Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

SWA.V ·

Sarama Resources Reports Q1 2017 Drill Results FOR Karankasso Project IN Burkina Faso

Drill Results

MARCH 3, 2017

SARAMA RESOURCES REPORTS Q1 2017 DRILL RESULTS FOR

KARANKASSO PROJECT IN BURKINA FASO

VANCOUVER, CANADA. Sarama Resources Ltd. (the “Company” or “Sarama”) advises that Savary Gold Corp. (“Savary”),

the operator of the Karankasso Project Joint Venture7 between Sarama and Savary, provided an update on March 3, 2017

of ongoing drilling campaigns. The drilling was undertaken across multiple target zones in the Serakoro 1 property within

the Karankasso Project area.

Highlights

Note: mineralisation true widths are estimated at 65 -80% of listed downhole intersection lengths except HE-RC-006 and HE-RC-007

where there is not enough information to estimate true widths

Note: assays in hole HE-RC-17-019 have been top-cut to 30 g/t Au to produce main reported composite

Further details of these drill results, including sampling an d QA/QC procedures, are contained in Savary’s news release

dated March 3, 2017.

Sarama’s President and CEO, Andrew Dinning, commented:

“The results reflect early stage explora tion on the Serakoro 1 property. Sarama looks forward to the integration of

recently collected geophysical, geochemical and prospecting data into the forward exploration program to reinforce

target quality.”

For further information on the Company’s activities, please contact:

Andrew Dinning or Paul Schmiede

e: [email protected]

t: +61 (0) 8 9363 7600

• 24 holes totalling approximately 3,000 metres of reverse-circulation ("RC") were completed.

• Downhole intersections highlighted by Savary include:

HE-RC-17-006 11m @ 2.26 g/t Au from 84m including 4m @ 4.00 g/t Au from 89m

HE-RC-17-007 3m @ 2.51 g/t Au from 64m including 1m @ 6.50 g/t Au from 64m

HE-RC-17-009 7m @ 1.85 g/t Au from 28m including 3m @ 3.19 g/t Au from 32m

HE-RC-17-010 4m @ 2.20 g/t Au from 50m including 2m @ 3.90 g/t Au from 52m

HE-RC-17-012 17m @ 2.55 g/t Au from 18m including 7m @ 3.45 g/t Au from 27m; and

1m @ 11.05 g/t Au from 32m

HE-RC-17-014 3m @ 2.26 g/t Au from 34m including 1m @ 5.44 g/t Au from 35m

HE-RC-17-019 6m @ 14.66 g/t Au from 30m including 4m @ 21.69 g/t Au from 31m; incl.

1m @ 78.10 g/t Au from 32m

5m @ 1.69 g/t Au from 47m

• Follow-up drilling on selected targets is planned for Q1/Q2 2017.

ABOUT SARAMA RESOURCES LTD

Sarama Resources Ltd (TSX -V: SWA) is a West African focused gold explorer with substantial landholdings in Burkina

Faso. Sarama is focused on consolidating under -explored landholdings in Burkina Faso and other established mining

jurisdictions.

Sarama’s flagship properties are situated within the Company’s South Houndé Project area in south-west Burkina Faso.

Located within the prolific Houndé Greenstone B elt, Sarama’s exploration programs have built on significant early

success to deliver an inferred mineral resource estimate of 2.1 Moz gold 1,2. Acacia Mining plc is earning up to a 70%

interest in the South Houndé Project by satisfying certain conditions, including funding earn- in expenditures of up to

US$14 million, over a 4-year earn-in period and may acquire an additional 5% interest, for an aggregate 75% interest in

the Project, upon declaration of a minimum mineral reserve of 1.6 million ounces of gold.

Sarama holds a 3 1% participating interest in the Karankasso Project Joint Venture (“ JV”) which is situated adjacent to

the Company’s South Houndé Project in Burkina Faso and is a JV between Sarama and Savary Gold Corp. (“ Savary”).

Savary is the operator of the JV and in October 2015, declared a maiden inferred mineral resource estimate of 671,000

ounces of contained gold3,4 at the Karankasso Project JV.

Sarama has also agreed to acquire a 100% interest in the Bondi D eposit from Orezone Gold Corporation (refer news

release May 24, 2016). Bondi has a historical estimate of mineral resources of 0.3Moz Au (measured and indicated) and

0.1Moz Au (inferred)5,6.

Together, the South Houndé Project, Bondi Deposit and the Karankasso Project form a cluster of advanced gold deposits,

within trucking distance of one another, which potentially offers a development option for a multi -source fed central

processing facility in the southern Houndé Belt region of Burkina Faso.

Incorporated in 2010, the Company’s Board and management team have a proven track record in Africa and a strong

history in the discovery and development of large-scale gold deposits. Sarama is well positioned to build on its current

success with a sound exploration strategy across its property portfolio.

1. 43.0 Mt @ 1.5 g/t Au (reported above cut- off grades ranging 0.3 -2.2 g/t Au, reflecting the mining methods and processing flowsheets

assumed to assess the likelihood of the inferred mineral resources having reasonable prospects for eventual economic extraction)

2. The effective date of the Company’s inferred mineral resource estimate is February 4, 2016. For further information regarding the mineral

resource estimate please refer to the technical report titled “NI 43-1 01 Independent Technical Report South Houndé Project Update,

Bougouriba and Ioba Provinces, Burkina Faso,” dated March 31, 2016. The technical report is available under Sarama Resources Ltd.’s

profile on SEDAR at www.sedar.com.

