required by securities laws applicable to the Company. There are a number of risk factors

that could cause future results to differ materially fr om those described herein. Information identifying

risks and uncertainties is contained in the Company's filings with the Canadian securities regulators,

which filings are available at www.sedar.com. Neither the TSXV nor its Regulation Services Provider (as

that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this

release.

CONTACT INFORMATION:

Mike Taylor, President & CEO

Contact: 506-623-8960 [email protected]

Eugene Beukman, CFO

Contact: 604-687-2038 [email protected] SEDAR: 00012459E