Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SXGC.TO ·

Mawson Provides Drilling Update FOR Finland and USA

Exploration Programs

1305 – 1090 West Georgia Street, Vancouver, BC, V6E 3V7

Phone: +1 604 685 9316 / Fax: +1 604 683 1585

NEWS RELEASE DECEMBER 06, 2018

MAWSON PROVIDES DRILLING UPDATE FOR FINLAND AND USA

Vancouver, Canada – Mawson Resources Limite d (“Mawson”) or (the “Company”) (TSX:MAW)

(Frankfurt:MXR) (PINKSHEETS: MWSNF) provides an update on the Company’ s drill programs targeting gold and

cobalt in Finland and gold in the USA.

Key Points:

 Drilling is now complete at the Company’s Western USA proj ect (“WUSA”) in Oregon where a total of 4 holes (one

abandoned) were drilled for 1,033 metres at the Scorpion intermediate-sulphidation and Huckleberry high-sulphidation

projects. Wide zones of silica, argillic and sulphidic alterati on were intersected at both prospect areas. Drill core has

been sent for assay and results will be released in the New Year;

 The autumn diamond drill program in Finland has now ended, with a total of 11 holes for 1,660 metres (PAL0148-158)

at the Hirvimaa and Korkiakoivikko prospects (Figure 1), loca ted 2.6 to 4.3 kilometres from high-grade gold-cobalt

mineralization drilled at Rajapalot. The program tested base-of-till geochemical and geophysical anomalies as potential

extensions to known mineralization. The host stratigraphic horizon was intersected in 3 drill holes with a best result of

2 metres @ 1,078 ppm cobalt from 111.3 metres in PAL0157;

 Planning for a large winter diamond drill program of 15,000 me tres (subject to final permitting) at Rajapalot is well

underway and is set to start during January 2019;

Mr. Hudson, Chairman and CEO, states, " At the WUSA project, highly altered and sulphidic rocks were intersected beneath

strong gold anomalies in soils at Scorpion and pathfinder-metal rock chip anomalies at Huckleberry. Such strong alteration

is encouraging in these new systems, with results anticipated to be released in Q1 2018.

In Finland, although the mineralized host position was discovered in multiple ho les at two prospects, the relatively minor

structural overprint is interpreted to have limited the develo pment of higher gold and cobalt grades. Further work is

underway to define targets outside the 3.5 kilometre mineralized trend at Rajapalot, where a maiden resource calculation

is being finalized and a 15,000 metre winter drill program (subject to final permitting) is set to begin during January 2019.”

At the WUSA project, 4 diamond drill holes for 1,033 metres were completed (Figures 2 and 3), with 3 drill holes at

Huckleberry (one abandoned) and one at Scorpion. Intense silic ification and argillic alteration of porphyritic andesite and

quartz phyric latite was intersected in all drill holes. Iron oxides and pyrite were commonly associated with brecciation and

stockwork fractures and disseminated pyrite was present throughout more weakly altered hosts. Assays and drill logs will

be available for reporting during Q1 2019.

In Finland, drilling was conducted at the satellite Hirvimaa an d Korkiakoivikko prospects to test a combination of base-of-

till anomalies, conductors recognized in VTEMplus data and the inferred location of the stratigraphic host to the gold-cobalt

mineralization. Korkiakoivikko is located 4. 3 kilometres south of the Raja prospect and Hirvimaa is located 2.6 kilometres

north east of Palokas (Figure 1). At Hirvimaa, the mineralized stratigraphic horizon was intersected in drill holes PAL0149,

PAL0150 and PAL0152. PAL0151 was abandoned after intersecting a fractured and faulted quartz vein. Minor sulphides and

weak metal anomalism were associated with the inferred stratigraphic host. Besides the inferred stratigraphic metasediment

host, weakly mineralized sections were found in mafic volcanics/sills with sulphide and magnetite dissemination and veins.