3

. 9.2 Mt @ 2.3 g/t Au (at a 0.5 g/t Au cut-off)

4. The effective date of the Karankasso Project JV mineral resource estimate is October 7, 2015. For further information regarding the mineral

resource estimate please refer to the technical report titled “Technical Report and Resource Estimate on the Karankasso Project, Burkina

Faso,” dated October 7, 2015. The technical report is available under Savary Gold Corp’s profile on SEDAR at www.sedar.com. Sarama has

not independently verified Savary’s mineral resource estimate and takes no responsibility for its accuracy.

5

. 4.1Mt @ 2.1g/t Au for 282,000 oz Au (measured and indicated) and 2.5Mt @ 1.8g/t Au for 149,700 oz Au (inferred), reported at a 0.5 g/t

Au cut-off

6. The effective date of the historical estimate of the Bondi Deposit mineral resource estimate is February 20, 2009. For further information

regarding the mineral resource estimate please refer to the technical report titled “Technical Report on the Mineral Resource of the Bondigui

Gold Project,” dated February 20, 2009. The technical report is available under Orezone Gold Corporation’s profile on SEDAR at

www.sedar.com.

7

. Sarama has 31% and Savary Gold has 69% ownership interests

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Information in this news release that is not a statement of historical fact constitutes forward- looking information. Such forward-looking information

includes statements regarding the use of proceeds from the private placement, for drilling and geochemical and geophysical surveys at the South

Houndé Project, the Earn-In Agreement with Acacia, including the amounts that may be spent on exploration and interests in the South Houndé Project

that may be earned by Acacia upon making certain expenditures and estimating a minimum reserve, the potential to expand the present oxide

component of the Company’s existing estimated mineral resources,, future exploration plans and the potential development of the Bondi, Karankasso

and South Houndé Projects on a combined basis. Actual results, performance or achievements of the Company may vary from the results suggested

by such forward-looking statements due to known and unknown risks, uncertainties and other factors. Such factors include, among others, that the

business of exploration for gold and other precious minerals involves a high degree of risk and is highly speculative in nature; Mineral Resources are

not Mineral Reserves, they do not have demonstrated economic viability, and there is no certainty that they can be upgraded to Mineral Reserves

through continued exploration; few properties that are explored are ultimately developed into producing mines; geological factors; the actual results

of current and future exploration; changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company’s

publicly filed documents. There can be no assurance that any mineralisation that is discovered will be proven to be economic, or that future required

regulatory licensing or approvals will be obtained. However, the Company believes that the assumptions and expectations reflected in the forward-

looking information are reasonable. Assumptions have been made regarding, among other things, Acacia’s continued funding of exploration activities,

the Company’s ability to carry on its exploration activities, the sufficiency of funding, the timely receipt of required approvals, the price of gold and

other precious metals, that the Company will not be affected by adverse political events, the ability of the Company to operate in a safe, efficient and

effective manner and the ability of the Company to obtain further financing as and when required and on reasonable terms. Readers should not place

undue reliance on forward-looking information.

Sarama does not undertake to update any forward-looking information, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

QUALIFIED PERSONS’ STATEMENT

Scientific or technical information in this news release that relates to the preparation of the Company’s mineral resource estimate is based on

information compiled or approved by Adrian Shepherd. Adrian Shepherd is an employee of Cube Consulting Pty Ltd and is considered to be independent

of Sarama Resources Ltd. Adrian Shepherd is a Chartered Professional Member in good standing of the Australasian Institute of Mining and Metallurgy

and has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to

qualify as a Qualified Person under National Instrument 43-101. Adrian Shepherd consents to the inclusion in this news release of the information, in

the form and context in which it appears.

Scientific or technical information in this news release that relates to the preparation of the Karankasso Project’s mineral resource estimate is based

on information compiled or approved by Eugene Puritch and Antoine Yassa. Eugene Puritch and Antoine Yassa are employees of P&E Mining

Consultants Inc. and are considered to be independent of Savary Gold Corp. and Sarama Resources Ltd. Antoine Yassa is a member in good standing

of the Ordre des Géologues du Québec and Eugene Puritch is a member in good standing of Professional Engineers Ontario. Eugene Puritch and Antoine

Yassa have sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which they are

undertaking to qualify as a Qualified Person under National Instrument 43-101. Eugene Puritch and Antoine Yassa consent to the inclusion in this news

release of the information, in the form and context in which it appears. Sarama has not independently verified Savary’s mineral resource estimate

and takes no responsibility for its accuracy.

Scientific or technical information in this news release, in respect of the Bondi Deposit relating to mineral resource and exploration information drawn

from the Technical Report prepared for Orezone on that deposit has been approved by Guy Scherrer. Guy Scherrer is an employee of Sarama Resources

Ltd and is a member in good standing of the Ordre des Géologues du Québec and has sufficient experience which is relevant to the commodity, style

of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 4 3-101. Guy

Scherrer consents to the inclusion in this report of the information, in the form and context in which it appears.