Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SXL.V ·

Slam CEO Talking About MINE ROAD Acquisition at Pdac Core Intervals to 14.51% Zinc, 5.86% Lead, 0.67% Copper and 139.9 G/T Silver

Drill Results

N bmh AQ

TSXV: SXL

SLAM CEO TALKING ABOUT MINE ROAD

ACQUISITION AT PDAC

CORE INTERVALS TO 14.51% ZINC, 5.86% LEAD, 0.67% COPPER AND

139.9 G/T SILVER

For Immediate Release, March 4, 2024

Miramichi, New Brunswick ‐ SLAM Exploration Ltd. (TSXV-SXL) (“SLAM” or the

“Company”) announces that CEO Mike Taylor is doing a presentation at The Atlantic Edge

Investors Program at P DAC at 3:00 PM Tuesday, March 5 about SLA M’s Mine Road zinc

copper silver acquisition reported in a news release September 6, 2023. The Mine Road project is

host to 6 volcanic massive sulphide (“VMS”) occurrences spread over a 9.555 hectare group of

mineral claims adjacent to the former producing Heath Steele mine in the mineral-rich Bathurst

Mining Camp (“BMC”) of northern New Brunswick. For more information on the Atlantic Edge

Program, click the Atlantic Edge Investors Program .

Historic Mine Road Drilling: Diamond drill hole IL2014 -003 cored a 9 metre interval grading

14.51% zinc, 5.86% lead, 0.67% copper and 139.9 g/t silver on the Railroad zone. Diamond drill

hole IL2018-01 intersected 7.0 meters of 0.9% copper on the Roche T rend, 5 kilometres

southwest of the R ailroad Zone. This drilling data is a small sample of the wealth of data

resulting from $1,448,000 in exploration expenditures applied to the Mine Road project during

the past 1 2 years. Current assessment work credits of $428,776 are available for future claim

renewals.

Drill-Ready VMS Targets At Mine Road : The Railroad and Roche zones are open to test for

potential extensions at depth and along strike. Other targets include the Island Lake, Captain

West, Sandburn Brook and Brunsman VMS occurrences along with a number of untested

airborne conductors and magnetic anomalies.

Infrastructure: The Mine Road project is located on the Mine Road (Route 430) which

connects the former Heath Steele mine to the city of Miramichi 60 kilometres to the southeast.

The claims are accessed from this paved road and a series of logging roads. Electric power is

available from lines that connect Heath Steele to the New Brunswick power grid.

Mine Road Project: SLAM has acquired 3 additional mineral claims s ince acquisition of the

Mine Road project. The expanded project now covers 9,555 hectare s of mineral potential

adjacent to the former producing Heath Steele mine property where 21 M tonnes were mined

2

from 1957 to 1996. A total of 2,330 million pounds of zinc, 833 million pounds of lead, 446

million pounds of copper and 45 million ounces of silver were processed. (For reference, these

numbers are derived from: McCutcheon, S.R. (compiler) 1997; Geology and massive sulphides

of the Bathurst Camp, New Brunswick; Geological Association of Canada - Mineralogical

Association of Canada, Joint Annual Meeting, Ottawa ’97, Field Trip B7, Guidebook, 85 p.)

About SLAM Exploration Ltd: SLAM holds a large portfolio of mineral claim holdings in the

mineral-rich province of New Brunswick. The flagship is SLAM’s wholly owned Menneval gold

project in northern New Brunswick. SLAM has discovered multiple gold- bearing veins and

previously reported gold bearing core intervals including 162.5 g/t gold over 0.2 m and 56.90 g/t

gold over 0.5 m (news releases December 13, 2021 and Nov 22, 2022) The Company has also

reported significant gold discoveries in southern New Brunswick on its Jake Lee and Highway

projects in the vicinity of the Clarence Stream gold deposit where Galway Metals Inc. is working

on a 2.3 M ounce gold deposit . The Highway project has demonstrated polymetallic potential

with 10 known mineral occurrences that include zinc, silver, copper, cobalt, molybdenum and tin

as well as gold.

The Company recently added the Mine Road zinc silver project to its base metal portfolio in the

mineral rich Bathurst Mining Camp of New Brunswick. Previous workers drilled massive

sulphide zones including with 2 massive sulphide intervals in hole IL 2014-003 with a 9 metre

core interval grading 14.51% zinc, 5.86% lead, 0.67% copper and 139.9 g/t silver and a 3 metre

interval grading 6.57% zinc, 2.78% lead, 0.46% copper, and 68.1 g/t silver.

The Company holds NSR royalties and expects additional cash and share payments on the

Wedge copper zinc project. SLAM also holds NSR royalties and may receive addition cash and

share payments on the Ramsay, Reserve Creek and Opikeigen gold projects.

To view SLAM’s corporate presentation, click SXL -Presentation. Additional information is

available on SLAM ’s website and on SEDAR+ at www.sedarplus.ca. Follow us on X

@SLAMGold.

QA-QC Procedures: The drilling results described above are from assessment reports by well

established mining firms with assays from commercial laboratories. The assessment reports

included a summary of QA-QC procedures and the Company deems these results to be reliable.

Qualifying Statements: Mike Taylor P.Geo, President and CEO of SLAM Exploration Ltd., is a

qualified person as defined by National Instrument 43- 101, and has approved the contents of this

news release.

Certain information in this press release may constitute forward- looking information, including statements

regarding mineral resources and the Company’s plans with respect to the exploration and development of its

properties. This information is based on current expectations that are subject to significant risks and uncertainties

that are difficult to predict. Actual results might differ materially from results suggested in any forward -looking

statements. The Company assumes no obligation to update the forward- looking statements, or to update the reasons

why actual results could differ from those reflected in the forward looking- statements unless and until required by

securities laws applicable to the Company. There are a number of risk factors that could cause future results to

differ materially from those described herein. Information identifying risks and uncertainties is contained in the

3

Company's filings with the Canadian securities regulators, which filings are available at www.sedarplus.ca. Neither

the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts

responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Mike Taylor, President & CEO

Contact: 506-623-8960 [email protected]

Eugene Beukman, CFO

Contact: 604-687-2038 [email protected] SEDAR+: 00012459