Best results were 2 metres @ 1,078 ppm cobalt from 111.3 metres in PAL0157 and 3 metres @ 384 ppm cobalt from 28.0

metres in PAL0156. The absence of a later structural control appears to have limited the formation of higher grades of gold

and cobalt. The Korkiakoivikko drill hole (PAL0148) was aimed at a large late-time VTEMplus anomaly in the south western

corner of the permit. The boundary between a sequence of dolomitic carbonates and marls with a quartzite marked a short

carbonaceous and sulphidic unit (approximately 6 metres wide from 91.7 metres) with weakly anomalous gold, tungsten,

molybdenum, bismuth, copper and nickel characteristic. This stratigraphic unit appears to be the source of the VTEM plus

anomaly and appears to lack the structural and hydrothermal overprint of the high-grade gold-cobalt prospects seen 4.3

kilometres north.

Plan view of drill locations are provided in Figures 1-3. Tables 1 and 2 show all relevant collar information. Table 3 shows

better intersections from Finland. In Finland, assuming a predominant stratabound control, the true thickness of the

mineralized interval is interpreted to be approximately 90-95% of the sampled thickness. Intersections are reported with a

lower cut of 0.5 g/t gold or 0.5 g/t gold equivalent when co balt assays were available, over 1 metre width and no upper

cut-off was applied. The gold equivalent (AuEq) value was calculated using the following formula: AuEq=Au+Co/608 based

on assumed prices of Co $30/lb and Au $1,250/oz.

Technical Background

In Finland, one diamond drill rigs from MK Core Drilling OY (“MK”), with water recirculation and drill cuttings collection systems was used

for the drill program. Core diameter was NQ2 (50.7 mm). Core recoveries were excellent and average close to 100% in fresh rock. After

photographing and logging in Mawson’s Rovaniemi facilities, core intervals averaging 1 metre for mineralized samples and 2 metres for

barren samples were cut in half at the Geol ogical Survey of Finland (GTK) core facilities in Rovaniemi, Finland. The remaining half core

is retained for verification and reference purposes. Analytical samples were transported by Mawson personnel or commercial tran sport

from site to the ALSGlobal facility in Sodankylä, Finland. Samples were prepared and analyzed for gold and multi-elements at ALSGlobal,

gold by method Au-ICP22 (fire assay and ICP-AES, 50 g sub-sample) and multi-elements by ME-MS61 (four acid digest and ICP analysis).

At the WUSA project, one diamond drill rigs from Idea Drilling was used for the drill program. Core diameter was HQ (63.5 mm). Core

recoveries were moderate and averaged 90% in fresh rock. After photographing and logging in Mawson’s Oregon facilities, core intervals

averaging 1.5 metres were cut in half at ALS Chemex’s facilities in Reno Nevada. The remaining half core has been retained for verification

and reference purposes. Analytical samples were prepared and analyzed for gold and multi-element geochemistry at ALS Chemex using

the Au-ICP22 and ME-MS61 techniques.The QA/Q C program of Mawson consists of the system atic insertion of certified standards of

known gold content, duplicate samples by quartering the core, and blanks the within interpreted mineralized rock. In addition, CRS inserts

blanks and standards into the analytical process. The qualified person for Mawson's Finnish projects, Dr. Nick Cook, President for Mawson

and Fellow of the Australasian Institute of Mining Metallurgy has reviewed and verified the contents of this release.

About Mawson Resources Limited (TSX:MAW, FRANKFURT:MXR, PINKSHEETS:MWSNF)

Mawson Resources Limited is an exploration and development company. Mawson ha s distinguished itself as a leading Nordic Arctic

exploration company with a focus on the flagship Rompas and Rajapalot gold projects in Finland.

On behalf of the Board,

"Michael Hudson"

Michael Hudson, Chairman & CEO

Further Information

www.mawsonresources.com

1305 – 1090 West Georgia St., Vancouver, BC, V6E 3V7

Mariana Bermudez (Canada), Corporate Secretary, +1 (604) 685 9316,

[email protected]

Forward-Looking Statement

This news release contains forward-looking statements or forward-looking information within the meaning of applicable securitie s laws (collectively,

"forward-looking statements"). All statements herein, other than statements of historical fact, are forward-looking statements. Although Mawson believes

that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically

identified by words such as: believe, expect, anticipate, intend, estimate, postulate, and similar expressions, or are those, which, by their nature, refer to

future events. Mawson cautions investors that any forward-looking statements are not guarantees of future results or performance, and that actual results

may differ materially from those in forward-looking statements as a result of various factors, including, but not limited to, capital and other costs varying

significantly from estimates, changes in world metal markets, ch anges in equity markets, planned drill programs and results var ying from expectations,

delays in obtaining results, equipment failure, unexpected geological conditions, local community relations, dealings with non-governmental organizations,

delays in operations due to permit grants, environmental and safety risks, and other risks and uncertainties disclosed under the heading "Risk Factors" in

Mawson's most recent Annual Information Form filed on www.sedar.com. Any forward-looking statement speaks only as of the date o n which it is made

and, except as may be required by applicable securities laws, Mawson disclaims any intent or obligation to update any forward-looking statement, whether

as a result of new information, future events or results or otherwise.

Table 1: Collar Information from 2018 Autumn drilling at the Rajapalot Project (Finnish Grid, Projection KKJ2003)

HoleID East North Azimuth Dip RL Depth (m) Prospect Reported

PAL0148 3410601.9 7368194.3 149.5 -60.8 131.2 266.3 Korkiakoivikko Here

PAL0149 3410584.6 7374738.2 150.7 -59.9 178. 4 130.1 Hirvimaa Here

PAL0150 3410547.7 7374791.5 151.8 -60.6 179.6 136.6 Hirvimaa Here

PAL0151 3410958.6 7374848.3 170.0 -60. 0 179.4 15.1 Hirvimaa Abandoned. Here

PAL0152 3410959.6 7374846.3 167.4 -60.3 179.4 200.5 Hirvimaa Here

PAL0153 3410999.1 7374407.9 141.1 -60.2 172. 5 140.5 Hirvimaa Here

PAL0154 3411028.9 7374366.6 139.8 -60.1 172.7 91.1 Hirvimaa Here

PAL0155 3410864.1 7374328.3 139.9 -59.4 172. 4 169.9 Hirvimaa Here

PAL0156 3410907.1 7374278.4 139.9 -58.9 173.5 140.8 Hirvimaa Here

PAL0157 3410648.1 7374380.5 140.2 -60.2 172. 8 149.2 Hirvimaa Here

PAL0158 3411509.8 7374817.7 163.6 -60.6 180.1 219.9 Hirvimaa Here

Table 2: Collar Information from 2018 drilling at the WUSA Project (NAD27 Grid, Projection UTM Zone 10N)

HoleID East North Azimuth Dip Depth (m) Prospect Reported

HDH-001-18 512830.0 4816186.0 341.9 -58.7 395.6 Huckleberry Results pending

HDH-002-18 513045.0 4816413.0 350.0 -60.0 112.8 Huckleberry Abandoned. Results pending

HDH-003-18 513045.0 4816413.0 351.2 -65.6 282.8 Huckleberry Results pending

SDH-001-18 495294.0 4822665.0 295.2 -58.3 241.7 Sc orpion Results pending

Table 3: Better intersections from the Finland 2018 Autumn Drill Program. Intersections are reported with a lower cut of 0.5g/t gold over 2 metre lower

cut, except where indicated by **. No upper cut-off was applied.

Hole ID Depth

From

(m)

Depth

To (m)

Width

(m)

Au (g/t) Co ppm Au Eq

(g/t)

Date Reported

PAL0153 30.4 30.8 0.4 0.015 493 0.83 Here

PAL0153 119.3 120.3 1.0 0.003 414 0.68 Here

PAL0156 28.0 31.0 3.0 0.004 384 0.64 Here

PAL0157 111.3 113.3 2.0 0.003 1,078 1.78 Here